Files
function-gemma-new/training_data_manual_curated.csv
ModelHub XC 1951b0e4a3 初始化项目,由ModelHub XC社区提供模型
Model: talha970/function-gemma-new
Source: Original Platform
2026-05-31 00:34:26 +08:00

289 KiB

1mark this open we're pulling the old carpet in room 305edit_task{"title":"Replace carpet in office","location":"room 305","status":"open"}
2ray is taking the electrical rough in in parking garage level 1 this is electrical work make it critical done by may 18 crew of 2 budget 20000 mark completeedit_task{"title":"Run electrical rough-in","location":"parking garage level 1","category":"electrical","assignee":"Ray","status":"complete","end_date":"2026-05-18","priority":"p1","manpower":"2","cost":"20000"}
3put 2 workers on itedit_task{"manpower":"2"}
4jake is leading the concrete pour on the roof deck start may 6 finish wednesday cost 8000 need 10 guys mark it closededit_task{"title":"Pour concrete slab","location":"roof deck","assignee":"Jake","status":"closed","start_date":"2026-05-06","end_date":"2026-05-06","manpower":"10","cost":"8000"}
5gotta get the low voltage cabling done by may 7 crew of 1 should be enough make it medium priority and assign tonyedit_task{"title":"Install low voltage cabling","assignee":"Tony","end_date":"2026-05-07","priority":"p2","manpower":"1"}
6replace the broken faucet on level 4 put zack on it make it urgent and get it done by end of monthedit_task{"title":"Replace broken plumbing fixture","location":"level 4","assignee":"Zack","end_date":"2026-05-29","priority":"p1"}
7carpet replacement in suite 4b on s1 starts next tuesday wraps up wednesday crew of 2 cost is 5000 make it flooringedit_task{"title":"Replace carpet in office","plan":"S-1","location":"suite 4B","category":"flooring","start_date":"2026-05-12","end_date":"2026-05-13","manpower":"2","cost":"5000"}
8running sprinkler heads in the boiler room on structural s2 mark it low priority due next fridayedit_task{"title":"Install sprinkler heads","plan":"structural S2","location":"boiler room","end_date":"2026-05-15","priority":"p3"}
9exhaust fan needs replacing in room 412 budget is about 6000 this is hvac work assign hectoredit_task{"title":"Replace exhaust fan","location":"room 412","category":"HVAC","assignee":"Hector","cost":"6000"}
10need to repair the roof membrane on s1 put luis on it medium priority by end of next week crew of 2 budget 10000 checklist locate the breach clean and dry the area apply primer cut patch membrane adhere patchedit_task{"title":"Repair roof membrane","plan":"S-1","assignee":"Luis","end_date":"2026-05-15","priority":"p2","manpower":"2","cost":"10000","items":["locate the breach","clean and dry the area","apply primer","cut patch membrane","adhere patch"]}
11water leaking from the pipes under the sink in bay 4 budget is about 5000 assign daveedit_task{"title":"Fix water leak under sink","location":"bay 4","assignee":"Dave","cost":"5000"}
12we're scheduling the electrical panel fix for room 201 on s1 need team of 6 starting may 4 through may 9 ballpark cost 5000edit_task{"title":"Fix electrical panel issue","plan":"S-1","location":"room 201","start_date":"2026-05-04","end_date":"2026-05-09","manpower":"6","cost":"5000"}
13we got a roof membrane leak assign it to pat two person job should cost around 3500 start wednesday end thursday checklist locate the breach clean and dry the area apply primer cut patch membrane final walkthrough with the gcedit_task{"title":"Repair roof membrane","assignee":"Pat","start_date":"2026-05-06","end_date":"2026-05-07","manpower":"2","cost":"3500","items":["locate the breach","clean and dry the area","apply primer","cut patch membrane","final walkthrough with the GC"]}
14luis is taking the attic insulation job on e1 budget around 2500 mark it closededit_task{"title":"Insulate attic space","plan":"E1","assignee":"Luis","status":"closed","cost":"2500"}
15concrete pour for the foundation in bay 12 on fp2 gc wants it done by end of month put jake on it with 6 workers budget around 6000 make it priority two category concreteedit_task{"title":"Pour concrete slab","plan":"FP-2","location":"bay 12","category":"concrete","assignee":"Jake","end_date":"2026-05-29","priority":"p2","manpower":"6","cost":"6000"}
16the toilet is cracked in the mezzanine on a301 get it replaced by next friday put sal on it with a team of 10 budget around 15000 make it priority two category plumbingedit_task{"title":"Replace broken plumbing fixture","plan":"A301","location":"mezzanine","category":"plumbing","assignee":"Sal","end_date":"2026-05-15","priority":"p2","manpower":"10","cost":"15000"}
17doing the electrical rough in in the mezzanine on p4 mark it pending inspection tony is handling it due friday checklist pull permits mark box locations per plan drill studs request rough in inspectionedit_task{"title":"Run electrical rough-in","plan":"P4","location":"mezzanine","assignee":"Tony","status":"pending inspection","end_date":"2026-05-08","items":["pull permits","mark box locations per plan","drill studs","request rough-in inspection"]}
18pouring the slab in the loading dock on fp3 mark it pending inspection dave is handling it due may 5 checklist set forms place rebar order concrete strip forms after cureedit_task{"title":"Pour concrete slab","plan":"FP-3","location":"loading dock","assignee":"Dave","status":"pending inspection","end_date":"2026-05-05","items":["set forms","place rebar","order concrete","strip forms after cure"]}
19new pull station needs install in the loading dock budget is about 1500 this is fire alarm work assign mariaedit_task{"title":"Install fire alarm pull station","location":"loading dock","category":"fire alarm","assignee":"Maria","cost":"1500"}
20drywall damage on the ceiling in the courtyard budget is about 10000 assign hectoredit_task{"title":"Patch drywall ceiling","location":"courtyard","assignee":"Hector","cost":"10000"}
21set cost to 5000 manpower to 10 and category to insulationedit_task{"category":"insulation","manpower":"10","cost":"5000"}
22update the name to fix cracked concreteedit_task{"title":"Fix cracked concrete"}
23tearing down the partition wall in unit 12 on the ground floor mark it on hold troy is handling it due wednesday checklist verify no electrical or plumbing in wall shut off circuits remove door patch flooredit_task{"title":"Demolish interior partition","plan":"ground floor","location":"unit 12","assignee":"Troy","status":"on hold","end_date":"2026-05-06","items":["verify no electrical or plumbing in wall","shut off circuits","remove door","patch floor"]}
24water getting through the roof membrane assign it to tony crew of 3 should cost around 2000 start next tuesday finish friday checklist locate the breach clean and dry the area apply primer cut patch membrane final walkthrough with the gcedit_task{"title":"Repair roof membrane","assignee":"Tony","start_date":"2026-05-12","end_date":"2026-05-15","manpower":"3","cost":"2000","items":["locate the breach","clean and dry the area","apply primer","cut patch membrane","final walkthrough with the GC"]}
25exterior caulking is failing in parking garage level 1 on s2 mark it pending inspection tony is handling it checklist remove old caulk clean and dry joint apply backer rod inspect full perimeteredit_task{"title":"Install exterior caulking","plan":"S-2","location":"parking garage level 1","assignee":"Tony","status":"pending inspection","items":["remove old caulk","clean and dry joint","apply backer rod","inspect full perimeter"]}
26breaker keeps tripping in the east wing budget is about 6000 assign vicedit_task{"title":"Fix electrical panel issue","location":"east wing","assignee":"Vic","cost":"6000"}
27new wall needs to be framed assign that to juan low priority end of next week is fineedit_task{"title":"Frame new partition wall","assignee":"Juan","end_date":"2026-05-15","priority":"p3"}
28we're scheduling the electrical panel fix for grid line b2 on mep1 need 1 worker starting may 4 through friday ballpark cost 10000edit_task{"title":"Fix electrical panel issue","plan":"MEP-1","location":"grid line B2","start_date":"2026-05-04","end_date":"2026-05-08","manpower":"1","cost":"10000"}
29gotta get the drywall ceiling patched by friday team of 1 should be enough make it asap and assign dannyedit_task{"title":"Patch drywall ceiling","assignee":"Danny","end_date":"2026-05-08","priority":"p1","manpower":"1"}
30nadia is taking the broken glass panel in the penthouse level this is glazing work urgent done by end of month manpower team of 1 budget about 7000 mark closededit_task{"title":"Replace broken window glazing","location":"penthouse level","category":"glazing","assignee":"Nadia","status":"closed","end_date":"2026-05-29","priority":"p1","manpower":"1","cost":"7000"}
31roughing in the electrical for the new space in level 3 on sheet 9 mark it needs review reza is handling it due friday checklist pull permits mark box locations per plan drill studs request rough in inspectionedit_task{"title":"Run electrical rough-in","plan":"Sheet 9","location":"level 3","assignee":"Reza","status":"needs review","end_date":"2026-05-08","items":["pull permits","mark box locations per plan","drill studs","request rough-in inspection"]}
32gotta get carpet replacement done in suite 4b down in the south corridor by friday not super urgentedit_task{"title":"Replace carpet in office","location":"suite 4B south corridor","end_date":"2026-05-08","priority":"p3"}
33we're putting in a drop ceiling on fp2 bobby is on this bump it to p1 before the owner reviewedit_task{"title":"Install ceiling grid and tiles","plan":"FP-2","assignee":"Bobby","priority":"p1"}
34installing the suspended ceiling grid in the mechanical room put mike on this one needs to be wrapped up by next friday it's low priority checklist snap layout lines install wall angle hang main tees install cross tees cut perimeter tiles take a photo for the recordedit_task{"title":"Install ceiling grid and tiles","location":"mechanical room","assignee":"Mike","end_date":"2026-05-15","priority":"p3","items":["snap layout lines","install wall angle","hang main tees","install cross tees","cut perimeter tiles","take a photo for the record"]}
35nadia and a team of 1 are blowing insulation in the attic in the west wing category is insulation budget about 6000 need it by end of month checklist check existing r value seal air leaks install baffles at eaves blow insulation to target depth document everythingedit_task{"title":"Insulate attic space","location":"west wing","category":"insulation","assignee":"Nadia","manpower":"1","cost":"6000","end_date":"2026-05-29","items":["check existing R-value","seal air leaks","install baffles at eaves","blow insulation to target depth","document everything"]}
36this one is the attic insulation job on id101 mark it medium priority brenda handles it by next tuesday budget around 6000 location is level 2 category insulationedit_task{"title":"Insulate attic space","plan":"ID-101","location":"level 2","category":"insulation","assignee":"Brenda","end_date":"2026-05-12","priority":"p2","cost":"6000"}
37we're dealing with a leak under the sink on a101 carlos is on this make it low by next tuesdayedit_task{"title":"Fix water leak under sink","plan":"A101","assignee":"Carlos","end_date":"2026-05-12","priority":"p3"}
38we're painting the exterior facade on sheet 4 in basement level 2 starting next tuesday wrapping the same day crew of 2 cost 3500 category painting dave is lead checklist pressure wash surface scrape loose paint apply primer caulk gaps and cracks roll first coat roll second coatedit_task{"title":"Paint exterior facade","plan":"Sheet 4","location":"basement level 2","category":"painting","assignee":"Dave","start_date":"2026-05-12","end_date":"2026-05-12","manpower":"2","cost":"3500","items":["pressure wash surface","scrape loose paint","apply primer","caulk gaps and cracks","roll first coat","roll second coat"]}
39install sprinkler heads on s2 put troy on it priority two by end of month 4 workers budget about 7000 checklist confirm pipe layout with plan drill ceiling openings install drops attach heads pressure testedit_task{"title":"Install sprinkler heads","plan":"S-2","assignee":"Troy","end_date":"2026-05-29","priority":"p2","manpower":"4","cost":"7000","items":["confirm pipe layout with plan","drill ceiling openings","install drops","attach heads","pressure test"]}
40change category to plumbing and mark it closededit_task{"category":"plumbing","status":"closed"}
41put kim and a team of 3 on the new wall framing this is framing work starts may 3 done by thursdayedit_task{"title":"Frame new partition wall","category":"framing","assignee":"Kim","start_date":"2026-05-03","end_date":"2026-05-07","manpower":"3"}
42it's in the cafeteria and status is verifiededit_task{"location":"cafeteria","status":"verified"}
43we need to swap out the old hvac in the basement put steve on it needs to be wrapped up by next tuesday it's urgent checklist shut down power to unit remove old unit install new unit check refrigerant lines test thermostat take a photo for the recordedit_task{"title":"Replace broken HVAC unit","location":"basement","assignee":"Steve","end_date":"2026-05-12","priority":"p1","items":["shut down power to unit","remove old unit","install new unit","check refrigerant lines","test thermostat","take a photo for the record"]}
44materials came out to about 2000edit_task{"cost":"2000"}
45we're scheduling a window glazing replacement in the basement on the roof level plan need a team of 8 through may 11 ballpark cost 2000edit_task{"title":"Replace broken window glazing","plan":"roof level","location":"basement","end_date":"2026-05-11","manpower":"8","cost":"2000"}
46zack is taking the concrete pour in room 201 this is concrete work low priority done by wednesday manpower crew of 5 budget 12000 mark in progressedit_task{"title":"Pour concrete slab","location":"room 201","category":"concrete","assignee":"Zack","status":"in progress","end_date":"2026-05-06","priority":"p3","manpower":"5","cost":"12000"}
47vic is taking the data and av cabling in mechanical room level 3 this is low voltage work medium priority done by next friday manpower 2 guys budget 15000 mark on holdedit_task{"title":"Install low voltage cabling","location":"mechanical room level 3","category":"low voltage","assignee":"Vic","status":"on hold","end_date":"2026-05-15","priority":"p2","manpower":"2","cost":"15000"}
48move this to s2 and set location to elevator shaft bedit_task{"plan":"S-2","location":"elevator shaft B"}
49maria and a team of 1 are on the concrete pour in stairwell c category is concrete budget 20000 need it by may 11 checklist set forms place rebar order concrete pour slab document everythingedit_task{"title":"Pour concrete slab","location":"stairwell C","category":"concrete","assignee":"Maria","end_date":"2026-05-11","manpower":"1","cost":"20000","items":["set forms","place rebar","order concrete","pour slab","document everything"]}
50change the category to glazing put it on sheet 9 and set status to verifiededit_task{"plan":"Sheet 9","category":"glazing","status":"verified"}
51put this in bobby's queueedit_task{"assignee":"Bobby"}
52this goes on civil sheet 3edit_task{"plan":"civil sheet 3"}
53we're knocking out the old partition on a4 juan is on this make it critical by may 6edit_task{"title":"Demolish interior partition","plan":"A-4","assignee":"Juan","end_date":"2026-05-06","priority":"p1"}
54need drywall damage on the ceiling in exterior facade east put eddie on it should be done by wednesday cost around 7000edit_task{"title":"Patch drywall ceiling","location":"exterior facade east","assignee":"Eddie","end_date":"2026-05-06","cost":"7000"}
55kick off may 6edit_task{"start_date":"2026-05-06"}
56running low voltage cable in the break room floor 2 on sheet 9 put hector on it with a team of 10 budget 2500 make it urgent category low voltageedit_task{"title":"Install low voltage cabling","plan":"Sheet 9","location":"break room floor 2","category":"low voltage","assignee":"Hector","priority":"p1","manpower":"10","cost":"2500"}
57install sprinkler heads on structural s2 put felix on it urgent by end of month 3 workers budget about 7000 checklist confirm pipe layout with plan drill ceiling openings install drops attach heads pressure testedit_task{"title":"Install sprinkler heads","plan":"structural S2","assignee":"Felix","end_date":"2026-05-29","priority":"p1","manpower":"3","cost":"7000","items":["confirm pipe layout with plan","drill ceiling openings","install drops","attach heads","pressure test"]}
58omar is taking the busted window pane replacement over on p2 budget about 20000 mark it openedit_task{"title":"Replace broken window glazing","plan":"P-2","assignee":"Omar","status":"open","cost":"20000"}
59something's wrong with the electrical panel in the penthouse level put carlos on it needs to be wrapped up by may 11 priority two checklist identify tripped breaker check load on circuit inspect wiring connections replace breaker if faulty test under load take a photo for the recordedit_task{"title":"Fix electrical panel issue","location":"penthouse level","assignee":"Carlos","end_date":"2026-05-11","priority":"p2","items":["identify tripped breaker","check load on circuit","inspect wiring connections","replace breaker if faulty","test under load","take a photo for the record"]}
60painting the exterior facade on sheet 4 starts tomorrow wraps up by thursday team of 6 cost is 5000 category paintingedit_task{"title":"Paint exterior facade","plan":"Sheet 4","category":"painting","start_date":"2026-05-06","end_date":"2026-05-07","manpower":"6","cost":"5000"}
61running rough in wiring in level 3 on the mezzanine plan make it medium priority due by may 7edit_task{"title":"Run electrical rough-in","plan":"mezzanine","location":"level 3","end_date":"2026-05-07","priority":"p2"}
62we're roughing in the electrical for the new space on a101 lena is on this make it low priority by may 17edit_task{"title":"Run electrical rough-in","plan":"A101","assignee":"Lena","end_date":"2026-05-17","priority":"p3"}
63assign carlos priority p3 cost 1200 and due by thursdayedit_task{"assignee":"Carlos","end_date":"2026-05-07","priority":"p3","cost":"1200"}
64exterior caulking is failing in the west wing put bobby on it needs to be wrapped up by may 6 it's urgent checklist remove old caulk clean and dry joint apply backer rod apply caulk bead tool joint smooth take a photo for the recordedit_task{"title":"Install exterior caulking","location":"west wing","assignee":"Bobby","end_date":"2026-05-06","priority":"p1","items":["remove old caulk","clean and dry joint","apply backer rod","apply caulk bead","tool joint smooth","take a photo for the record"]}
65bobby and his team of 2 are roughing in the electrical for the new space in level 2 category is electrical budget 7000 need it by next tuesday checklist pull permits mark box locations per plan drill studs pull wire document everythingedit_task{"title":"Run electrical rough-in","location":"level 2","category":"electrical","assignee":"Bobby","end_date":"2026-05-12","manpower":"2","cost":"7000","items":["pull permits","mark box locations per plan","drill studs","pull wire","document everything"]}
66concrete slab has cracks in stairwell a put carlos on this needs to be wrapped up by may 15 normal priority checklist rout crack to proper width blow out dust apply bond breaker if needed fill with epoxy inject grind flush after cure take a photo for the recordedit_task{"title":"Repair cracked concrete","location":"stairwell A","assignee":"Carlos","end_date":"2026-05-15","priority":"p2","items":["rout crack to proper width","blow out dust","apply bond breaker if needed","fill with epoxy inject","grind flush after cure","take a photo for the record"]}
67bump it to medium and push the deadline to may 9edit_task{"end_date":"2026-05-09","priority":"p2"}
68need the electrical rough in for the new space assign it to nadia crew of 3 should cost around 2500 start may 4 end thursday checklist pull permits mark box locations per plan drill studs pull wire final walkthrough with the gcedit_task{"title":"Run electrical rough-in","assignee":"Nadia","start_date":"2026-05-04","end_date":"2026-05-07","manpower":"3","cost":"2500","items":["pull permits","mark box locations per plan","drill studs","pull wire","final walkthrough with the GC"]}
69sarah and 2 workers are on tearing down the partition wall in room 201 category is demo budget around 4000 need it by may 16 checklist verify no electrical or plumbing in wall shut off circuits remove door strip drywall document everythingedit_task{"title":"Demolish interior partition","location":"room 201","category":"demo","assignee":"Sarah","end_date":"2026-05-16","manpower":"2","cost":"4000","items":["verify no electrical or plumbing in wall","shut off circuits","remove door","strip drywall","document everything"]}
70sarah is taking the electrical rough in over at mep1 budget 4000 mark it completeedit_task{"title":"Run electrical rough-in","plan":"MEP-1","assignee":"Sarah","status":"complete","cost":"4000"}
71install sprinkler heads on a301 put bobby on it p1 by end of next week team of 6 budget about 1500 checklist confirm pipe layout with plan drill ceiling openings install drops attach heads pressure testedit_task{"title":"Install sprinkler heads","plan":"A301","assignee":"Bobby","end_date":"2026-05-16","priority":"p1","manpower":"6","cost":"1500","items":["confirm pipe layout with plan","drill ceiling openings","install drops","attach heads","pressure test"]}
72waterproofing membrane on the deck in parking garage level 1 on a202 gc wants it done by may 9 put vic on it with a team of 2 budget 6000 make it medium priority category waterproofingedit_task{"title":"Apply waterproofing membrane","plan":"A202","location":"parking garage level 1","category":"waterproofing","assignee":"Vic","end_date":"2026-05-09","priority":"p2","manpower":"2","cost":"6000"}
73resource it with team of 4edit_task{"manpower":"4"}
74replacing the broken glass panel in stairwell b on a4 mark it complete brenda is handling it checklist measure opening order replacement glass remove broken pane seal exterioredit_task{"title":"Replace broken window glazing","plan":"A-4","location":"stairwell B","assignee":"Brenda","status":"complete","items":["measure opening","order replacement glass","remove broken pane","seal exterior"]}
75replacing the broken glass panel on id101 starts wednesday morning wraps up next friday crew of 6 cost is 800 category glazingedit_task{"title":"Replace broken window glazing","plan":"ID-101","category":"glazing","start_date":"2026-05-06","end_date":"2026-05-15","manpower":"6","cost":"800"}
76we're applying waterproofing membrane on exterior facade east put dave on it medium priority checklist clean substrate apply primer coat let cure apply first membrane coat let cure take a photo for the recordedit_task{"title":"Apply waterproofing membrane","location":"exterior facade east","assignee":"Dave","priority":"p2","items":["clean substrate","apply primer coat","let cure","apply first membrane coat","let cure","take a photo for the record"]}
77breaker keeps tripping in unit 12 put reza on it needs to be wrapped up by next friday make it p2 checklist identify tripped breaker check load on circuit inspect wiring connections replace breaker if faulty test under load take a photo for the recordedit_task{"title":"Fix electrical panel issue","location":"unit 12","assignee":"Reza","end_date":"2026-05-15","priority":"p2","items":["identify tripped breaker","check load on circuit","inspect wiring connections","replace breaker if faulty","test under load","take a photo for the record"]}
78we're scheduling the recessed lighting install for break room floor 2 on e2 need 1 guy starting next tuesday through next friday ballpark cost 20000edit_task{"title":"Install recessed lighting","plan":"E-2","location":"break room floor 2","start_date":"2026-05-12","end_date":"2026-05-15","manpower":"1","cost":"20000"}
79tag inspectionedit_task{"tags":["inspection"]}
80installing data and av cabling on p2 starts may 4 wraps up by next tuesday team of 9 cost is 3000 category low voltageedit_task{"title":"Install low voltage cabling","plan":"P-2","category":"low voltage","start_date":"2026-05-04","end_date":"2026-05-12","manpower":"9","cost":"3000"}
81assign sal priority p2 cost around 2000 and due by fridayedit_task{"assignee":"Sal","end_date":"2026-05-08","priority":"p2","cost":"2000"}
82painting the exterior facade on the ground floor on e1 gc wants it done by may 8 put sal on it with a team of 8 budget 10000 make it low priority category paintingedit_task{"title":"Paint exterior facade","plan":"E1","location":"ground floor","category":"painting","assignee":"Sal","end_date":"2026-05-08","priority":"p3","manpower":"8","cost":"10000"}
83window glazing is cracked assign that to nadia low priority end of next week is fineedit_task{"title":"Replace broken window glazing","assignee":"Nadia","end_date":"2026-05-15","priority":"p3"}
84carlos and 1 worker are on patching the ceiling drywall in parking garage level 1 category drywall budget about 7000 need it by thursday checklist cut out damaged section install backing hang new drywall tape and mud document everythingedit_task{"title":"Patch drywall ceiling","location":"parking garage level 1","category":"drywall","assignee":"Carlos","end_date":"2026-05-07","manpower":"1","cost":"7000","items":["cut out damaged section","install backing","hang new drywall","tape and mud","document everything"]}
85new pull station needs install on s2 mark it low priority steve handles it by may 5 budget around 6000 location is west wing category fire alarmedit_task{"title":"Install fire alarm pull station","plan":"S-2","location":"west wing","category":"fire alarm","assignee":"Steve","end_date":"2026-05-05","priority":"p3","cost":"6000"}
86we're scheduling the exterior caulking install for room 412 on a4 need team of 1 starting this monday through wednesday ballpark cost 4000edit_task{"title":"Install exterior caulking","plan":"A-4","location":"room 412","start_date":"2026-05-04","end_date":"2026-05-06","manpower":"1","cost":"4000"}
87lena is taking the tile floor install on roof level budget 7000 mark it in progressedit_task{"title":"Install tile flooring","plan":"roof level","assignee":"Lena","status":"in progress","cost":"7000"}
88fire alarm pull station is broken in stairwell a put zack on it medium priority checklist shut off fire alarm circuit remove old device run new conduit if needed mount backbox wire new device take a photo for the recordedit_task{"title":"Install fire alarm pull station","location":"stairwell A","assignee":"Zack","priority":"p2","items":["shut off fire alarm circuit","remove old device","run new conduit if needed","mount backbox","wire new device","take a photo for the record"]}
89ray and his 10 guys are on new sprinkler heads in room 412 category sprinkler budget 7000 checklist confirm pipe layout with plan drill ceiling openings install drops attach heads document everythingedit_task{"title":"Install sprinkler heads","location":"room 412","category":"sprinkler","assignee":"Ray","manpower":"10","cost":"7000","items":["confirm pipe layout with plan","drill ceiling openings","install drops","attach heads","document everything"]}
90replace the broken hvac unit on e1 put brenda on it make it p1 by end of month team of 1 budget about 8000 checklist shut down power to unit remove old unit install new unit check refrigerant lines test thermostatedit_task{"title":"Replace broken HVAC unit","plan":"E1","assignee":"Brenda","end_date":"2026-05-29","priority":"p1","manpower":"1","cost":"8000","items":["shut down power to unit","remove old unit","install new unit","check refrigerant lines","test thermostat"]}
91waterproofing the shower pan in the west wing put zack on it needs to be wrapped up by next friday priority two checklist clean substrate apply primer coat let cure apply first membrane coat let cure take a photo for the recordedit_task{"title":"Apply waterproofing membrane","location":"west wing","assignee":"Zack","end_date":"2026-05-15","priority":"p2","items":["clean substrate","apply primer coat","let cure","apply first membrane coat","let cure","take a photo for the record"]}
92we're replacing the hvac unit on a4 in room 201 starting this monday wrapping may 5 8 guys on it cost 15000 category hvac vic is lead checklist shut down power to unit remove old unit install new unit check refrigerant lines test thermostat verify airflowedit_task{"title":"Replace broken HVAC unit","plan":"A-4","location":"room 201","category":"HVAC","assignee":"Vic","start_date":"2026-05-04","end_date":"2026-05-05","manpower":"8","cost":"15000","items":["shut down power to unit","remove old unit","install new unit","check refrigerant lines","test thermostat","verify airflow"]}
93need the broken faucet replaced assign it to lena crew of 3 should cost around 800 start may 6 end friday checklist shut off water remove old fixture clean mounting surface install new fixture final walkthrough with the gcedit_task{"title":"Replace broken plumbing fixture","assignee":"Lena","start_date":"2026-05-06","end_date":"2026-05-08","manpower":"3","cost":"800","items":["shut off water","remove old fixture","clean mounting surface","install new fixture","final walkthrough with the GC"]}
94juan is taking the attic insulation job in level 3 this is insulation work low priority manpower team of 8 budget 3000 mark verifiededit_task{"title":"Insulate attic space","location":"level 3","category":"insulation","assignee":"Juan","status":"verified","priority":"p3","manpower":"8","cost":"3000"}
95ray and his 4 guys are on the waterproofing membrane on the deck in the east wing category waterproofing budget around 800 need it by thursday checklist clean substrate apply primer coat let cure apply first membrane coat document everythingedit_task{"title":"Apply waterproofing membrane","location":"east wing","category":"waterproofing","assignee":"Ray","end_date":"2026-05-07","manpower":"4","cost":"800","items":["clean substrate","apply primer coat","let cure","apply first membrane coat","document everything"]}
96omar is taking a duct leak in the plenum over at civil sheet 3 budget around 8000 mark it openedit_task{"title":"Fix HVAC ductwork leak","plan":"civil sheet 3","assignee":"Omar","status":"open","cost":"8000"}
97replace the exhaust fan on a101 put felix on it medium priority by end of next week team of 1 budget about 4000 checklist shut off circuit at panel remove old fan install new housing wire new fan test operationedit_task{"title":"Replace exhaust fan","plan":"A101","assignee":"Felix","end_date":"2026-05-15","priority":"p2","manpower":"1","cost":"4000","items":["shut off circuit at panel","remove old fan","install new housing","wire new fan","test operation"]}
98tearing down the partition wall in level 4 on the ground floor mark it tracked bobby is handling it due by may 11 checklist verify no electrical or plumbing in wall shut off circuits remove door patch flooredit_task{"title":"Demolish interior partition","plan":"ground floor","location":"level 4","assignee":"Bobby","status":"tracked","end_date":"2026-05-11","items":["verify no electrical or plumbing in wall","shut off circuits","remove door","patch floor"]}
99move to p2 location basement level 2 and mark verifiededit_task{"plan":"P-2","location":"basement level 2","status":"verified"}
100we're replacing the hvac unit on a201 in suite 3b starting may 3 wrapping may 9 9 guys on it cost 3000 category hvac dave is lead checklist shut down power to unit remove old unit install new unit check refrigerant lines test thermostat verify airflowedit_task{"title":"Replace broken HVAC unit","plan":"A201","location":"suite 3B","category":"HVAC","assignee":"Dave","start_date":"2026-05-03","end_date":"2026-05-09","manpower":"9","cost":"3000","items":["shut down power to unit","remove old unit","install new unit","check refrigerant lines","test thermostat","verify airflow"]}
101ceiling drywall needs patching in level 2 put kim on it make it p2 checklist cut out damaged section install backing hang new drywall tape and mud sand smooth take a photo for the recordedit_task{"title":"Patch drywall ceiling","location":"level 2","assignee":"Kim","priority":"p2","items":["cut out damaged section","install backing","hang new drywall","tape and mud","sand smooth","take a photo for the record"]}
102broken exhaust fan in the bathroom in bay 7 put hector on it needs to be wrapped up by thursday low priority checklist shut off circuit at panel remove old fan install new housing wire new fan test operation take a photo for the recordedit_task{"title":"Replace exhaust fan","location":"bay 7","assignee":"Hector","end_date":"2026-05-07","priority":"p3","items":["shut off circuit at panel","remove old fan","install new housing","wire new fan","test operation","take a photo for the record"]}
1035 guys on this oneedit_task{"manpower":"5"}
104water leaking from the pipes under the sink at grid line b2 on the roof level plan gc wants it done by wednesday put luis on it with a team of 7 budget around 2500 make it p1 category plumbingedit_task{"title":"Fix water leak under sink","plan":"roof level","location":"grid line B2","category":"plumbing","assignee":"Luis","end_date":"2026-05-06","priority":"p1","manpower":"7","cost":"2500"}
105get going next tuesdayedit_task{"start_date":"2026-05-12"}
106materials came out to 15000edit_task{"cost":"15000"}
107gotta get breaker keeps tripping in bay 7 by friday not super urgentedit_task{"title":"Fix electrical panel issue","location":"bay 7","end_date":"2026-05-08","priority":"p3"}
108need attic insulation in the pool deck put felix on it should be done by friday cost is probably around 4000edit_task{"title":"Insulate attic space","location":"pool deck","assignee":"Felix","end_date":"2026-05-08","cost":"4000"}
109reza and his 3 guys are on running sprinkler heads in suite 3b category sprinkler budget 2000 need it by next tuesday checklist confirm pipe layout with plan drill ceiling openings install drops attach heads document everythingedit_task{"title":"Install sprinkler heads","location":"suite 3B","category":"sprinkler","assignee":"Reza","end_date":"2026-05-12","manpower":"3","cost":"2000","items":["confirm pipe layout with plan","drill ceiling openings","install drops","attach heads","document everything"]}
110carpet replacement in suite 4b in the cafeteria put maria on it needs to be wrapped up by may 11 medium priority checklist move furniture remove old carpet pull tack strips prep subfloor install new tack strips take a photo for the recordedit_task{"title":"Replace carpet in office","location":"suite 4B cafeteria","assignee":"Maria","end_date":"2026-05-11","priority":"p2","items":["move furniture","remove old carpet","pull tack strips","prep subfloor","install new tack strips","take a photo for the record"]}
111replacing the broken faucet in stairwell a put pat on it needs to be wrapped up by end of month low priority checklist shut off water remove old fixture clean mounting surface install new fixture reconnect supply lines take a photo for the recordedit_task{"title":"Replace broken plumbing fixture","location":"stairwell A","assignee":"Pat","end_date":"2026-05-29","priority":"p3","items":["shut off water","remove old fixture","clean mounting surface","install new fixture","reconnect supply lines","take a photo for the record"]}
112something's wrong with the electrical panel in level 3 on the mezzanine plan mark it on hold bobby is handling it due by may 7 checklist identify tripped breaker check load on circuit inspect wiring connections document findingsedit_task{"title":"Fix electrical panel issue","plan":"mezzanine","location":"level 3","assignee":"Bobby","status":"on hold","end_date":"2026-05-07","items":["identify tripped breaker","check load on circuit","inspect wiring connections","document findings"]}
113set cost to 2500 manpower to 3 workers and category to fire alarmedit_task{"category":"fire alarm","manpower":"3","cost":"2500"}
114need a new partition wall framed assign it to bobby two person job should cost around 2000 start tomorrow finish end of month checklist snap chalk lines lay bottom plate stand studs 16 oc install top plate final walkthrough with the gcedit_task{"title":"Frame new partition wall","assignee":"Bobby","start_date":"2026-05-06","end_date":"2026-05-29","manpower":"2","cost":"2000","items":["snap chalk lines","lay bottom plate","stand studs 16 OC","install top plate","final walkthrough with the GC"]}
115replace carpet in the office on fp3 put sarah on it normal priority by end of month team of 4 budget about 10000 checklist move furniture remove old carpet pull tack strips prep subfloor install new tack stripsedit_task{"title":"Replace carpet in office","plan":"FP-3","assignee":"Sarah","end_date":"2026-05-29","priority":"p2","manpower":"4","cost":"10000","items":["move furniture","remove old carpet","pull tack strips","prep subfloor","install new tack strips"]}
116breaker keeps tripping in the loading dock on m2 mark it verified gus is handling it due by may 9 checklist identify tripped breaker check load on circuit inspect wiring connections document findingsedit_task{"title":"Fix electrical panel issue","plan":"M2","location":"loading dock","assignee":"Gus","status":"verified","end_date":"2026-05-09","items":["identify tripped breaker","check load on circuit","inspect wiring connections","document findings"]}
117fix the water leak under the sink on a3 put steve on it bump it to p1 by end of next week one guy budget about 1200 checklist shut off water supply remove p trap inspect drain line replace gaskets reinstall p trapedit_task{"title":"Fix water leak under sink","plan":"A-3","assignee":"Steve","end_date":"2026-05-15","priority":"p1","manpower":"1","cost":"1200","items":["shut off water supply","remove p-trap","inspect drain line","replace gaskets","reinstall p-trap"]}
118replace the exhaust fan assign it to brenda crew of 3 should cost around 2000 start wednesday end friday checklist shut off circuit at panel remove old fan install new housing wire new fan final walkthrough with the gcedit_task{"title":"Replace exhaust fan","assignee":"Brenda","start_date":"2026-05-06","end_date":"2026-05-08","manpower":"3","cost":"2000","items":["shut off circuit at panel","remove old fan","install new housing","wire new fan","final walkthrough with the GC"]}
119install recessed lighting on s1 put omar on it low priority by end of month 6 workers budget about 10000 checklist run romex to junction box mount the housing cans connect wiring install trim rings test all fixturesedit_task{"title":"Install recessed lighting","plan":"S-1","assignee":"Omar","end_date":"2026-05-29","priority":"p3","manpower":"6","cost":"10000","items":["run romex to junction box","mount the housing cans","connect wiring","install trim rings","test all fixtures"]}
120start tomorrow finish friday manpower 4 cost 1500edit_task{"start_date":"2026-05-06","end_date":"2026-05-08","manpower":"4","cost":"1500"}
121breaker keeps tripping in the west wing on e2 make it low priority due by may 15edit_task{"title":"Fix electrical panel issue","plan":"E-2","location":"west wing","end_date":"2026-05-15","priority":"p3"}
122installing the fire suppression heads in grid line b2 put eddie on it medium priority checklist confirm pipe layout with plan drill ceiling openings install drops attach heads pressure test take a photo for the recordedit_task{"title":"Install sprinkler heads","location":"grid line B2","assignee":"Eddie","priority":"p2","items":["confirm pipe layout with plan","drill ceiling openings","install drops","attach heads","pressure test","take a photo for the record"]}
123knocking out the old partition in unit 7 on c1 make it priority two due by may 6edit_task{"title":"Demolish interior partition","plan":"C-1","location":"unit 7","end_date":"2026-05-06","priority":"p2"}
124brenda is leading the broken faucet replacement on the roof deck start wednesday finish next friday cost about 1500 need 6 workers mark it completeedit_task{"title":"Replace broken plumbing fixture","location":"roof deck","assignee":"Brenda","status":"complete","start_date":"2026-05-06","end_date":"2026-05-15","manpower":"6","cost":"1500"}
125set priority low assign sarah mark it in progress and due by next tuesdayedit_task{"assignee":"Sarah","status":"in progress","end_date":"2026-05-12","priority":"p3"}
126flag it as p1edit_task{"priority":"p1"}
127leak under the sink in suite 101 put reza on this one low priority checklist shut off water supply remove p trap inspect drain line replace gaskets reinstall p trap take a photo for the recordedit_task{"title":"Fix water leak under sink","location":"suite 101","assignee":"Reza","priority":"p3","items":["shut off water supply","remove p-trap","inspect drain line","replace gaskets","reinstall p-trap","take a photo for the record"]}
128we're scheduling the low voltage cabling install for the server room on civil sheet 3 need 1 guy starting this monday through friday ballpark cost 2000edit_task{"title":"Install low voltage cabling","plan":"civil sheet 3","location":"server room","start_date":"2026-05-04","end_date":"2026-05-08","manpower":"1","cost":"2000"}
129it's in the courtyard and status is trackededit_task{"location":"courtyard","status":"tracked"}
130need some recessed lighting in exterior facade east put jake on it should be done by may 7 cost about 2500edit_task{"title":"Install recessed lighting","location":"exterior facade east","assignee":"Jake","end_date":"2026-05-07","cost":"2500"}
131assign nadia cost about 2000 and bump it to p1edit_task{"assignee":"Nadia","priority":"p1","cost":"2000"}
132slow drip under the kitchen sink in the lobby on e4 mark it on hold mike is handling it checklist shut off water supply remove p trap inspect drain line take photoedit_task{"title":"Fix water leak under sink","plan":"E4","location":"lobby","assignee":"Mike","status":"on hold","items":["shut off water supply","remove p-trap","inspect drain line","take photo"]}
133set plan to sheet 7edit_task{"plan":"Sheet 7"}
134framing out a new partition on the ground floor put danny on it bump it to p1 get it done by fridayedit_task{"title":"Frame new partition wall","location":"ground floor","assignee":"Danny","end_date":"2026-05-08","priority":"p1"}
135gotta get a partition wall put up by may 19 one worker should be enough make it medium priority and assign daveedit_task{"title":"Frame new partition wall","assignee":"Dave","end_date":"2026-05-19","priority":"p2","manpower":"1"}
136we're repairing cracked concrete on p4 in parking garage level 1 starting this monday wrapping by thursday team of 9 cost 20000 category concrete omar is lead checklist rout crack to proper width blow out dust apply bond breaker if needed fill with epoxy inject grind flush after cure apply surface sealeredit_task{"title":"Repair cracked concrete","plan":"P4","location":"parking garage level 1","category":"concrete","assignee":"Omar","start_date":"2026-05-04","end_date":"2026-05-07","manpower":"9","cost":"20000","items":["rout crack to proper width","blow out dust","apply bond breaker if needed","fill with epoxy inject","grind flush after cure","apply surface sealer"]}
137sal is taking recaulking the facade joints in unit 7 this is waterproofing work priority two manpower 2 guys budget 10000 mark pending inspectionedit_task{"title":"Install exterior caulking","location":"unit 7","category":"waterproofing","assignee":"Sal","status":"pending inspection","priority":"p2","manpower":"2","cost":"10000"}
138reza is leading the ceiling drywall patch in bay 4 start next tuesday finish thursday cost 12000 need a team of 10 mark it in progressedit_task{"title":"Patch drywall ceiling","location":"bay 4","assignee":"Reza","status":"in progress","start_date":"2026-05-12","end_date":"2026-05-14","manpower":"10","cost":"12000"}
139move it to room 412edit_task{"location":"room 412"}
140we're replacing the carpet in mechanical room level 3 on a4 starting wednesday wrapping friday team of 6 cost about 3500 category flooring felix is lead checklist move furniture remove old carpet pull tack strips prep subfloor install new tack strips lay padedit_task{"title":"Replace carpet in office","plan":"A-4","location":"mechanical room level 3","category":"flooring","assignee":"Felix","start_date":"2026-05-06","end_date":"2026-05-08","manpower":"6","cost":"3500","items":["move furniture","remove old carpet","pull tack strips","prep subfloor","install new tack strips","lay pad"]}
141waterproofing membrane on the deck in the data center floor on e4 mark it priority two due by next tuesdayedit_task{"title":"Apply waterproofing membrane","plan":"E4","location":"data center floor","end_date":"2026-05-12","priority":"p2"}
142need painting the exterior facade in elevator shaft b put tony on it should be done by thursday cost about 3500edit_task{"title":"Paint exterior facade","location":"elevator shaft B","assignee":"Tony","end_date":"2026-05-07","cost":"3500"}
143running recessed lights in stairwell c on id101 gc wants it done by next tuesday put felix and a crew of 5 on it budget about 3000 bump it to p1 category electricaledit_task{"title":"Install recessed lighting","plan":"ID-101","location":"stairwell C","category":"electrical","assignee":"Felix","end_date":"2026-05-12","priority":"p1","manpower":"5","cost":"3000"}
144bump it to priority two and push the deadline to wednesdayedit_task{"end_date":"2026-05-06","priority":"p2"}
145blowing insulation in the attic in the data center floor put steve on it make it top priority get it done by thursdayedit_task{"title":"Insulate attic space","location":"data center floor","assignee":"Steve","end_date":"2026-05-07","priority":"p1"}
146set priority medium location level 2 cost about 1500edit_task{"location":"level 2","priority":"p2","cost":"1500"}
147nadia is leading the broken exhaust fan in the bathroom in the server room start this monday finish before the inspection cost around 8000 need 6 guys mark it closededit_task{"title":"Replace exhaust fan","location":"server room","assignee":"Nadia","status":"closed","start_date":"2026-05-04","manpower":"6","cost":"8000"}
148reza is taking the data and av cabling over on sheet 9 budget 2000 mark it in progressedit_task{"title":"Install low voltage cabling","plan":"Sheet 9","assignee":"Reza","status":"in progress","cost":"2000"}
149drawing a301 location room 305 category roofing and assign lenaedit_task{"plan":"A301","location":"room 305","category":"roofing","assignee":"Lena"}
150we got cracks in the floor slab assign that to lena low priority end of next week is fineedit_task{"title":"Repair cracked concrete","assignee":"Lena","end_date":"2026-05-15","priority":"p3"}
151installing the suspended ceiling grid in the mechanical room on a301 mark it in progress tony is handling it due by end of month checklist snap layout lines install wall angle hang main tees final inspectionedit_task{"title":"Install ceiling grid and tiles","plan":"A301","location":"mechanical room","assignee":"Tony","status":"in progress","end_date":"2026-05-29","items":["snap layout lines","install wall angle","hang main tees","final inspection"]}
152danny is taking running sprinkler heads over at s1 budget around 1200 mark it closededit_task{"title":"Install sprinkler heads","plan":"S-1","assignee":"Danny","status":"closed","cost":"1200"}
153fire alarm pull station is broken assign it to pat crew of 3 should cost around 5000 start wednesday checklist shut off fire alarm circuit remove old device run new conduit if needed mount backbox final walkthrough with the gcedit_task{"title":"Install fire alarm pull station","assignee":"Pat","start_date":"2026-05-06","manpower":"3","cost":"5000","items":["shut off fire alarm circuit","remove old device","run new conduit if needed","mount backbox","final walkthrough with the GC"]}
154we're repairing cracked concrete on p3 in unit 7 starting this monday wrapping end of month 7 workers on it cost about 4000 category concrete troy is lead checklist rout crack to proper width blow out dust apply bond breaker if needed fill with epoxy inject grind flush after cure apply surface sealeredit_task{"title":"Repair cracked concrete","plan":"P-3","location":"unit 7","category":"concrete","assignee":"Troy","start_date":"2026-05-04","end_date":"2026-05-29","manpower":"7","cost":"4000","items":["rout crack to proper width","blow out dust","apply bond breaker if needed","fill with epoxy inject","grind flush after cure","apply surface sealer"]}
155assign maria priority two cost 6000edit_task{"assignee":"Maria","priority":"p2","cost":"6000"}
156we got a hole in the drywall on the ceiling assign that to danny low priority end of next week is fineedit_task{"title":"Patch drywall ceiling","assignee":"Danny","end_date":"2026-05-15","priority":"p3"}
157we're scheduling the exterior caulking install for the east wing on s1 need crew of 6 starting this monday through may 9 ballpark cost 8000edit_task{"title":"Install exterior caulking","plan":"S-1","location":"east wing","start_date":"2026-05-04","end_date":"2026-05-09","manpower":"6","cost":"8000"}
158nadia is leading the broken faucet replacement in stairwell b start next tuesday finish end of month cost is 6000 and we need a crew of 3 mark it completeedit_task{"title":"Replace broken plumbing fixture","location":"stairwell B","assignee":"Nadia","status":"complete","start_date":"2026-05-12","end_date":"2026-05-29","manpower":"3","cost":"6000"}
159need team of 5 for thisedit_task{"manpower":"5"}
160pouring the slab in the south corridor on s1 put mike on it with a team of 7 budget about 15000 make it low priority category concreteedit_task{"title":"Pour concrete slab","plan":"S-1","location":"south corridor","category":"concrete","assignee":"Mike","priority":"p3","manpower":"7","cost":"15000"}
161attach to sheet 4edit_task{"plan":"Sheet 4"}
162new pull station needs install assign that to reza low priority end of next week is fineedit_task{"title":"Install fire alarm pull station","assignee":"Reza","end_date":"2026-05-15","priority":"p3"}
163it's in room 412 and status is pending inspectionedit_task{"location":"room 412","status":"pending inspection"}
164assign this to daveedit_task{"assignee":"Dave"}
165need running rough in wiring in suite 101 put tony on it should be done by may 16 cost about 2000edit_task{"title":"Run electrical rough-in","location":"suite 101","assignee":"Tony","end_date":"2026-05-16","cost":"2000"}
166patch the roof membrane in the penthouse level on fp2 due next friday put brenda and 3 guys on it budget 1500 make it medium category roofingedit_task{"title":"Repair roof membrane","plan":"FP-2","location":"penthouse level","category":"roofing","assignee":"Brenda","end_date":"2026-05-15","priority":"p2","manpower":"3","cost":"1500"}
167bump it to p1edit_task{"priority":"p1"}
168start tomorrow finish by thursday put troy on itedit_task{"assignee":"Troy","start_date":"2026-05-06","end_date":"2026-05-07"}
169ductwork is leaking on m3 mark it high priority zack handles it by next tuesday budget around 15000 location is east wing category hvacedit_task{"title":"Fix HVAC ductwork leak","plan":"M-3","location":"east wing","category":"HVAC","assignee":"Zack","end_date":"2026-05-12","priority":"p1","cost":"15000"}
170painting the exterior facade in stairwell c put luis on it needs to be wrapped up by next tuesday low priority checklist pressure wash surface scrape loose paint apply primer caulk gaps and cracks roll first coat take a photo for the recordedit_task{"title":"Paint exterior facade","location":"stairwell C","assignee":"Luis","end_date":"2026-05-12","priority":"p3","items":["pressure wash surface","scrape loose paint","apply primer","caulk gaps and cracks","roll first coat","take a photo for the record"]}
171fixing the cracks in the floor slab in bay 7 put danny on it needs to be wrapped up by thursday top priority checklist rout crack to proper width blow out dust apply bond breaker if needed fill with epoxy inject grind flush after cure take a photo for the recordedit_task{"title":"Repair cracked concrete","location":"bay 7","assignee":"Danny","end_date":"2026-05-07","priority":"p1","items":["rout crack to proper width","blow out dust","apply bond breaker if needed","fill with epoxy inject","grind flush after cure","take a photo for the record"]}
172drywall damage on the ceiling assign it to carlos two person job should cost around 7000 start next tuesday end by thursday checklist cut out damaged section install backing hang new drywall tape and mud final walkthrough with the gcedit_task{"title":"Patch drywall ceiling","assignee":"Carlos","start_date":"2026-05-12","end_date":"2026-05-14","manpower":"2","cost":"7000","items":["cut out damaged section","install backing","hang new drywall","tape and mud","final walkthrough with the GC"]}
173put it under tileedit_task{"category":"tile"}
174apply waterproofing membrane on sheet 4 put mike on it bump it to p1 by end of month team of 3 budget about 4000 checklist clean substrate apply primer coat let cure apply first membrane coat let cureedit_task{"title":"Apply waterproofing membrane","plan":"Sheet 4","assignee":"Mike","end_date":"2026-05-29","priority":"p1","manpower":"3","cost":"4000","items":["clean substrate","apply primer coat","let cure","apply first membrane coat","let cure"]}
175new sprinkler heads need to go in assign it to carlos crew of 3 should cost around 5000 start may 5 end next tuesday checklist confirm pipe layout with plan drill ceiling openings install drops attach heads final walkthrough with the gcedit_task{"title":"Install sprinkler heads","assignee":"Carlos","start_date":"2026-05-05","end_date":"2026-05-12","manpower":"3","cost":"5000","items":["confirm pipe layout with plan","drill ceiling openings","install drops","attach heads","final walkthrough with the GC"]}
176bump it to not a rush and push the deadline to thursdayedit_task{"end_date":"2026-05-07","priority":"p3"}
177gotta get recessed lights run in the south corridor by end of month medium priorityedit_task{"title":"Install recessed lighting","location":"south corridor","end_date":"2026-05-29","priority":"p2"}
178move to e2 and bump it to p1edit_task{"plan":"E-2","priority":"p1"}
179need tile floor going in the mezzanine put brenda on it should be done by wednesday cost about 15000edit_task{"title":"Install tile flooring","location":"mezzanine","assignee":"Brenda","end_date":"2026-05-06","cost":"15000"}
180we got a leak under the sink assign it to omar crew of 3 should cost around 6000 start this monday end may 5 checklist shut off water supply remove p trap inspect drain line replace gaskets final walkthrough with the gcedit_task{"title":"Fix water leak under sink","assignee":"Omar","start_date":"2026-05-04","end_date":"2026-05-05","manpower":"3","cost":"6000","items":["shut off water supply","remove p-trap","inspect drain line","replace gaskets","final walkthrough with the GC"]}
181exterior caulking is failing on id101 mark it low priority reza handles it by wednesday budget around 2500 location is boiler room category waterproofingedit_task{"title":"Install exterior caulking","plan":"ID-101","location":"boiler room","category":"waterproofing","assignee":"Reza","end_date":"2026-05-06","priority":"p3","cost":"2500"}
182troy is leading the attic insulation in unit 12 start wednesday morning finish may 8 cost is around 15000 and we need 1 guy mark it closededit_task{"title":"Insulate attic space","location":"unit 12","assignee":"Troy","status":"closed","start_date":"2026-05-06","end_date":"2026-05-08","manpower":"1","cost":"15000"}
183paint exterior facade on e1 put jake on it critical by end of month 8 workers budget about 12000 checklist pressure wash surface scrape loose paint apply primer caulk gaps and cracks roll first coatedit_task{"title":"Paint exterior facade","plan":"E1","assignee":"Jake","end_date":"2026-05-29","priority":"p1","manpower":"8","cost":"12000","items":["pressure wash surface","scrape loose paint","apply primer","caulk gaps and cracks","roll first coat"]}
184we'll have 10 workers on siteedit_task{"manpower":"10"}
185running recessed lights in mechanical room level 3 on the ground floor gc wants it done by may 17 put eddie and a crew of 9 on it budget is 5000 make it p1 category electricaledit_task{"title":"Install recessed lighting","plan":"ground floor","location":"mechanical room level 3","category":"electrical","assignee":"Eddie","end_date":"2026-05-17","priority":"p1","manpower":"9","cost":"5000"}
186roof membrane has a leak in mechanical room level 3 on the ground floor mark it tracked danny is handling it due by wednesday checklist locate the breach clean and dry the area apply primer document repairedit_task{"title":"Repair roof membrane","plan":"ground floor","location":"mechanical room level 3","assignee":"Danny","status":"tracked","end_date":"2026-05-06","items":["locate the breach","clean and dry the area","apply primer","document repair"]}
187need cracks in the floor slab fixed in the courtyard put juan on it should be done by thursday cost about 3000edit_task{"title":"Repair cracked concrete","location":"courtyard","assignee":"Juan","end_date":"2026-05-07","cost":"3000"}
188move it to server roomedit_task{"location":"server room"}
189we got exterior paint job assign that to felix low priority end of next week is fineedit_task{"title":"Paint exterior facade","assignee":"Felix","end_date":"2026-05-15","priority":"p3"}
190gotta get the waterproofing membrane applied by may 21 crew of 10 should be enough make it high priority and assign brendaedit_task{"title":"Apply waterproofing membrane","assignee":"Brenda","end_date":"2026-05-21","priority":"p1","manpower":"10"}
191make it medium priorityedit_task{"priority":"p2"}
192we're scheduling cracked concrete repair in the east lobby on p2 need 8 guys starting may 3 through next tuesday ballpark cost 3000edit_task{"title":"Repair cracked concrete","plan":"P-2","location":"east lobby","start_date":"2026-05-03","end_date":"2026-05-12","manpower":"8","cost":"3000"}
193classify this as structuraledit_task{"category":"structural"}
194gotta get the slab poured by may 18 need 10 workers on it make it high priority and assign steveedit_task{"title":"Pour concrete slab","assignee":"Steve","end_date":"2026-05-18","priority":"p1","manpower":"10"}
195mark this open something's wrong with the electrical panel in the west wingedit_task{"title":"Fix electrical panel issue","location":"west wing","status":"open"}
196assign ray make it high priority and due by fridayedit_task{"assignee":"Ray","end_date":"2026-05-08","priority":"p1"}
197we're fixing an hvac ductwork leak on a3 in suite 3b starting may 2 and wrapping friday need 10 guys on it cost 2000 make it hvac and give it to carlos checklist locate all leak points clean duct surface apply mastic sealant wrap with foil tape reinsulate if needed test system airflowedit_task{"title":"Fix HVAC ductwork leak","plan":"A-3","location":"suite 3B","category":"HVAC","assignee":"Carlos","start_date":"2026-05-02","end_date":"2026-05-08","manpower":"10","cost":"2000","items":["locate all leak points","clean duct surface","apply mastic sealant","wrap with foil tape","re-insulate if needed","test system airflow"]}
198we're installing the suspended ceiling grid in the lobby on sheet 9 mark it verified omar is handling it due by may 10 checklist snap layout lines install wall angle hang main tees final inspectionedit_task{"title":"Install suspended ceiling grid","plan":"Sheet 9","location":"lobby","assignee":"Omar","status":"verified","end_date":"2026-05-10","items":["snap layout lines","install wall angle","hang main tees","final inspection"]}
199we're pulling the old carpet in stairwell b put omar on it make it medium priority and have it done by next tuesdayedit_task{"title":"Replace carpet in stairwell","location":"stairwell B","assignee":"Omar","end_date":"2026-05-12","priority":"p2"}
200we've got an hvac duct leak in the plenum at grid line b2 put kim on it have it wrapped by friday make it medium priority checklist locate all leak points clean duct surface apply mastic sealant wrap with foil tape reinsulate if needed take a photo for the recordedit_task{"title":"Fix HVAC ductwork leak","location":"plenum at grid line B2","assignee":"Kim","end_date":"2026-05-08","priority":"p2","items":["locate all leak points","clean duct surface","apply mastic sealant","wrap with foil tape","re-insulate if needed","take a photo for the record"]}
201breaker keeps tripping on a301 start this monday crew of 7 cost around 1200 this is electrical workedit_task{"title":"Fix electrical panel issue","plan":"A301","category":"electrical","start_date":"2026-05-04","manpower":"7","cost":"1200"}
202fire suppression work in the cafeteria budget is about 20000 assign brendaedit_task{"title":"Fire suppression work in cafeteria","location":"cafeteria","category":"fire suppression","assignee":"Brenda","cost":"20000"}
203work is in the east lobbyedit_task{"location":"east lobby"}
204patch the roof membrane at grid line c4 make it high priorityedit_task{"title":"Repair roof membrane","location":"grid line C4","priority":"p1"}
205there's a hole in the drywall ceiling in bay 4 on a101 mark it open kim is handling it due by next tuesday checklist cut out damaged section install backing hang new drywall take photoedit_task{"title":"Patch drywall ceiling","plan":"A101","location":"bay 4","assignee":"Kim","status":"open","end_date":"2026-05-12","items":["cut out damaged section","install backing","hang new drywall","take photo"]}
206we need a new partition wall put up assign it to steve crew of 3 cost around 2500 start this monday and finish next friday checklist snap chalk lines lay bottom plate stand studs 16 oc install top plate final walkthrough with the gcedit_task{"title":"Frame new partition wall","assignee":"Steve","start_date":"2026-05-04","end_date":"2026-05-15","manpower":"3","cost":"2500","items":["snap chalk lines","lay bottom plate","stand studs 16 OC","install top plate","final walkthrough with the GC"]}
207put juan and 6 guys on new carpet in the office start next tuesdayedit_task{"title":"Replace carpet in office","assignee":"Juan","start_date":"2026-05-12","manpower":"6"}
208move this to p2 and set the location to bay 12edit_task{"plan":"P-2","location":"bay 12"}
209need that hole in the drywall ceiling fixed in the server room put tony on it and get it done by may 18 cost around 1200edit_task{"title":"Patch drywall ceiling","location":"server room","assignee":"Tony","end_date":"2026-05-18","cost":"1200"}
210we need the exterior facade painted on m2 put kim on it make it medium priority have it done by end of month crew of 1 budget about 3500 checklist pressure wash surface scrape loose paint apply primer caulk gaps and cracks roll first coatedit_task{"title":"Paint exterior facade","plan":"M2","assignee":"Kim","end_date":"2026-05-29","priority":"p2","manpower":"1","cost":"3500","items":["pressure wash surface","scrape loose paint","apply primer","caulk gaps and cracks","roll first coat"]}
211we're scheduling partition wall framing in parking garage level 1 on a4 need a team of 3 starting may 4 through next tuesday ballpark cost 7000edit_task{"title":"Frame new partition wall","plan":"A-4","location":"parking garage level 1","start_date":"2026-05-04","end_date":"2026-05-12","manpower":"3","cost":"7000"}
212replace the broken glass panel in elevator shaft b on sheet 4 make it medium priority and due by thursdayedit_task{"title":"Replace broken glass panel","plan":"Sheet 4","location":"elevator shaft B","end_date":"2026-05-07","priority":"p2"}
213we're scheduling plumbing fixture replacement in the boiler room on mep 1 need 8 guys start next tuesday and run through thursday ballpark cost 4000edit_task{"title":"Replace broken plumbing fixture","plan":"MEP-1","location":"boiler room","start_date":"2026-05-12","end_date":"2026-05-14","manpower":"8","cost":"4000"}
214get this going wednesday morningedit_task{"start_date":"2026-05-06"}
215make this high priorityedit_task{"priority":"p1"}
216patch the roof membrane at grid line b2 put dave on it this is urgent and it needs to be wrapped by may 6 checklist locate the breach clean and dry the area apply primer cut patch membrane adhere patch take a photo for the recordedit_task{"title":"Repair roof membrane","location":"grid line B2","assignee":"Dave","end_date":"2026-05-06","priority":"p1","items":["locate the breach","clean and dry the area","apply primer","cut patch membrane","adhere patch","take a photo for the record"]}
217this is attic insulation in the penthouse level on sheet 7 mark it needs review brenda is handling it due by end of day wednesday checklist check existing r value seal air leaks install baffles at eaves take documentation photosedit_task{"title":"Insulate attic space","plan":"Sheet 7","location":"penthouse level","assignee":"Brenda","status":"needs review","end_date":"2026-05-06","items":["check existing R-value","seal air leaks","install baffles at eaves","take documentation photos"]}
218need that partition wall torn down in the north corridor put luis on it should be done by end of month cost around 2000edit_task{"title":"Demolish interior partition","location":"north corridor","assignee":"Luis","end_date":"2026-05-29","cost":"2000"}
219gotta get the new partition wall framed by end of month 3 workers should be enough make it medium priority and assign steveedit_task{"title":"Frame new partition wall","assignee":"Steve","end_date":"2026-05-29","priority":"p2","manpower":"3"}
220install recessed cans in bay 7 on fp2 make it low priority and due by may 10edit_task{"title":"Install recessed lighting","plan":"FP-2","location":"bay 7","end_date":"2026-05-10","priority":"p3"}
221swap out the exhaust fan on the pool deck put lena on it make it medium priority and have it done by may 7 checklist shut off circuit at panel remove old fan install new housing wire new fan test operation take a photo for the recordedit_task{"title":"Replace exhaust fan","location":"pool deck","assignee":"Lena","end_date":"2026-05-07","priority":"p2","items":["shut off circuit at panel","remove old fan","install new housing","wire new fan","test operation","take a photo for the record"]}
222we've got a duct leak in the plenum assign pat to it start tomorrow and wrap it by friday budget 1200 checklist locate all leak points clean duct surface apply mastic sealant wrap with foil tape final walkthrough with the gcedit_task{"title":"Fix HVAC ductwork leak","assignee":"Pat","start_date":"2026-05-06","end_date":"2026-05-08","cost":"1200","items":["locate all leak points","clean duct surface","apply mastic sealant","wrap with foil tape","final walkthrough with the GC"]}
223running rough in wiring in the north corridor put sarah on it have it done by may 21 make it medium priority checklist pull permits mark box locations per plan drill studs pull wire stub out boxes take a photo for the recordedit_task{"title":"Run electrical rough-in","location":"north corridor","assignee":"Sarah","end_date":"2026-05-21","priority":"p2","items":["pull permits","mark box locations per plan","drill studs","pull wire","stub out boxes","take a photo for the record"]}
224sal is leading the new partition framing in the penthouse level start tomorrow finish wednesday cost 8000 need a crew of 5 mark it needs reviewedit_task{"title":"Frame new partition wall","location":"penthouse level","assignee":"Sal","status":"needs review","start_date":"2026-05-06","end_date":"2026-05-06","manpower":"5","cost":"8000"}
225set the start date to tomorrow and the due date to next fridayedit_task{"start_date":"2026-05-06","end_date":"2026-05-15"}
226we're laying new carpet in the office on mep1 luis is on it make it top priorityedit_task{"title":"Replace carpet in office","plan":"MEP-1","assignee":"Luis","priority":"p1"}
227have luis take care of itedit_task{"assignee":"Luis"}
228troy is replacing the broken glass panel in bay 7 this is glazing work make it high priority have it done by friday need a crew of 5 budget 15000 mark it in progressedit_task{"title":"Replace broken glass panel","location":"bay 7","category":"glazing","assignee":"Troy","status":"in progress","end_date":"2026-05-08","priority":"p1","manpower":"5","cost":"15000"}
229jake is taking the broken window glazing over at fp3 budget 3000 mark it on holdedit_task{"title":"Replace broken window glazing","plan":"FP-3","assignee":"Jake","status":"on hold","cost":"3000"}
230new sprinkler heads need to go in on a301 start next tuesday need 5 workers cost 7000edit_task{"title":"Install sprinkler heads","plan":"A301","start_date":"2026-05-12","manpower":"5","cost":"7000"}
231assign this to kim and make it medium priorityedit_task{"assignee":"Kim","priority":"p2"}
232drawing is a4edit_task{"plan":"A-4"}
233we're recaulking the facade joints on sheet 4 dave is on it make it urgent and due by next fridayedit_task{"title":"Install exterior caulking","plan":"Sheet 4","assignee":"Dave","end_date":"2026-05-15","priority":"p1"}
234tag steve as the assigneeedit_task{"assignee":"Steve"}
235there's a slow drip under the kitchen sink in the cafeteria put sarah on it this can wait checklist shut off water supply remove p trap inspect drain line replace gaskets reinstall p trap take a photo for the recordedit_task{"title":"Fix water leak under sink","location":"cafeteria","assignee":"Sarah","priority":"p3","items":["shut off water supply","remove p-trap","inspect drain line","replace gaskets","reinstall p-trap","take a photo for the record"]}
236assign mike make it low priority and due by may 21edit_task{"assignee":"Mike","end_date":"2026-05-21","priority":"p3"}
237painting the exterior facade in bay 7 on p2 the gc wants it done by end of day wednesday put maria and a crew of 8 on it budget 1500 make it medium priority this is paintingedit_task{"title":"Paint exterior facade","plan":"P-2","location":"bay 7","category":"painting","assignee":"Maria","end_date":"2026-05-06","priority":"p2","manpower":"8","cost":"1500"}
238apply the waterproofing membrane on the lobby deck on a301 mark it open pat is handling it due by may 6 checklist clean substrate apply primer coat let cure document resultedit_task{"title":"Apply waterproofing membrane","plan":"A301","location":"lobby deck","assignee":"Pat","status":"open","end_date":"2026-05-06","items":["clean substrate","apply primer coat","let cure","document result"]}
239new carpet is going into the office in the west wing on civil sheet 3 mark it in progress luis is handling it due by friday checklist move furniture remove old carpet pull tack strips reinstall furnitureedit_task{"title":"Replace carpet in office","plan":"civil sheet 3","location":"west wing","assignee":"Luis","status":"in progress","end_date":"2026-05-08","items":["move furniture","remove old carpet","pull tack strips","reinstall furniture"]}
240make the category plumbing put it on structural s2 and set the status to trackededit_task{"plan":"structural S2","category":"plumbing","status":"tracked"}
241need a new partition framed in the east wing put gus on it should be done by next tuesday cost around 15000edit_task{"title":"Frame new partition wall","location":"east wing","assignee":"Gus","end_date":"2026-05-12","cost":"15000"}
242there's drywall damage on the ceiling at grid line c4 on a3 the gc wants it done by thursday put kim and a crew of 6 on it budget around 7000 make it medium priority this is drywalledit_task{"title":"Patch drywall ceiling","plan":"A-3","location":"grid line C4","category":"drywall","assignee":"Kim","end_date":"2026-05-07","priority":"p2","manpower":"6","cost":"7000"}
243patch the drywall ceiling on e1 put nadia on it make it high priority have it done by end of next week crew of 5 budget about 2500 checklist cut out damaged section install backing hang new drywall tape and mud sand smoothedit_task{"title":"Patch drywall ceiling","plan":"E1","assignee":"Nadia","end_date":"2026-05-15","priority":"p1","manpower":"5","cost":"2500","items":["cut out damaged section","install backing","hang new drywall","tape and mud","sand smooth"]}
244we need the slab poured assign it to sarah start next tuesday budget 2500 checklist set forms place rebar order concrete pour slab final walkthrough with the gcedit_task{"title":"Pour concrete slab","assignee":"Sarah","start_date":"2026-05-12","manpower":"2","cost":"2500","items":["set forms","place rebar","order concrete","pour slab","final walkthrough with the GC"]}
245put bobby and a crew of 6 on the floor tile installation start may 5 and finish by may 8edit_task{"title":"Install tile flooring","assignee":"Bobby","start_date":"2026-05-05","end_date":"2026-05-08","manpower":"6"}
246assign maria make it medium priority and cost 6000edit_task{"assignee":"Maria","priority":"p2","cost":"6000"}
247there's a hole in the drywall ceiling assign that to danny low priority end of next week is fineedit_task{"title":"Patch drywall ceiling","assignee":"Danny","end_date":"2026-05-15","priority":"p3"}
248we're scheduling exterior caulking in the east wing on s1 need a crew of 6 starting this monday through may 9 ballpark cost 8000edit_task{"title":"Install exterior caulking","plan":"S-1","location":"east wing","start_date":"2026-05-04","end_date":"2026-05-09","manpower":"6","cost":"8000"}
249nadia is replacing the broken faucet in stairwell b start next tuesday finish by end of month cost 6000 need a crew of 3 mark it completeedit_task{"title":"Replace broken plumbing fixture","location":"stairwell B","assignee":"Nadia","status":"complete","start_date":"2026-05-12","end_date":"2026-05-29","manpower":"3","cost":"6000"}
250need a team of 5 for thisedit_task{"manpower":"5"}
251we're pouring the slab in the south corridor on s1 put mike and a crew of 7 on it budget about 15000 make it low priority this is concrete workedit_task{"title":"Pour concrete slab","plan":"S-1","location":"south corridor","category":"concrete","assignee":"Mike","priority":"p3","manpower":"7","cost":"15000"}
252attach it to sheet 4edit_task{"plan":"Sheet 4"}
253we've got a new pull station to install assign that to reza low priority end of next week is fineedit_task{"title":"Install fire alarm pull station","assignee":"Reza","end_date":"2026-05-15","priority":"p3"}
254it's in room 412 and the status is pending inspectionedit_task{"location":"room 412","status":"pending inspection"}
255assign this to daveedit_task{"assignee":"Dave"}
256need rough in wiring run in suite 101 put tony on it should be done by may 16 cost around 2000edit_task{"title":"Run electrical rough-in","location":"suite 101","assignee":"Tony","end_date":"2026-05-16","cost":"2000"}
257patch the roof membrane in the penthouse level on fp2 the gc wants it done by next friday put brenda and a crew of 3 on it budget 1500 make it medium priority this is roofingedit_task{"title":"Repair roof membrane","plan":"FP-2","location":"penthouse level","category":"roofing","assignee":"Brenda","end_date":"2026-05-15","priority":"p2","manpower":"3","cost":"1500"}
258bump it to high priorityedit_task{"priority":"p1"}
259start tomorrow finish by thursday put troy on itedit_task{"assignee":"Troy","start_date":"2026-05-06","end_date":"2026-05-07"}
260this one is an hvac ductwork leak on m3 in the east wing zack handles it make it high priority have it done by next tuesday budget around 15000edit_task{"title":"Fix HVAC ductwork leak","plan":"M-3","location":"east wing","category":"HVAC","assignee":"Zack","end_date":"2026-05-12","priority":"p1","cost":"15000"}
261paint the exterior facade in stairwell c put luis on it have it done by next tuesday this is low priority checklist pressure wash surface scrape loose paint apply primer caulk gaps and cracks roll first coat take a photo for the recordedit_task{"title":"Paint exterior facade","location":"stairwell C","assignee":"Luis","end_date":"2026-05-12","priority":"p3","items":["pressure wash surface","scrape loose paint","apply primer","caulk gaps and cracks","roll first coat","take a photo for the record"]}
262fix the cracks in the floor slab in bay 7 put danny on it have it done by thursday make it top priority checklist rout crack to proper width blow out dust apply bond breaker if needed fill with epoxy inject grind flush after cure take a photo for the recordedit_task{"title":"Repair cracked concrete","location":"bay 7","assignee":"Danny","end_date":"2026-05-07","priority":"p1","items":["rout crack to proper width","blow out dust","apply bond breaker if needed","fill with epoxy inject","grind flush after cure","take a photo for the record"]}
263we need the drywall ceiling patched assign it to carlos crew of 2 cost around 7000 start next tuesday and finish thursday checklist cut out damaged section install backing hang new drywall tape and mud final walkthrough with the gcedit_task{"title":"Patch drywall ceiling","assignee":"Carlos","start_date":"2026-05-12","end_date":"2026-05-14","manpower":"2","cost":"7000","items":["cut out damaged section","install backing","hang new drywall","tape and mud","final walkthrough with the GC"]}
264put it under tileedit_task{"category":"tile"}
265apply waterproofing membrane on sheet 4 put mike on it make it high priority by end of month team of 3 budget about 4000 checklist clean substrate apply primer coat let cure apply first membrane coat let cureedit_task{"title":"Apply waterproofing membrane","plan":"Sheet 4","assignee":"Mike","end_date":"2026-05-29","priority":"p1","manpower":"3","cost":"4000","items":["clean substrate","apply primer coat","let cure","apply first membrane coat","let cure"]}
266new sprinkler heads need to go in assign it to carlos crew of 3 cost around 5000 start may 5 and finish next tuesday checklist confirm pipe layout with plan drill ceiling openings install drops attach heads final walkthrough with the gcedit_task{"title":"Install sprinkler heads","assignee":"Carlos","start_date":"2026-05-05","end_date":"2026-05-12","manpower":"3","cost":"5000","items":["confirm pipe layout with plan","drill ceiling openings","install drops","attach heads","final walkthrough with the GC"]}
267make it low priority and push the deadline to thursdayedit_task{"end_date":"2026-05-07","priority":"p3"}
268gotta get recessed lights run in the south corridor by end of month make it medium priorityedit_task{"title":"Install recessed lighting","location":"south corridor","end_date":"2026-05-29","priority":"p2"}
269move it to e2 and bump it to high priorityedit_task{"plan":"E-2","priority":"p1"}
270need tile floor put down in the mezzanine put brenda on it should be done by end of day wednesday cost around 15000edit_task{"title":"Install tile flooring","location":"mezzanine","assignee":"Brenda","end_date":"2026-05-06","cost":"15000"}
271we've got a leak under the sink assign it to omar crew of 3 cost around 6000 start this monday and finish may 5 checklist shut off water supply remove p trap inspect drain line replace gaskets final walkthrough with the gcedit_task{"title":"Fix water leak under sink","assignee":"Omar","start_date":"2026-05-04","end_date":"2026-05-05","manpower":"3","cost":"6000","items":["shut off water supply","remove p-trap","inspect drain line","replace gaskets","final walkthrough with the GC"]}
272waterproofing work in the boiler room on id101 make it low priority reza handles it by end of day wednesday budget around 2500edit_task{"title":"Apply waterproofing membrane","plan":"ID-101","location":"boiler room","category":"waterproofing","assignee":"Reza","end_date":"2026-05-06","priority":"p3","cost":"2500"}
273troy is leading the attic insulation in unit 12 start wednesday morning finish may 8 cost around 15000 need 1 guy mark it closededit_task{"title":"Insulate attic space","location":"unit 12","assignee":"Troy","status":"closed","start_date":"2026-05-06","end_date":"2026-05-08","manpower":"1","cost":"15000"}
274paint the exterior facade on e1 put jake on it make it high priority by end of month need 8 workers budget about 12000 checklist pressure wash surface scrape loose paint apply primer caulk gaps and cracks roll first coatedit_task{"title":"Paint exterior facade","plan":"E1","assignee":"Jake","end_date":"2026-05-29","priority":"p1","manpower":"8","cost":"12000","items":["pressure wash surface","scrape loose paint","apply primer","caulk gaps and cracks","roll first coat"]}
275we'll have 10 workers on siteedit_task{"manpower":"10"}
276running recessed lights in mechanical room level 3 on the ground floor gc wants it done by may 17 put eddie and a crew of 9 on it budget is 5000 make it high priority this is electricaledit_task{"title":"Install recessed lighting","plan":"ground floor","location":"mechanical room level 3","category":"electrical","assignee":"Eddie","end_date":"2026-05-17","priority":"p1","manpower":"9","cost":"5000"}
277roof membrane has a leak in mechanical room level 3 on the ground floor mark it tracked danny is handling it due by end of day wednesday checklist locate the breach clean and dry the area apply primer document repairedit_task{"title":"Repair roof membrane","plan":"ground floor","location":"mechanical room level 3","assignee":"Danny","status":"tracked","end_date":"2026-05-06","items":["locate the breach","clean and dry the area","apply primer","document repair"]}
278need the cracks in the floor slab fixed in the courtyard put juan on it should be done by thursday cost around 3000edit_task{"title":"Repair cracked concrete","location":"courtyard","assignee":"Juan","end_date":"2026-05-07","cost":"3000"}
279move it to the server roomedit_task{"location":"server room"}
280we've got exterior paint work assign that to felix low priority end of next week is fineedit_task{"title":"Paint exterior facade","assignee":"Felix","end_date":"2026-05-15","priority":"p3"}
281tear down the partition wall in the west wing put zack on it make it urgent checklist verify no electrical or plumbing in wall shut off circuits remove door strip drywall cut studs take a photo for the recordedit_task{"title":"Demolish interior partition","location":"west wing","assignee":"Zack","priority":"p1","items":["verify no electrical or plumbing in wall","shut off circuits","remove door","strip drywall","cut studs","take a photo for the record"]}
282do the exterior paint on level 4 put sal on it have it wrapped by end of day wednesday make it high priority checklist pressure wash surface scrape loose paint apply primer caulk gaps and cracks roll first coat take a photo for the recordedit_task{"title":"Paint exterior facade","location":"level 4","assignee":"Sal","end_date":"2026-05-06","priority":"p1","items":["pressure wash surface","scrape loose paint","apply primer","caulk gaps and cracks","roll first coat","take a photo for the record"]}
283start wednesday morning finish by next tuesday put hector on itedit_task{"assignee":"Hector","start_date":"2026-05-06","end_date":"2026-05-12"}
284gotta get the interior wall demo done by next tuesday crew of 9 should be enough make it medium priority and assign lenaedit_task{"title":"Demolish interior partition","assignee":"Lena","end_date":"2026-05-12","priority":"p2","manpower":"9"}
285relabel this as pour concrete slabedit_task{"title":"Pour concrete slab"}
286do the electrical rough in on the data center floor put danny on it make it urgent get it done by thursdayedit_task{"title":"Run electrical rough-in","location":"data center floor","assignee":"Danny","end_date":"2026-05-07","priority":"p1"}
287the ac unit is shot in suite 101 put dave on it should be done by may 20 cost around 3500edit_task{"title":"Replace broken HVAC unit","location":"suite 101","assignee":"Dave","end_date":"2026-05-20","cost":"3500"}
288need a new partition framed in basement level 2 put zack on it should be done by may 9 cost around 3500edit_task{"title":"Frame new partition wall","location":"basement level 2","assignee":"Zack","end_date":"2026-05-09","cost":"3500"}
289the concrete slab has cracks assign it to eddie crew of 2 cost around 3000 start tomorrow and finish thursday checklist rout crack to proper width blow out dust apply bond breaker if needed fill with epoxy inject final walkthrough with the gcedit_task{"title":"Repair cracked concrete","assignee":"Eddie","start_date":"2026-05-06","end_date":"2026-05-07","manpower":"2","cost":"3000","items":["rout crack to proper width","blow out dust","apply bond breaker if needed","fill with epoxy inject","final walkthrough with the GC"]}
290the hvac unit needs replacing in the west wing on a201 make it medium priority due by end of monthedit_task{"title":"Replace broken HVAC unit","plan":"A201","location":"west wing","end_date":"2026-05-29","priority":"p2"}
291gotta get the busted fixture in the bathroom fixed team of 3 should be enough make it low priority and assign zackedit_task{"title":"Replace broken plumbing fixture","location":"bathroom","assignee":"Zack","priority":"p3","manpower":"3"}
292we've got a duct leak in the plenum assign it to steve crew of 2 cost around 3500 start may 4 finish may 8 checklist locate all leak points clean duct surface apply mastic sealant wrap with foil tape final walkthrough with the gcedit_task{"title":"Fix HVAC ductwork leak","assignee":"Steve","start_date":"2026-05-04","end_date":"2026-05-08","manpower":"2","cost":"3500","items":["locate all leak points","clean duct surface","apply mastic sealant","wrap with foil tape","final walkthrough with the GC"]}
293we're pouring the concrete slab on s2 in the server room starting wednesday morning and wrapping thursday crew of 10 cost 800 this is concrete hector is leading it checklist set forms place rebar order concrete pour slab screed and float apply curing compoundedit_task{"title":"Pour concrete slab","plan":"S-2","location":"server room","category":"concrete","assignee":"Hector","start_date":"2026-05-06","end_date":"2026-05-07","manpower":"10","cost":"800","items":["set forms","place rebar","order concrete","pour slab","screed and float","apply curing compound"]}
294danny is taking the broken exhaust fan in the bathroom on s2 budget 10000 mark it trackededit_task{"title":"Replace exhaust fan","plan":"S-2","location":"bathroom","assignee":"Danny","status":"tracked","cost":"10000"}
295we're repairing cracked concrete on a301 in the mechanical room starting wednesday morning and wrapping thursday 7 workers on it cost 6000 this is concrete zack is leading it checklist rout crack to proper width blow out dust apply bond breaker if needed fill with epoxy inject grind flush after cure apply surface sealeredit_task{"title":"Repair cracked concrete","plan":"A301","location":"mechanical room","category":"concrete","assignee":"Zack","start_date":"2026-05-06","end_date":"2026-05-07","manpower":"7","cost":"6000","items":["rout crack to proper width","blow out dust","apply bond breaker if needed","fill with epoxy inject","grind flush after cure","apply surface sealer"]}
296the ceiling drywall needs patching on a3 carlos is on it make it top priority by thursdayedit_task{"title":"Patch drywall ceiling","plan":"A-3","assignee":"Carlos","end_date":"2026-05-07","priority":"p1"}
297change the category to concrete and mark it completeedit_task{"category":"concrete","status":"complete"}
298give it to omaredit_task{"assignee":"Omar"}
299eddie and his 5 guys are on the exterior paint in the mezzanine category painting budget 7000 need it by end of day wednesday checklist pressure wash surface scrape loose paint apply primer caulk gaps and cracks document everythingedit_task{"title":"Paint exterior facade","location":"mezzanine","category":"painting","assignee":"Eddie","end_date":"2026-05-06","manpower":"5","cost":"7000","items":["pressure wash surface","scrape loose paint","apply primer","caulk gaps and cracks","document everything"]}
300mark this verified it's rough in wiring in unit 7edit_task{"title":"Run electrical rough-in","location":"unit 7","status":"verified"}
301the fire alarm pull station is broken assign it to vic crew of 3 cost around 12000 start wednesday morning and finish end of day wednesday checklist shut off fire alarm circuit remove old device run new conduit if needed mount backbox final walkthrough with the gcedit_task{"title":"Install fire alarm pull station","assignee":"Vic","start_date":"2026-05-06","end_date":"2026-05-06","manpower":"3","cost":"12000","items":["shut off fire alarm circuit","remove old device","run new conduit if needed","mount backbox","final walkthrough with the GC"]}
302fix the hvac ductwork leak on s1 put kim on it this can wait by end of month team of 9 budget about 5000 checklist locate all leak points clean duct surface apply mastic sealant wrap with foil tape reinsulate if needededit_task{"title":"Fix HVAC ductwork leak","plan":"S-1","assignee":"Kim","end_date":"2026-05-29","priority":"p3","manpower":"9","cost":"5000","items":["locate all leak points","clean duct surface","apply mastic sealant","wrap with foil tape","re-insulate if needed"]}
303we're fixing the hvac ductwork leak on id101 in the courtyard starting tomorrow and wrapping next friday team of 4 on it cost 4000 this is hvac ray is leading it checklist locate all leak points clean duct surface apply mastic sealant wrap with foil tape reinsulate if needed test system airflowedit_task{"title":"Fix HVAC ductwork leak","plan":"ID-101","location":"courtyard","category":"HVAC","assignee":"Ray","start_date":"2026-05-06","end_date":"2026-05-15","manpower":"4","cost":"4000","items":["locate all leak points","clean duct surface","apply mastic sealant","wrap with foil tape","re-insulate if needed","test system airflow"]}
304carpet replacement in suite 4b put brenda on it have it wrapped by next tuesday make it urgent checklist move furniture remove old carpet pull tack strips prep subfloor install new tack strips take a photo for the recordedit_task{"title":"Replace carpet in office","location":"suite 4B","assignee":"Brenda","end_date":"2026-05-12","priority":"p1","items":["move furniture","remove old carpet","pull tack strips","prep subfloor","install new tack strips","take a photo for the record"]}
305steve and his 8 workers are swapping out the old hvac on the roof deck this is hvac budget 3500 need it by next friday checklist shut down power to unit remove old unit install new unit check refrigerant lines document everythingedit_task{"title":"Replace broken HVAC unit","location":"roof deck","category":"HVAC","assignee":"Steve","end_date":"2026-05-15","manpower":"8","cost":"3500","items":["shut down power to unit","remove old unit","install new unit","check refrigerant lines","document everything"]}
306repair the roof membrane on fp3 put jake on it make it high priority by end of next week crew of 8 budget about 8000 checklist locate the breach clean and dry the area apply primer cut patch membrane adhere patchedit_task{"title":"Repair roof membrane","plan":"FP-3","assignee":"Jake","end_date":"2026-05-15","priority":"p1","manpower":"8","cost":"8000","items":["locate the breach","clean and dry the area","apply primer","cut patch membrane","adhere patch"]}
307reza and his crew of 2 are replacing the fire alarm pull station in suite 3b category fire alarm budget 7000 need it by end of day wednesday checklist shut off fire alarm circuit remove old device run new conduit if needed mount backbox document everythingedit_task{"title":"Install fire alarm pull station","location":"suite 3B","category":"fire alarm","assignee":"Reza","end_date":"2026-05-06","manpower":"2","cost":"7000","items":["shut off fire alarm circuit","remove old device","run new conduit if needed","mount backbox","document everything"]}
308this is a broken exhaust fan in the bathroom in unit 12 on m3 mark it closed steve is handling it due by next friday checklist shut off circuit at panel remove old fan install new housing take finished photoedit_task{"title":"Replace exhaust fan","plan":"M-3","location":"unit 12","assignee":"Steve","status":"closed","end_date":"2026-05-15","items":["shut off circuit at panel","remove old fan","install new housing","take finished photo"]}
309put ray and a crew of 2 on the drywall ceiling damage start wednesday morning and finish end of day wednesdayedit_task{"title":"Patch drywall ceiling","assignee":"Ray","start_date":"2026-05-06","end_date":"2026-05-06","manpower":"2"}
310mark this complete it's rough in wiring on the ground flooredit_task{"title":"Run electrical rough-in","location":"ground floor","status":"complete"}
311repair the roof membrane on fp3 put jake on it make it medium priority by end of month 7 workers budget about 20000 checklist locate the breach clean and dry the area apply primer cut patch membrane adhere patchedit_task{"title":"Repair roof membrane","plan":"FP-3","assignee":"Jake","end_date":"2026-05-29","priority":"p2","manpower":"7","cost":"20000","items":["locate the breach","clean and dry the area","apply primer","cut patch membrane","adhere patch"]}
312task title is fix hvac ductwork leakedit_task{"title":"Fix HVAC ductwork leak"}
313we've got a leak under the sink assign it to brenda crew of 2 cost around 3500 start may 6 and finish may 19 checklist shut off water supply remove p trap inspect drain line replace gaskets final walkthrough with the gcedit_task{"title":"Fix water leak under sink","assignee":"Brenda","start_date":"2026-05-06","end_date":"2026-05-19","manpower":"2","cost":"3500","items":["shut off water supply","remove p-trap","inspect drain line","replace gaskets","final walkthrough with the GC"]}
314we're fixing the leak under the sink on structural s2 in stairwell b starting next tuesday and wrapping may 14 crew of 3 cost around 6000 category plumbing mike is leading it checklist shut off water supply remove p trap inspect drain line replace gaskets reinstall p trap run water testedit_task{"title":"Fix water leak under sink","plan":"structural S2","location":"stairwell B","category":"plumbing","assignee":"Mike","start_date":"2026-05-12","end_date":"2026-05-14","manpower":"3","cost":"6000","items":["shut off water supply","remove p-trap","inspect drain line","replace gaskets","reinstall p-trap","run water test"]}
315this is fixing the cracks in the floor slab in the courtyard on sheet 7 mark it pending inspection kim is handling it due by end of month checklist rout crack to proper width blow out dust apply bond breaker if needed documentedit_task{"title":"Repair cracked concrete","plan":"Sheet 7","location":"courtyard","assignee":"Kim","status":"pending inspection","end_date":"2026-05-29","items":["rout crack to proper width","blow out dust","apply bond breaker if needed","document"]}
316recaulk the facade joints on s1 mark it low priority maria handles it by thursday budget 6000 location basement level 2 category waterproofingedit_task{"title":"Install exterior caulking","plan":"S-1","location":"basement level 2","category":"waterproofing","assignee":"Maria","end_date":"2026-05-07","priority":"p3","cost":"6000"}
317laying tile in the bathroom on sheet 7 starts this monday wraps up by thursday 6 workers on the crew cost is 3500 category is tileedit_task{"title":"Install tile flooring","plan":"Sheet 7","location":"bathroom","category":"tile","start_date":"2026-05-04","end_date":"2026-05-07","manpower":"6","cost":"3500"}
318assign brenda set priority to high and due before the inspectionedit_task{"assignee":"Brenda","priority":"p1"}
319put eddie and a crew of 4 on knocking out the old partition this is demolition work starts may 6 done by thursdayedit_task{"title":"Demolish interior partition","category":"demolition","assignee":"Eddie","start_date":"2026-05-06","end_date":"2026-05-07","manpower":"4"}
320move this to m2 and set the location to bay 12edit_task{"plan":"M2","location":"bay 12"}
321fix the hvac ductwork leak on structural s2 put vic on it make it high priority by end of month team of 10 budget about 20000 checklist locate all leak points clean duct surface apply mastic sealant wrap with foil tape reinsulate if needededit_task{"title":"Fix HVAC ductwork leak","plan":"structural S2","assignee":"Vic","end_date":"2026-05-29","priority":"p1","manpower":"10","cost":"20000","items":["locate all leak points","clean duct surface","apply mastic sealant","wrap with foil tape","re-insulate if needed"]}
322we're painting the exterior facade on s1 in bay 7 starting tomorrow and wrapping friday crew of 1 cost about 1200 category painting eddie is leading it checklist pressure wash surface scrape loose paint apply primer caulk gaps and cracks roll first coat roll second coatedit_task{"title":"Paint exterior facade","plan":"S-1","location":"bay 7","category":"painting","assignee":"Eddie","start_date":"2026-05-06","end_date":"2026-05-08","manpower":"1","cost":"1200","items":["pressure wash surface","scrape loose paint","apply primer","caulk gaps and cracks","roll first coat","roll second coat"]}
323move it to p3edit_task{"plan":"P-3"}
324lena is taking crack repair in unit 23 this is concrete work make it medium priority done by may 16 need a crew of 9 budget about 5000 mark it trackededit_task{"title":"Repair cracked concrete","location":"unit 23","category":"concrete","assignee":"Lena","status":"tracked","end_date":"2026-05-16","priority":"p2","manpower":"9","cost":"5000"}
325replace the broken faucet on e4 start this monday wrap up by may 5 team of 6 cost about 1200edit_task{"title":"Replace broken plumbing fixture","plan":"E4","start_date":"2026-05-04","end_date":"2026-05-05","manpower":"6","cost":"1200"}
326we're demoing the partition on c1 in the main lobby starting tomorrow and wrapping next tuesday 9 workers on it cost about 4000 this is demolition juan is leading it checklist verify no electrical or plumbing in wall shut off circuits remove door strip drywall cut studs remove platesedit_task{"title":"Demolish interior partition","plan":"C-1","location":"main lobby","category":"demolition","assignee":"Juan","start_date":"2026-05-06","end_date":"2026-05-12","manpower":"9","cost":"4000","items":["verify no electrical or plumbing in wall","shut off circuits","remove door","strip drywall","cut studs","remove plates"]}
327omar is taking the new partition wall on m3 budget 7000 mark it pending inspectionedit_task{"title":"Frame new partition wall","plan":"M-3","assignee":"Omar","status":"pending inspection","cost":"7000"}
328paint the exterior facade on sheet 4 by end of month need 8 workers cost 800edit_task{"title":"Paint exterior facade","plan":"Sheet 4","end_date":"2026-05-29","manpower":"8","cost":"800"}
329set priority to low location roof deck cost around 2500edit_task{"location":"roof deck","priority":"p3","cost":"2500"}
330install the suspended ceiling grid in the west wing on fp2 the gc wants it done by may 19 put pat and a team of 2 on it budget about 15000 make it top priorityedit_task{"title":"Install suspended ceiling grid","plan":"FP-2","location":"west wing","assignee":"Pat","end_date":"2026-05-19","priority":"p1","manpower":"2","cost":"15000"}
331start tomorrow end next friday manpower 4 guys and cost around 10000edit_task{"start_date":"2026-05-06","end_date":"2026-05-15","manpower":"4","cost":"10000"}
332we're scheduling carpet replacement for basement level 2 on e1 need 4 guys starting may 4 ballpark cost 20000edit_task{"title":"Replace carpet in office","plan":"E1","location":"basement level 2","start_date":"2026-05-04","manpower":"4","cost":"20000"}
333put mike on itedit_task{"assignee":"Mike"}
334patch the drywall ceiling on e1 put eddie on it make it high priority by end of month 7 workers budget about 2500 checklist cut out damaged section install backing hang new drywall tape and mud sand smoothedit_task{"title":"Patch drywall ceiling","plan":"E1","assignee":"Eddie","end_date":"2026-05-29","priority":"p1","manpower":"7","cost":"2500","items":["cut out damaged section","install backing","hang new drywall","tape and mud","sand smooth"]}
335we're repairing cracked concrete on m3 at the pool deck starting tomorrow and wrapping next friday 4 guys on it cost about 6000 this is concrete hector is leading it checklist rout crack to proper width blow out dust apply bond breaker if needed fill with epoxy inject grind flush after cure apply surface sealeredit_task{"title":"Repair cracked concrete","plan":"M-3","location":"pool deck","category":"concrete","assignee":"Hector","start_date":"2026-05-06","end_date":"2026-05-15","manpower":"4","cost":"6000","items":["rout crack to proper width","blow out dust","apply bond breaker if needed","fill with epoxy inject","grind flush after cure","apply surface sealer"]}
336bump it to low priorityedit_task{"priority":"p3"}
337felix is leading the cracked window glazing in the west wing start wednesday morning finish may 16 cost 1500 need a team of 9 mark it trackededit_task{"title":"Replace broken window glazing","location":"west wing","assignee":"Felix","status":"tracked","start_date":"2026-05-06","end_date":"2026-05-16","manpower":"9","cost":"1500"}
338install sprinkler heads on a101 put gus on it make it medium priority by end of month 4 workers budget about 15000 checklist confirm pipe layout with plan drill ceiling openings install drops attach heads pressure testedit_task{"title":"Install sprinkler heads","plan":"A101","assignee":"Gus","end_date":"2026-05-29","priority":"p2","manpower":"4","cost":"15000","items":["confirm pipe layout with plan","drill ceiling openings","install drops","attach heads","pressure test"]}
339status is completeedit_task{"status":"complete"}
340drawing fp2 location level 5 category glazing assign hectoredit_task{"plan":"FP-2","location":"level 5","category":"glazing","assignee":"Hector"}
341new wall needs to be framed in the mezzanine put steve on it by end of month make it low priority checklist snap chalk lines lay bottom plate stand studs 16 oc install top plate frame door opening take a photo for the recordedit_task{"title":"Frame new partition wall","location":"mezzanine","assignee":"Steve","end_date":"2026-05-29","priority":"p3","items":["snap chalk lines","lay bottom plate","stand studs 16 OC","install top plate","frame door opening","take a photo for the record"]}
342assign hector low priority cost 15000 and due by thursdayedit_task{"assignee":"Hector","end_date":"2026-05-07","priority":"p3","cost":"15000"}
343recaulk the facade joints in the east wing on structural s2 make it high priority due by next fridayedit_task{"title":"Install exterior caulking","plan":"structural S2","location":"east wing","end_date":"2026-05-15","priority":"p1"}
344mark this open it's a new partition wall in room 412edit_task{"title":"Frame new partition wall","location":"room 412","status":"open"}
345mark this pending inspection it's patching the roof membrane in elevator shaft bedit_task{"title":"Repair roof membrane","location":"elevator shaft B","status":"pending inspection"}
346we're installing the fire alarm pull station on a202 at the pool deck starting may 6 and wrapping friday crew of 8 cost around 800 category fire alarm nadia is leading it checklist shut off fire alarm circuit remove old device run new conduit if needed mount backbox wire new device test alarm activationedit_task{"title":"Install fire alarm pull station","plan":"A202","location":"pool deck","category":"fire alarm","assignee":"Nadia","start_date":"2026-05-06","end_date":"2026-05-08","manpower":"8","cost":"800","items":["shut off fire alarm circuit","remove old device","run new conduit if needed","mount backbox","wire new device","test alarm activation"]}
347move to sheet 9 and bump it to high priorityedit_task{"plan":"Sheet 9","priority":"p1"}
348site is north corridoredit_task{"location":"north corridor"}
349assign to luis and set priority to mediumedit_task{"assignee":"Luis","priority":"p2"}
350we need data and av cabling installed assign it to ray crew of 3 cost around 12000 start next tuesday and finish end of month checklist pull permits if required route cable path drill penetrations pull cable final walkthrough with the gcedit_task{"title":"Install low voltage cabling","assignee":"Ray","start_date":"2026-05-12","end_date":"2026-05-29","manpower":"3","cost":"12000","items":["pull permits if required","route cable path","drill penetrations","pull cable","final walkthrough with the GC"]}
351relabel this as fix electrical panel issueedit_task{"title":"Fix electrical panel issue"}
352this is electrical rough in on level 5 on fp3 make it top priority due by end of monthedit_task{"title":"Run electrical rough-in","plan":"FP-3","location":"level 5","end_date":"2026-05-29","priority":"p1"}
353call it fix water leak under sinkedit_task{"title":"fix water leak under sink"}
354set cost to 3500edit_task{"cost":"3500"}
355run low voltage cable in the break room on floor 2 put danny on it have it done by friday make it high priority checklist pull permits if required route cable path drill penetrations pull cable terminate at patch panel take a photo for the recordedit_task{"title":"Install low voltage cabling","location":"break room floor 2","assignee":"Danny","end_date":"2026-05-08","priority":"p1","items":["pull permits if required","route cable path","drill penetrations","pull cable","terminate at patch panel","take a photo for the record"]}
356this is installing data and av cabling on level 2 on the ground floor mark it closed kim is handling it due by next tuesday checklist pull permits if required route cable path drill penetrations sign offedit_task{"title":"Install low voltage cabling","plan":"ground floor","location":"level 2","assignee":"Kim","status":"closed","end_date":"2026-05-12","items":["pull permits if required","route cable path","drill penetrations","sign off"]}
357set cost to about 12000 manpower to 6 and category to paintingedit_task{"category":"painting","manpower":"6","cost":"12000"}
358the toilet is cracked and needs replacing assign it to eddie crew of 2 cost around 3000 start this monday and finish end of month checklist shut off water remove old fixture clean mounting surface install new fixture final walkthrough with the gcedit_task{"title":"Replace broken plumbing fixture","assignee":"Eddie","start_date":"2026-05-04","end_date":"2026-05-29","manpower":"2","cost":"3000","items":["shut off water","remove old fixture","clean mounting surface","install new fixture","final walkthrough with the GC"]}
359assign to maria and set priority to p1edit_task{"assignee":"Maria","priority":"p1"}
360we're scheduling partition demo for the north corridor on a201 need a team of 9 starting wednesday morning through may 19 ballpark cost 15000edit_task{"title":"Demolish interior partition","plan":"A201","location":"north corridor","start_date":"2026-05-06","end_date":"2026-05-19","manpower":"9","cost":"15000"}
361tony is taking the slab pour on plumbing p4 budget 1500 mark it closededit_task{"title":"Pour concrete slab","plan":"plumbing P4","assignee":"Tony","status":"closed","cost":"1500"}
362this one is a busted window pane on e4 in the boiler room make it urgent felix handles it by friday budget around 8000 category glazingedit_task{"title":"Replace broken window glazing","plan":"E4","location":"boiler room","category":"glazing","assignee":"Felix","end_date":"2026-05-08","priority":"p1","cost":"8000"}
363we've got exterior paint work assign that to vic low priority end of next week is fineedit_task{"title":"Paint exterior facade","assignee":"Vic","end_date":"2026-05-15","priority":"p3"}
364move this to structural s2 and set the location to elevator shaft bedit_task{"plan":"structural S2","location":"elevator shaft B"}
365put juan and a crew of 5 on the low voltage cabling start next tuesday and have it done by may 17edit_task{"title":"Install low voltage cabling","assignee":"Juan","start_date":"2026-05-12","end_date":"2026-05-17","manpower":"5"}
366we've got hvac ductwork coming apart on a4 pat is on this make it high priority by end of monthedit_task{"title":"Fix HVAC ductwork leak","plan":"A-4","assignee":"Pat","end_date":"2026-05-29","priority":"p1"}
367there's a slow drip under the kitchen sink in the mechanical room on civil sheet 3 mark it open brenda is handling it due by thursday checklist shut off water supply remove p trap inspect drain line take photoedit_task{"title":"Fix water leak under sink","plan":"civil sheet 3","location":"mechanical room","assignee":"Brenda","status":"open","end_date":"2026-05-07","items":["shut off water supply","remove p-trap","inspect drain line","take photo"]}
368the ceiling tile system is going in on c1 at bay 12 make it medium priority kim handles it budget around 5000edit_task{"title":"Install ceiling grid and tiles","plan":"C-1","location":"bay 12","assignee":"Kim","priority":"p2","cost":"5000"}
369set cost to 3000 and manpower to 1edit_task{"manpower":"1","cost":"3000"}
370fix the cracks in the floor slab in bay 4 put dave on it have it wrapped by may 11 make it low priority checklist rout crack to proper width blow out dust apply bond breaker if needed fill with epoxy inject grind flush after cure take a photo for the recordedit_task{"title":"Repair cracked concrete","location":"bay 4","assignee":"Dave","end_date":"2026-05-11","priority":"p3","items":["rout crack to proper width","blow out dust","apply bond breaker if needed","fill with epoxy inject","grind flush after cure","take a photo for the record"]}
371we've got fire suppression heads to install assign that to juan low priority end of next week is fineedit_task{"title":"Install sprinkler heads","assignee":"Juan","end_date":"2026-05-15","priority":"p3"}
372start may 6 end may 7 manpower 3 workers and cost 3000edit_task{"start_date":"2026-05-06","end_date":"2026-05-07","manpower":"3","cost":"3000"}
373target completion end of monthedit_task{"end_date":"2026-05-29"}
374title should be replace carpet in officeedit_task{"title":"Replace carpet in office"}
375send a team of 5 overedit_task{"manpower":"5"}
376vic and his crew of 1 are on the broken exhaust fan at the pool deck this is mechanical budget 3500 need it by next friday checklist shut off circuit at panel remove old fan install new housing wire new fan document everythingedit_task{"title":"Replace exhaust fan","location":"pool deck","category":"mechanical","assignee":"Vic","end_date":"2026-05-15","manpower":"1","cost":"3500","items":["shut off circuit at panel","remove old fan","install new housing","wire new fan","document everything"]}
377we're fixing the leak under the sink on mep1 in the main lobby starting this monday and wrapping may 5 team of 9 cost 4000 category plumbing vic is leading it checklist shut off water supply remove p trap inspect drain line replace gaskets reinstall p trap run water testedit_task{"title":"Fix water leak under sink","plan":"MEP-1","location":"main lobby","category":"plumbing","assignee":"Vic","start_date":"2026-05-04","end_date":"2026-05-05","manpower":"9","cost":"4000","items":["shut off water supply","remove p-trap","inspect drain line","replace gaskets","reinstall p-trap","run water test"]}
378set cost to 15000edit_task{"cost":"15000"}
379install tile flooring on a301 put sarah on it make it high priority by end of next week team of 9 budget about 6000 checklist demo old flooring level subfloor apply thinset mortar lay tile to pattern cut edge tilesedit_task{"title":"Install tile flooring","plan":"A301","assignee":"Sarah","end_date":"2026-05-15","priority":"p1","manpower":"9","cost":"6000","items":["demo old flooring","level subfloor","apply thinset mortar","lay tile to pattern","cut edge tiles"]}
380we need the shower pan waterproofed assign it to jake crew of 3 cost around 2000 start this monday and finish friday checklist clean substrate apply primer coat let cure apply first membrane coat final walkthrough with the gcedit_task{"title":"Apply waterproofing membrane","assignee":"Jake","start_date":"2026-05-04","end_date":"2026-05-08","manpower":"3","cost":"2000","items":["clean substrate","apply primer coat","let cure","apply first membrane coat","final walkthrough with the GC"]}
381we need a new partition wall put up assign it to omar crew of 2 cost around 3500 start wednesday morning and finish thursday checklist snap chalk lines lay bottom plate stand studs 16 oc install top plate final walkthrough with the gcedit_task{"title":"Frame new partition wall","assignee":"Omar","start_date":"2026-05-06","end_date":"2026-05-07","manpower":"2","cost":"3500","items":["snap chalk lines","lay bottom plate","stand studs 16 OC","install top plate","final walkthrough with the GC"]}
382assign nadia on it and get it done by may 7edit_task{"assignee":"Nadia","end_date":"2026-05-07"}
383slab pour scheduled at exterior facade east put steve on that make it high priority get it done by next tuesdayedit_task{"title":"Pour concrete slab","location":"exterior facade east","assignee":"Steve","end_date":"2026-05-12","priority":"p1"}
384put pat and a crew of 3 on painting the exterior facade this is painting work start may 3 and finish thursdayedit_task{"title":"Paint exterior facade","category":"painting","assignee":"Pat","start_date":"2026-05-03","end_date":"2026-05-07","manpower":"3"}
385put it on the ground flooredit_task{"plan":"ground floor"}
386this is a busted fixture in the bathroom in the lobby on e1 mark it open bobby is handling it due by end of month checklist shut off water remove old fixture clean mounting surface take photoedit_task{"title":"Replace broken plumbing fixture","plan":"E1","location":"lobby bathroom","assignee":"Bobby","status":"open","end_date":"2026-05-29","items":["shut off water","remove old fixture","clean mounting surface","take photo"]}
387the fire alarm pull station is broken in mechanical room level 3 put reza on it have it done by may 17 make it low priority checklist shut off fire alarm circuit remove old device run new conduit if needed mount backbox wire new device take a photo for the recordedit_task{"title":"Install fire alarm pull station","location":"mechanical room level 3","assignee":"Reza","end_date":"2026-05-17","priority":"p3","items":["shut off fire alarm circuit","remove old device","run new conduit if needed","mount backbox","wire new device","take a photo for the record"]}
388luis and his team of 5 are on the hvac ductwork leak in the server room category hvac budget 3500 need it by end of day wednesday checklist locate all leak points clean duct surface apply mastic sealant wrap with foil tape document everythingedit_task{"title":"Fix HVAC ductwork leak","location":"server room","category":"HVAC","assignee":"Luis","end_date":"2026-05-06","manpower":"5","cost":"3500","items":["locate all leak points","clean duct surface","apply mastic sealant","wrap with foil tape","document everything"]}
389gotta get new carpet into the office in the north corridor by end of month make it medium priorityedit_task{"title":"Replace carpet in office","location":"north corridor","end_date":"2026-05-29","priority":"p2"}
390we're installing the fire alarm pull station on a4 at grid line b2 starting tomorrow and wrapping may 8 team of 5 cost about 1200 category fire alarm brenda is leading it checklist shut off fire alarm circuit remove old device run new conduit if needed mount backbox wire new device test alarm activationedit_task{"title":"Install fire alarm pull station","plan":"A-4","location":"grid line B2","category":"fire alarm","assignee":"Brenda","start_date":"2026-05-06","end_date":"2026-05-08","manpower":"5","cost":"1200","items":["shut off fire alarm circuit","remove old device","run new conduit if needed","mount backbox","wire new device","test alarm activation"]}
391happening at stairwell bedit_task{"location":"stairwell B"}
392change the title to patch drywall ceilingedit_task{"title":"patch drywall ceiling"}
393gotta get the hvac unit replaced in elevator shaft b by friday make it medium priorityedit_task{"title":"Replace broken HVAC unit","location":"elevator shaft B","end_date":"2026-05-08","priority":"p2"}
394we've got a new partition to frame in suite 3b put mike on it have it wrapped by next friday make it medium priority checklist snap chalk lines lay bottom plate stand studs 16 oc install top plate frame door opening take a photo for the recordedit_task{"title":"Frame new partition wall","location":"suite 3B","assignee":"Mike","end_date":"2026-05-15","priority":"p2","items":["snap chalk lines","lay bottom plate","stand studs 16 OC","install top plate","frame door opening","take a photo for the record"]}
395trade is hvacedit_task{"category":"HVAC"}
396eddie is leading the water leak under the sink in suite 3b start may 3 finish by thursday cost 4000 need 2 workers mark it openedit_task{"title":"Fix water leak under sink","location":"suite 3B","assignee":"Eddie","status":"open","start_date":"2026-05-03","end_date":"2026-05-07","manpower":"2","cost":"4000"}
397this is swapping out the exhaust fan in the west wing on e4 mark it open tony is handling it due by end of day wednesday checklist shut off circuit at panel remove old fan install new housing take finished photoedit_task{"title":"Replace exhaust fan","plan":"E4","location":"west wing","assignee":"Tony","status":"open","end_date":"2026-05-06","items":["shut off circuit at panel","remove old fan","install new housing","take finished photo"]}
398happening at bay 4edit_task{"location":"bay 4"}
399due end of day wednesdayedit_task{"end_date":"2026-05-06"}
400gotta get the panel with the tripped breaker fixed at grid line c4 by end of day wednesday make it low priorityedit_task{"title":"Fix electrical panel issue","location":"grid line C4","end_date":"2026-05-06","priority":"p3"}
401we're insulating the attic on a201 on the ground floor starting wednesday morning and wrapping before the gc walkthrough team of 6 cost 6000 category insulation maria is leading it checklist check existing r value seal air leaks install baffles at eaves blow insulation to target depth verify depth with ruler take documentation photosedit_task{"title":"Insulate attic space","plan":"A201","location":"ground floor","category":"insulation","assignee":"Maria","start_date":"2026-05-06","end_date":"2026-05-09","manpower":"6","cost":"6000","items":["check existing R-value","seal air leaks","install baffles at eaves","blow insulation to target depth","verify depth with ruler","take documentation photos"]}
402patch the roof membrane in stairwell b on fp3 mark it tracked gus is handling it due by next friday checklist locate the breach clean and dry the area apply primer document repairedit_task{"title":"Repair roof membrane","plan":"FP-3","location":"stairwell B","assignee":"Gus","status":"tracked","end_date":"2026-05-15","items":["locate the breach","clean and dry the area","apply primer","document repair"]}
403mark this on hold there's a slow drip under the kitchen sink in parking garage level 1edit_task{"title":"Fix water leak under sink","location":"parking garage level 1","status":"on hold"}
404we're scheduling carpet replacement at grid line c4 on s2 need a team of 2 starting may 3 through may 8 ballpark cost 7000edit_task{"title":"Replace carpet in office","plan":"S-2","location":"grid line C4","start_date":"2026-05-03","end_date":"2026-05-08","manpower":"2","cost":"7000"}
405troy is leading the new pull station install in elevator shaft b start tomorrow finish friday cost 5000 need a crew of 5 mark it trackededit_task{"title":"Install fire alarm pull station","location":"elevator shaft B","assignee":"Troy","status":"tracked","start_date":"2026-05-06","end_date":"2026-05-08","manpower":"5","cost":"5000"}
406budget is 5000 and category is electricaledit_task{"category":"electrical","cost":"5000"}
407sarah is taking the ac unit replacement in unit 7 this is hvac work make it high priority done by may 6 need a crew of 3 budget 7000 mark trackededit_task{"title":"Replace broken HVAC unit","location":"unit 7","category":"HVAC","assignee":"Sarah","status":"tracked","end_date":"2026-05-06","priority":"p1","manpower":"3","cost":"7000"}
408this is tile flooring in grid line b2 on sheet 4 mark it in progress tony is handling it due by next tuesday checklist demo old flooring level subfloor apply thinset mortar final walkthroughedit_task{"title":"Install tile flooring","plan":"Sheet 4","location":"grid line B2","assignee":"Tony","status":"in progress","end_date":"2026-05-12","items":["demo old flooring","level subfloor","apply thinset mortar","final walkthrough"]}
409we're installing recessed lighting on s2 at exterior facade east starting this monday and wrapping next tuesday 8 workers on it cost 1500 category electrical mike is leading it checklist run romex to junction box mount the housing cans connect wiring install trim rings test all fixtures take finished photoedit_task{"title":"Install recessed lighting","plan":"S-2","location":"exterior facade east","category":"electrical","assignee":"Mike","start_date":"2026-05-04","end_date":"2026-05-12","manpower":"8","cost":"1500","items":["run romex to junction box","mount the housing cans","connect wiring","install trim rings","test all fixtures","take finished photo"]}
410we've got a leak under the sink in the penthouse level on e1 the gc wants it done by next tuesday put steve and a team of 5 on it budget 3500 make it urgent this is plumbingedit_task{"title":"Fix water leak under sink","plan":"E1","location":"penthouse level","category":"plumbing","assignee":"Steve","end_date":"2026-05-12","priority":"p1","manpower":"5","cost":"3500"}
411we're scheduling cracked concrete repair in room 305 on c1 need a team of 4 starting may 3 through next tuesday ballpark cost 5000edit_task{"title":"Repair cracked concrete","plan":"C-1","location":"room 305","start_date":"2026-05-03","end_date":"2026-05-12","manpower":"4","cost":"5000"}
412the fire alarm pull station is broken assign it to mike crew of 3 cost around 1200 start next tuesday checklist shut off fire alarm circuit remove old device run new conduit if needed mount backbox final walkthrough with the gcedit_task{"title":"Install fire alarm pull station","assignee":"Mike","start_date":"2026-05-12","manpower":"3","cost":"1200","items":["shut off fire alarm circuit","remove old device","run new conduit if needed","mount backbox","final walkthrough with the GC"]}
413carlos is leading the facade joint caulking in bay 12 start next tuesday finish thursday cost around 15000 need 8 workers mark it verifiededit_task{"title":"Install exterior caulking","location":"bay 12","assignee":"Carlos","status":"verified","start_date":"2026-05-12","end_date":"2026-05-14","manpower":"8","cost":"15000"}
414we're installing tile flooring on c1 on level 4 starting tomorrow and wrapping before the inspection team of 8 cost 2500 category tile felix is leading it checklist demo old flooring level subfloor apply thinset mortar lay tile to pattern cut edge tiles groutedit_task{"title":"Install tile flooring","plan":"C-1","location":"level 4","category":"tile","assignee":"Felix","start_date":"2026-05-06","end_date":"2026-05-11","manpower":"8","cost":"2500","items":["demo old flooring","level subfloor","apply thinset mortar","lay tile to pattern","cut edge tiles","grout"]}
415vic and his team of 4 are on the electrical panel issue in stairwell a category electrical budget 800 need it by may 7 checklist identify tripped breaker check load on circuit inspect wiring connections replace breaker if faulty document everythingedit_task{"title":"Fix electrical panel issue","location":"stairwell A","category":"electrical","assignee":"Vic","end_date":"2026-05-07","manpower":"4","cost":"800","items":["identify tripped breaker","check load on circuit","inspect wiring connections","replace breaker if faulty","document everything"]}
416put it under fire suppressionedit_task{"category":"fire suppression"}
417we're scheduling carpet replacement for stairwell a on sheet 9 need 2 guys starting may 2 through next tuesday ballpark cost 15000edit_task{"title":"Replace carpet in office","plan":"Sheet 9","location":"stairwell A","start_date":"2026-05-02","end_date":"2026-05-12","manpower":"2","cost":"15000"}
418brenda is leading the waterproofing membrane in stairwell b start next tuesday finish next tuesday cost 20000 need 5 workers mark it verifiededit_task{"title":"Apply waterproofing membrane","location":"stairwell B","assignee":"Brenda","status":"verified","start_date":"2026-05-12","end_date":"2026-05-12","manpower":"5","cost":"20000"}
419this one is a drop ceiling on fp2 at the data center floor make it medium priority maria handles it by end of month budget around 2000edit_task{"title":"Install ceiling grid and tiles","plan":"FP-2","location":"data center floor","assignee":"Maria","end_date":"2026-05-29","priority":"p2","cost":"2000"}
420budget is 2000 and category is demolitionedit_task{"category":"demolition","cost":"2000"}
421set priority low location penthouse level cost 7000edit_task{"location":"penthouse level","priority":"p3","cost":"7000"}
422sal is leading the new sprinkler heads on mep1 budget about 5000 mark it verifiededit_task{"title":"Install sprinkler heads","plan":"MEP-1","assignee":"Sal","status":"verified","cost":"5000"}
423mark this closed it's demoing the interior wall in mechanical room level 3edit_task{"title":"Demolish interior partition","location":"mechanical room level 3","status":"closed"}
424assign omar make it high priority and due by may 10edit_task{"assignee":"Omar","end_date":"2026-05-10","priority":"p1"}
425nadia and her crew of 10 are framing a new partition in room 412 category framing budget around 3500 need it by may 20 checklist snap chalk lines lay bottom plate stand studs 16 oc install top plate document everythingedit_task{"title":"Frame new partition wall","location":"room 412","category":"framing","assignee":"Nadia","end_date":"2026-05-20","manpower":"10","cost":"3500","items":["snap chalk lines","lay bottom plate","stand studs 16 OC","install top plate","document everything"]}
426mark this tracked it's demoing the interior wall in the cafeteriaedit_task{"title":"Demolish interior partition","location":"cafeteria","status":"tracked"}
427need new sprinkler heads installed in the loading dock put reza on it should be done by may 7 cost around 1500edit_task{"title":"Install sprinkler heads","location":"loading dock","assignee":"Reza","end_date":"2026-05-07","cost":"1500"}
428this one is water leaking from the pipes under the sink on m3 at bay 12 make it medium priority gus handles it by next tuesday budget around 4000 category plumbingedit_task{"title":"Fix water leak under sink","plan":"M-3","location":"bay 12","category":"plumbing","assignee":"Gus","end_date":"2026-05-12","priority":"p2","cost":"4000"}
429drywall damage on the ceiling in level 5 budget about 10000 assign steveedit_task{"title":"Patch drywall ceiling","location":"level 5","assignee":"Steve","cost":"10000"}
430move to fp2 location stairwell c and mark openedit_task{"plan":"FP-2","location":"stairwell C","status":"open"}
431need data and av cabling installed in north corridor put hector on it cost around 2500edit_task{"title":"Install low voltage cabling","location":"north corridor","assignee":"Hector","cost":"2500"}
432trade is concreteedit_task{"category":"concrete"}
433we've got an ac unit shot that needs replacing assign that to nadia low priority end of next week is fineedit_task{"title":"Replace broken HVAC unit","assignee":"Nadia","end_date":"2026-05-15","priority":"p3"}
434this one should be urgentedit_task{"priority":"p1"}
435we've got a roof membrane leak assign it to tony crew of 3 cost around 7000 start tomorrow and finish end of month checklist locate the breach clean and dry the area apply primer cut patch membrane final walkthrough with the gcedit_task{"title":"Repair roof membrane","assignee":"Tony","start_date":"2026-05-06","end_date":"2026-05-29","manpower":"3","cost":"7000","items":["locate the breach","clean and dry the area","apply primer","cut patch membrane","final walkthrough with the GC"]}
436title should be repair cracked concreteedit_task{"title":"Repair cracked concrete"}
437assign juan make it low priority and due by may 7edit_task{"assignee":"Juan","end_date":"2026-05-07","priority":"p3"}
438pat is leading the cracked toilet replacement in the east lobby start next tuesday finish may 14 cost 5000 need 2 workers mark it trackededit_task{"title":"Replace broken plumbing fixture","location":"east lobby","assignee":"Pat","status":"tracked","start_date":"2026-05-12","end_date":"2026-05-14","manpower":"2","cost":"5000"}
439gotta get a new partition wall up in parking garage level 1 by thursday make it high priorityedit_task{"title":"Frame new partition wall","location":"parking garage level 1","end_date":"2026-05-07","priority":"p1"}
440tearing down the partition wall on c1 starts may 2 and wraps up by end of day wednesday 9 guys on the crew cost 1500edit_task{"title":"Demolish interior partition","plan":"C-1","start_date":"2026-05-02","end_date":"2026-05-06","manpower":"9","cost":"1500"}
441tearing down the partition wall on c1 starts may 2 wraps up by end of day wednesday 9 guys on the crew cost 1500edit_task{"title":"Demolish interior partition","plan":"C-1","start_date":"2026-05-02","end_date":"2026-05-06","manpower":"9","cost":"1500"}
442install the suspended ceiling grid in the south corridor on id101 the gc wants it done by end of month put sal and a crew of 2 on it budget around 1200 bump it to high priorityedit_task{"title":"Install suspended ceiling grid","plan":"ID-101","location":"south corridor","assignee":"Sal","end_date":"2026-05-29","priority":"p1","manpower":"2","cost":"1200"}
443update the name to insulate attic spaceedit_task{"title":"Insulate attic space"}
444happening at unit 7edit_task{"location":"unit 7"}
445begin may 4edit_task{"start_date":"2026-05-04"}
446gotta get the shower pan waterproofed in unit 23 by thursday make it medium priorityedit_task{"title":"Apply waterproofing membrane","location":"unit 23","end_date":"2026-05-07","priority":"p2"}
447we need attic insulation added assign it to omar crew of 3 cost around 12000 start tomorrow and finish end of month checklist check existing r value seal air leaks install baffles at eaves blow insulation to target depth final walkthrough with the gcedit_task{"title":"Insulate attic space","assignee":"Omar","start_date":"2026-05-06","end_date":"2026-05-29","manpower":"3","cost":"12000","items":["check existing R-value","seal air leaks","install baffles at eaves","blow insulation to target depth","final walkthrough with the GC"]}
448mark this pending inspection the toilet is cracked and needs replacing in elevator shaft bedit_task{"title":"Replace broken plumbing fixture","location":"elevator shaft B","status":"pending inspection"}
449carlos and his team of 2 are on the water leak under the sink in the north corridor category plumbing budget 10000 need it by may 5 checklist shut off water supply remove p trap inspect drain line replace gaskets document everythingedit_task{"title":"Fix water leak under sink","location":"north corridor","category":"plumbing","assignee":"Carlos","end_date":"2026-05-05","manpower":"2","cost":"10000","items":["shut off water supply","remove p-trap","inspect drain line","replace gaskets","document everything"]}
450set start date to may 4 and due date to may 16edit_task{"start_date":"2026-05-04","end_date":"2026-05-16"}
451need the hvac duct pulling apart fixed in level 3 put juan on it should be done by next tuesday cost around 6000edit_task{"title":"Fix HVAC ductwork leak","location":"level 3","assignee":"Juan","end_date":"2026-05-12","cost":"6000"}
452gotta get the exterior paint job in unit 12 done by next tuesday make it high priorityedit_task{"title":"Paint exterior facade","location":"unit 12","end_date":"2026-05-12","priority":"p1"}
453new pull station install in level 5 put omar on it make it low priority get it done by may 19edit_task{"title":"Install fire alarm pull station","location":"level 5","assignee":"Omar","end_date":"2026-05-19","priority":"p3"}
454felix and his team of 5 are on the roof membrane leak at the pool deck category roofing budget 3500 need it by may 18 checklist locate the breach clean and dry the area apply primer cut patch membrane document everythingedit_task{"title":"Repair roof membrane","location":"pool deck","category":"roofing","assignee":"Felix","end_date":"2026-05-18","manpower":"5","cost":"3500","items":["locate the breach","clean and dry the area","apply primer","cut patch membrane","document everything"]}
455we're scheduling the concrete slab pour for parking garage level 1 on the roof level plan need a team of 6 starting tomorrow through may 15 ballpark cost 6000edit_task{"title":"Pour concrete slab","plan":"roof level","location":"parking garage level 1","start_date":"2026-05-06","end_date":"2026-05-15","manpower":"6","cost":"6000"}
456we're blowing insulation in the attic in the mezzanine put vic on it have it wrapped before the inspection make it medium priority checklist check existing r value seal air leaks install baffles at eaves blow insulation to target depth verify depth with ruler take a photo for the recordedit_task{"title":"Insulate attic space","location":"mezzanine","assignee":"Vic","end_date":"2026-05-15","priority":"p2","items":["check existing R-value","seal air leaks","install baffles at eaves","blow insulation to target depth","verify depth with ruler","take a photo for the record"]}
457start tomorrow end next friday manpower crew of 4 and cost 2500edit_task{"start_date":"2026-05-06","end_date":"2026-05-15","manpower":"4","cost":"2500"}
458we're fixing the hvac ductwork leak on plumbing p4 in room 412 starting this monday and wrapping thursday 3 workers on it cost 12000 category hvac steve is leading it checklist locate all leak points clean duct surface apply mastic sealant wrap with foil tape reinsulate if needed test system airflowedit_task{"title":"Fix HVAC ductwork leak","plan":"plumbing P4","location":"room 412","category":"HVAC","assignee":"Steve","start_date":"2026-05-04","end_date":"2026-05-07","manpower":"3","cost":"12000","items":["locate all leak points","clean duct surface","apply mastic sealant","wrap with foil tape","re-insulate if needed","test system airflow"]}
459mark this complete it's tile flooring in room 412edit_task{"title":"Install tile flooring","location":"room 412","status":"complete"}
460this one is data and av cabling on mep1 make it medium priority felix handles it by friday budget around 10000 location level 2 category low voltageedit_task{"title":"Install low voltage cabling","plan":"MEP-1","location":"level 2","category":"low voltage","assignee":"Felix","end_date":"2026-05-08","priority":"p2","cost":"10000"}
461slab pour is scheduled assign it to omar crew of 3 cost around 2500 start next tuesday checklist set forms place rebar order concrete pour slab final walkthrough with the gcedit_task{"title":"Pour concrete slab","assignee":"Omar","start_date":"2026-05-12","manpower":"3","cost":"2500","items":["set forms","place rebar","order concrete","pour slab","final walkthrough with the GC"]}
462this is demoing the interior wall in the mechanical room on fp3 mark it open reza is handling it due by next friday checklist verify no electrical or plumbing in wall shut off circuits remove door patch flooredit_task{"title":"Demolish interior partition","plan":"FP-3","location":"mechanical room","assignee":"Reza","status":"open","end_date":"2026-05-15","items":["verify no electrical or plumbing in wall","shut off circuits","remove door","patch floor"]}
463recaulking the facade joints in unit 7 budget about 3000 assign brendaedit_task{"title":"Install exterior caulking","location":"unit 7","assignee":"Brenda","cost":"3000"}
464install low voltage cabling on e4 put eddie on it make it medium priority by end of next week team of 8 budget about 4000 checklist pull permits if required route cable path drill penetrations pull cable terminate at patch paneledit_task{"title":"Install low voltage cabling","plan":"E4","assignee":"Eddie","end_date":"2026-05-15","priority":"p2","manpower":"8","cost":"4000","items":["pull permits if required","route cable path","drill penetrations","pull cable","terminate at patch panel"]}
465mike and his team of 6 are on the ac unit replacement in the lobby category hvac budget 15000 need it by may 15 checklist shut down power to unit remove old unit install new unit check refrigerant lines document everythingedit_task{"title":"Replace broken HVAC unit","location":"lobby","category":"HVAC","assignee":"Mike","end_date":"2026-05-15","manpower":"6","cost":"15000","items":["shut down power to unit","remove old unit","install new unit","check refrigerant lines","document everything"]}
466new sprinkler heads need to go in on a201 mark it medium priority danny handles it by end of day wednesday budget around 15000 location room 305 category sprinkleredit_task{"title":"Install sprinkler heads","plan":"A201","location":"room 305","category":"sprinkler","assignee":"Danny","end_date":"2026-05-06","priority":"p2","cost":"15000"}
467put cost down as about 2500edit_task{"cost":"2500"}
468replace the broken plumbing fixture on s2 put danny on it make it medium priority by end of month team of 4 budget about 2500 checklist shut off water remove old fixture clean mounting surface install new fixture reconnect supply linesedit_task{"title":"Replace broken plumbing fixture","plan":"S-2","assignee":"Danny","end_date":"2026-05-29","priority":"p2","manpower":"4","cost":"2500","items":["shut off water","remove old fixture","clean mounting surface","install new fixture","reconnect supply lines"]}
469we're fixing the leak under the sink on civil sheet 3 in room 305 starting may 4 and wrapping thursday 10 workers on it cost around 2000 category plumbing lena is leading it checklist shut off water supply remove p trap inspect drain line replace gaskets reinstall p trap run water testedit_task{"title":"Fix water leak under sink","plan":"civil sheet 3","location":"room 305","category":"plumbing","assignee":"Lena","start_date":"2026-05-04","end_date":"2026-05-07","manpower":"10","cost":"2000","items":["shut off water supply","remove p-trap","inspect drain line","replace gaskets","reinstall p-trap","run water test"]}
470replace the broken glass panel on level 4 put tony on it have it wrapped by friday make it low priority checklist measure opening order replacement glass remove broken pane clean frame install new glass take a photo for the recordedit_task{"title":"Replace broken window glazing","location":"level 4","assignee":"Tony","end_date":"2026-05-08","priority":"p3","items":["measure opening","order replacement glass","remove broken pane","clean frame","install new glass","take a photo for the record"]}
471assign pat low priority cost about 800 and due by next fridayedit_task{"assignee":"Pat","end_date":"2026-05-15","priority":"p3","cost":"800"}
472start date is tomorrowedit_task{"start_date":"2026-05-06"}
473mobilize tomorrowedit_task{"start_date":"2026-05-06"}
474we're applying waterproofing membrane in stairwell a put troy on it have it wrapped by next friday make it high priority checklist clean substrate apply primer coat let cure apply first membrane coat let cure take a photo for the recordedit_task{"title":"Apply waterproofing membrane","location":"stairwell A","assignee":"Troy","end_date":"2026-05-15","priority":"p1","items":["clean substrate","apply primer coat","let cure","apply first membrane coat","let cure","take a photo for the record"]}
475put brenda and 3 workers on applying waterproofing membrane start may 3 and have it done by may 11edit_task{"title":"Apply waterproofing membrane","assignee":"Brenda","start_date":"2026-05-03","end_date":"2026-05-11","manpower":"3"}
476set the start date to this monday and the due date to fridayedit_task{"start_date":"2026-05-04","end_date":"2026-05-08"}
477we're running the electrical rough in on a201 on level 5 starting may 6 and wrapping thursday crew of 7 cost around 3500 category electrical jake is leading it checklist pull permits mark box locations per plan drill studs pull wire stub out boxes install panel roughedit_task{"title":"Run electrical rough-in","plan":"A201","location":"level 5","category":"electrical","assignee":"Jake","start_date":"2026-05-06","end_date":"2026-05-07","manpower":"7","cost":"3500","items":["pull permits","mark box locations per plan","drill studs","pull wire","stub out boxes","install panel rough"]}
478lena is taking the exterior paint job over at a301 budget around 800 mark it verifiededit_task{"title":"Paint exterior facade","plan":"A301","assignee":"Lena","status":"verified","cost":"800"}
479we're running the electrical rough in on p2 in the mechanical room starting this monday and wrapping before the owner review team of 2 cost 3500 category electrical lena is leading it checklist pull permits mark box locations per plan drill studs pull wire stub out boxes install panel roughedit_task{"title":"Run electrical rough-in","plan":"P-2","location":"mechanical room","category":"electrical","assignee":"Lena","start_date":"2026-05-04","end_date":"2026-05-10","manpower":"2","cost":"3500","items":["pull permits","mark box locations per plan","drill studs","pull wire","stub out boxes","install panel rough"]}
480start tomorrow finish by end of day wednesday put eddie on itedit_task{"assignee":"Eddie","start_date":"2026-05-06","end_date":"2026-05-06"}
481install the fire suppression heads on the ground floor start tomorrow wrap up by friday team of 9 cost 7000edit_task{"title":"Install sprinkler heads","plan":"ground floor","start_date":"2026-05-06","end_date":"2026-05-08","manpower":"9","cost":"7000"}
482move to a4 location grid line b2 and mark trackededit_task{"plan":"A-4","location":"grid line B2","status":"tracked"}
483set cost to around 3000 manpower to crew of 2 and category to electricaledit_task{"category":"electrical","manpower":"2","cost":"3000"}
484set cost to around 15000 and manpower to 6 workersedit_task{"manpower":"6","cost":"15000"}
485tony is taking the old hvac swap in unit 7 this is hvac work can wait done by friday manpower team of 10 budget 8000 mark openedit_task{"title":"Replace broken HVAC unit","location":"unit 7","category":"HVAC","assignee":"Tony","status":"open","end_date":"2026-05-08","priority":"p3","manpower":"10","cost":"8000"}
486set cost to about 12000 manpower to 5 workers and category to sprinkleredit_task{"category":"sprinkler","manpower":"5","cost":"12000"}
487steve is taking new carpet in the office over at e2 budget around 4000 mark it pending inspectionedit_task{"title":"Replace carpet in office","plan":"E-2","assignee":"Steve","status":"pending inspection","cost":"4000"}
488relabel this as fix hvac ductwork leakedit_task{"title":"Fix HVAC ductwork leak"}
489cost 12000 crew of 7 category waterproofing due by next fridayedit_task{"category":"waterproofing","end_date":"2026-05-15","manpower":"7","cost":"12000"}
490gotta get the bathroom tile in room 412 done by end of day wednesday make it low priorityedit_task{"title":"Install tile flooring","location":"room 412","end_date":"2026-05-06","priority":"p3"}
491we're installing low voltage cabling on m2 in the data center floor starting next tuesday 3 guys on it cost 1200 category low voltage carlos is leading it checklist pull permits if required route cable path drill penetrations pull cable terminate at patch panel test all runsedit_task{"title":"Install low voltage cabling","plan":"M2","location":"data center floor","category":"low voltage","assignee":"Carlos","start_date":"2026-05-12","manpower":"3","cost":"1200","items":["pull permits if required","route cable path","drill penetrations","pull cable","terminate at patch panel","test all runs"]}
492gotta get the busted window pane in grid line c4 replaced by end of month make it medium priorityedit_task{"title":"Replace broken window glazing","location":"grid line C4","end_date":"2026-05-29","priority":"p2"}
493call it put in fire alarm pull stationedit_task{"title":"Put in fire alarm pull station"}
494this one is the hvac unit replacement on the roof level at mechanical room level 3 make it medium priority omar handles it by may 6 budget around 8000 category hvacedit_task{"title":"Replace broken HVAC unit","plan":"roof level","location":"mechanical room level 3","category":"HVAC","assignee":"Omar","end_date":"2026-05-06","priority":"p2","cost":"8000"}
495start may 4 finish by next friday put maria on itedit_task{"assignee":"Maria","start_date":"2026-05-04","end_date":"2026-05-15"}
496start wednesday morning finish by thursday put brenda on itedit_task{"assignee":"Brenda","start_date":"2026-05-06","end_date":"2026-05-07"}
497set start date to tomorrow and due date to end of monthedit_task{"start_date":"2026-05-06","end_date":"2026-05-29"}
498there's a slow drip under the kitchen sink on fp3 at level 4 the gc wants it done by next tuesday put gus and a team of 10 on it budget around 6000 make it medium priority category plumbingedit_task{"title":"Fix water leak under sink","plan":"FP-3","location":"level 4","category":"plumbing","assignee":"Gus","end_date":"2026-05-12","priority":"p2","manpower":"10","cost":"6000"}
499there's a hole in the drywall ceiling assign that to ray low priority end of next week is fineedit_task{"title":"Patch drywall ceiling","assignee":"Ray","end_date":"2026-05-15","priority":"p3"}
500hector and his team of 8 are on waterproofing the deck in room 412 category waterproofing budget 5000 need it by may 6 checklist clean substrate apply primer coat let cure apply first membrane coat document everythingedit_task{"title":"Apply waterproofing membrane","location":"room 412","category":"waterproofing","assignee":"Hector","end_date":"2026-05-06","manpower":"8","cost":"5000","items":["clean substrate","apply primer coat","let cure","apply first membrane coat","document everything"]}
501we need the busted fixture in the bathroom replaced assign it to sal crew of 3 cost around 1500 start next tuesday and finish end of day wednesday checklist shut off water remove old fixture clean mounting surface install new fixture final walkthrough with the gcedit_task{"title":"Replace broken plumbing fixture","location":"bathroom","assignee":"Sal","start_date":"2026-05-12","end_date":"2026-05-13","manpower":"3","cost":"1500","items":["shut off water","remove old fixture","clean mounting surface","install new fixture","final walkthrough with the GC"]}
502install ceiling grid and tiles on a301 put ray on it make it medium priority by end of next week team of 6 budget about 1500 checklist snap layout lines install wall angle hang main tees install cross tees cut perimeter tilesedit_task{"title":"Install ceiling grid and tiles","plan":"A301","assignee":"Ray","end_date":"2026-05-15","priority":"p2","manpower":"6","cost":"1500","items":["snap layout lines","install wall angle","hang main tees","install cross tees","cut perimeter tiles"]}
503flip it to trackededit_task{"status":"tracked"}
504set category to waterproofingedit_task{"category":"waterproofing"}
505bump this to high priorityedit_task{"priority":"p1"}
506mark this needs review it's installing the fire suppression heads in the data center flooredit_task{"title":"Install sprinkler heads","location":"data center floor","status":"needs review"}
507have felix take care of itedit_task{"assignee":"Felix"}
508relabel this as repair roof membraneedit_task{"title":"Repair roof membrane"}
509the roof membrane has a leak on s2 start wednesday morning wrap up by end of day wednesday need 5 guys cost around 6000edit_task{"title":"Repair roof membrane","plan":"S-2","start_date":"2026-05-06","end_date":"2026-05-06","manpower":"5","cost":"6000"}
510the exhaust fan needs replacing on s2 start next tuesday wrap up next tuesday crew of 4 cost about 5000edit_task{"title":"Replace exhaust fan","plan":"S-2","start_date":"2026-05-12","end_date":"2026-05-12","manpower":"4","cost":"5000"}
511move to a201 location data center floor and mark pending inspectionedit_task{"plan":"A201","location":"data center floor","status":"pending inspection"}
512update status to needs reviewedit_task{"status":"needs review"}
513patch the drywall ceiling on p2 put bobby on it make it medium priority by end of month 3 guys budget about 12000 checklist cut out damaged section install backing hang new drywall tape and mud sand smoothedit_task{"title":"Patch drywall ceiling","plan":"P-2","assignee":"Bobby","end_date":"2026-05-29","priority":"p2","manpower":"3","cost":"12000","items":["cut out damaged section","install backing","hang new drywall","tape and mud","sand smooth"]}
514we're replacing the fire alarm pull station in unit 7 on p3 the gc wants it done before the walkthrough put hector and a team of 6 on it budget about 1500 make it top priority category fire alarmedit_task{"title":"Install fire alarm pull station","plan":"P-3","location":"unit 7","category":"fire alarm","assignee":"Hector","end_date":"2026-05-15","priority":"p1","manpower":"6","cost":"1500"}
515assign gus cost 2000 and bump it to high priorityedit_task{"assignee":"Gus","priority":"p1","cost":"2000"}
516we're scheduling cracked concrete repair for room 201 on a301 need 6 guys starting tomorrow through thursday ballpark cost around 20000edit_task{"title":"Repair cracked concrete","plan":"A301","location":"room 201","start_date":"2026-05-06","end_date":"2026-05-07","manpower":"6","cost":"20000"}
517steve is taking the data and av cabling on a202 budget 2000 mark it on holdedit_task{"title":"Install low voltage cabling","plan":"A202","assignee":"Steve","status":"on hold","cost":"2000"}
518tag urgent and safetyedit_task{"tags":["urgent","safety"]}
519put zack and a crew of 8 on the hvac ductwork leak start next tuesday and have it done by next fridayedit_task{"title":"Fix HVAC ductwork leak","assignee":"Zack","start_date":"2026-05-12","end_date":"2026-05-15","manpower":"8"}
520we're installing sprinkler heads on the mezzanine at stairwell a starting may 2 and wrapping next friday team of 3 cost 800 category sprinkler carlos is leading it checklist confirm pipe layout with plan drill ceiling openings install drops attach heads pressure test inspector sign offedit_task{"title":"Install sprinkler heads","plan":"mezzanine","location":"stairwell A","category":"sprinkler","assignee":"Carlos","start_date":"2026-05-02","end_date":"2026-05-15","manpower":"3","cost":"800","items":["confirm pipe layout with plan","drill ceiling openings","install drops","attach heads","pressure test","inspector sign-off"]}
521we need attic insulation in the main lobby put felix on it have it wrapped by next tuesday make it low priority checklist check existing r value seal air leaks install baffles at eaves blow insulation to target depth verify depth with ruler take a photo for the recordedit_task{"title":"Insulate attic space","location":"main lobby","assignee":"Felix","end_date":"2026-05-12","priority":"p3","items":["check existing R-value","seal air leaks","install baffles at eaves","blow insulation to target depth","verify depth with ruler","take a photo for the record"]}
522close out by end of monthedit_task{"end_date":"2026-05-29"}
523sal and his team of 9 are on the exterior caulking failure in suite 101 category waterproofing budget 4000 need it by next tuesday checklist remove old caulk clean and dry joint apply backer rod apply caulk bead document everythingedit_task{"title":"Install exterior caulking","location":"suite 101","category":"waterproofing","assignee":"Sal","end_date":"2026-05-12","manpower":"9","cost":"4000","items":["remove old caulk","clean and dry joint","apply backer rod","apply caulk bead","document everything"]}
524belongs on plumbing p4edit_task{"plan":"plumbing P4"}
525this one is a new partition wall on plumbing p4 mark it medium maria handles it by next tuesday budget around 3500 location bay 4 category framingedit_task{"title":"Frame new partition wall","plan":"plumbing P4","location":"bay 4","category":"framing","assignee":"Maria","end_date":"2026-05-12","priority":"p2","cost":"3500"}
526this is low voltage cabling in the mechanical room on a201 mark it needs review ray is handling it due by next friday checklist pull permits if required route cable path drill penetrations sign offedit_task{"title":"Install low voltage cabling","plan":"A201","location":"mechanical room","assignee":"Ray","status":"needs review","end_date":"2026-05-15","items":["pull permits if required","route cable path","drill penetrations","sign off"]}
527gotta get the exhaust fan replaced by end of month just one guy should be enough make it high priority and assign steveedit_task{"title":"Replace exhaust fan","assignee":"Steve","end_date":"2026-05-29","priority":"p1","manpower":"1"}
528we need that hole in the drywall ceiling fixed assign it to hector crew of 3 cost around 2000 start this monday and finish thursday checklist cut out damaged section install backing hang new drywall tape and mud final walkthrough with the gcedit_task{"title":"Patch drywall ceiling","assignee":"Hector","start_date":"2026-05-04","end_date":"2026-05-07","manpower":"3","cost":"2000","items":["cut out damaged section","install backing","hang new drywall","tape and mud","final walkthrough with the GC"]}
529get it done by may 16edit_task{"end_date":"2026-05-16"}
530estimate is 6000edit_task{"cost":"6000"}
531got a leak under the sink on s2 starts may 6 wraps up by next tuesday team of 3 cost around 2500edit_task{"title":"Fix water leak under sink","plan":"S-2","start_date":"2026-05-06","end_date":"2026-05-12","manpower":"3","cost":"2500"}
532ray and his 8 workers are on recessed lights in the data center floor category electrical budget 10000 need it by thursday checklist run romex to junction box mount the housing cans connect wiring install trim rings document everythingedit_task{"title":"Install recessed lighting","location":"data center floor","category":"electrical","assignee":"Ray","end_date":"2026-05-07","manpower":"8","cost":"10000","items":["run romex to junction box","mount the housing cans","connect wiring","install trim rings","document everything"]}
533we're applying waterproofing membrane on the roof level in unit 23 starting may 3 and wrapping may 8 team of 6 cost 2000 category waterproofing nadia is leading it checklist clean substrate apply primer coat let cure apply first membrane coat let cure apply second coatedit_task{"title":"Apply waterproofing membrane","plan":"roof level","location":"unit 23","category":"waterproofing","assignee":"Nadia","start_date":"2026-05-03","end_date":"2026-05-08","manpower":"6","cost":"2000","items":["clean substrate","apply primer coat","let cure","apply first membrane coat","let cure","apply second coat"]}
534put ray and a crew of 8 on tearing down the partition wall start may 2 and have it done by may 10edit_task{"title":"Demolish interior partition","assignee":"Ray","start_date":"2026-05-02","end_date":"2026-05-10","manpower":"8"}
535this is patching the roof membrane in the basement on a301 bump it to high priority due by end of day wednesdayedit_task{"title":"Repair roof membrane","plan":"A301","location":"basement","end_date":"2026-05-06","priority":"p1"}
536we need new sprinkler heads installed assign it to hector crew of 3 cost around 7000 start may 2 and finish may 7 checklist confirm pipe layout with plan drill ceiling openings install drops attach heads final walkthrough with the gcedit_task{"title":"Install sprinkler heads","assignee":"Hector","start_date":"2026-05-02","end_date":"2026-05-07","manpower":"3","cost":"7000","items":["confirm pipe layout with plan","drill ceiling openings","install drops","attach heads","final walkthrough with the GC"]}
537due next tuesdayedit_task{"end_date":"2026-05-12"}
538we need attic insulation blown in assign it to sal crew of 2 cost around 3000 start may 4 and finish may 21 checklist check existing r value seal air leaks install baffles at eaves blow insulation to target depth final walkthrough with the gcedit_task{"title":"Insulate attic space","assignee":"Sal","start_date":"2026-05-04","end_date":"2026-05-21","manpower":"2","cost":"3000","items":["check existing R-value","seal air leaks","install baffles at eaves","blow insulation to target depth","final walkthrough with the GC"]}
539this is a broken exhaust fan in the bathroom in the main lobby on a201 mark it pending inspection nadia is handling it due by friday checklist shut off circuit at panel remove old fan install new housing take finished photoedit_task{"title":"Replace exhaust fan","plan":"A201","location":"main lobby bathroom","assignee":"Nadia","status":"pending inspection","end_date":"2026-05-08","items":["shut off circuit at panel","remove old fan","install new housing","take finished photo"]}
540opening day is tomorrowedit_task{"start_date":"2026-05-06"}
541we're installing sprinkler heads on structural s2 in the loading dock starting may 3 and wrapping before the inspection 4 guys on it cost 10000 category sprinkler bobby is leading it checklist confirm pipe layout with plan drill ceiling openings install drops attach heads pressure test inspector sign offedit_task{"title":"Install sprinkler heads","plan":"structural S2","location":"loading dock","category":"sprinkler","assignee":"Bobby","start_date":"2026-05-03","end_date":"2026-05-14","manpower":"4","cost":"10000","items":["confirm pipe layout with plan","drill ceiling openings","install drops","attach heads","pressure test","inspector sign-off"]}
542we're installing data and av cabling on a202 omar is on this make it top priority before the inspectionedit_task{"title":"Install low voltage cabling","plan":"A202","assignee":"Omar","end_date":"2026-05-14","priority":"p1"}
543we need the ceiling drywall patched assign it to danny crew of 2 cost around 10000 start wednesday morning and finish friday checklist cut out damaged section install backing hang new drywall tape and mud final walkthrough with the gcedit_task{"title":"Patch drywall ceiling","assignee":"Danny","start_date":"2026-05-06","end_date":"2026-05-08","manpower":"2","cost":"10000","items":["cut out damaged section","install backing","hang new drywall","tape and mud","final walkthrough with the GC"]}
544mark this pending inspection there's a hole in the drywall ceiling in suite 3bedit_task{"title":"Patch drywall ceiling","location":"suite 3B","status":"pending inspection"}
545this one is recaulking the facade joints on a201 mark it low priority juan handles it before the gc walkthrough budget around 4000 location loading dock category waterproofingedit_task{"title":"Install exterior caulking","plan":"A201","location":"loading dock","category":"waterproofing","assignee":"Juan","end_date":"2026-05-13","priority":"p3","cost":"4000"}
546danny is taking the waterproofing membrane on a deck on a4 budget around 3500 mark it verifiededit_task{"title":"Apply waterproofing membrane","plan":"A-4","assignee":"Danny","status":"verified","cost":"3500"}
547cost 12000 crew of 7 category carpentry due by end of day wednesdayedit_task{"category":"carpentry","end_date":"2026-05-06","manpower":"7","cost":"12000"}
548drawing mep1 location unit 7 category tile and assign juanedit_task{"plan":"MEP-1","location":"unit 7","category":"tile","assignee":"Juan"}
549this one is sprinkler heads on sheet 9 mark it high priority juan handles it before the gc walkthrough budget around 1500 location mezzanine category sprinkleredit_task{"title":"Install sprinkler heads","plan":"Sheet 9","location":"mezzanine","category":"sprinkler","assignee":"Juan","end_date":"2026-05-13","priority":"p1","cost":"1500"}
550category framing drawing mep1 and set status to trackededit_task{"plan":"MEP-1","category":"framing","status":"tracked"}
551troy is taking the low voltage pull above the ceiling over at a3 budget 2500 mark it openedit_task{"title":"Install low voltage cabling","plan":"A-3","assignee":"Troy","status":"open","cost":"2500"}
552there's a hole in the drywall ceiling in stairwell a on a3 the gc wants it done by friday put mike and 10 workers on it budget 6000 make it high priority this is drywalledit_task{"title":"Patch drywall ceiling","plan":"A-3","location":"stairwell A","category":"drywall","assignee":"Mike","end_date":"2026-05-08","priority":"p1","manpower":"10","cost":"6000"}
553patch the drywall ceiling on mep1 put nadia on it make it high priority by end of month team of 8 budget about 7000 checklist cut out damaged section install backing hang new drywall tape and mud sand smoothedit_task{"title":"Patch drywall ceiling","plan":"MEP-1","assignee":"Nadia","end_date":"2026-05-29","priority":"p1","manpower":"8","cost":"7000","items":["cut out damaged section","install backing","hang new drywall","tape and mud","sand smooth"]}
554eddie is taking the slow drip under the kitchen sink on the roof deck this is plumbing work critical done by next tuesday manpower team of 5 budget 5000 mark needs reviewedit_task{"title":"Fix water leak under sink","location":"roof deck","category":"plumbing","assignee":"Eddie","status":"needs review","end_date":"2026-05-12","priority":"p1","manpower":"5","cost":"5000"}
555bobby and his crew of 2 are on the electrical rough in for the new space in the west wing category electrical budget 2500 need it by end of day wednesday checklist pull permits mark box locations per plan drill studs pull wire document everythingedit_task{"title":"Run electrical rough-in","location":"west wing","category":"electrical","assignee":"Bobby","end_date":"2026-05-06","manpower":"2","cost":"2500","items":["pull permits","mark box locations per plan","drill studs","pull wire","document everything"]}
556mike is taking the broken window pane replacement in the mezzanine this is glazing work high priority done by friday manpower team of 9 budget 12000 mark in progressedit_task{"title":"Replace broken window glazing","location":"mezzanine","category":"glazing","assignee":"Mike","status":"in progress","end_date":"2026-05-08","priority":"p1","manpower":"9","cost":"12000"}
557reza and his crew of 2 are on the cracked window glazing in basement level 2 category glazing budget 800 need it by end of month checklist measure opening order replacement glass remove broken pane clean frame document everythingedit_task{"title":"Replace broken window glazing","location":"basement level 2","category":"glazing","assignee":"Reza","end_date":"2026-05-29","manpower":"2","cost":"800","items":["measure opening","order replacement glass","remove broken pane","clean frame","document everything"]}
558move to s2 location suite 3b and mark in progressedit_task{"plan":"S-2","location":"suite 3B","status":"in progress"}
559assign ray cost around 12000 and bump it to high priorityedit_task{"assignee":"Ray","priority":"p1","cost":"12000"}
560escalate to not urgent but soonedit_task{"priority":"p2"}
561this is tile flooring in the bathroom in elevator shaft b on e1 mark it high priority due by may 5edit_task{"title":"Install tile flooring","plan":"E1","location":"elevator shaft B","end_date":"2026-05-05","priority":"p1"}
562put two guys on itedit_task{"manpower":"2"}
563we're pouring the concrete slab on sheet 9 in suite 101 starting this monday and wrapping thursday crew of 4 cost about 15000 category concrete kim is leading it checklist set forms place rebar order concrete pour slab screed and float apply curing compoundedit_task{"title":"Pour concrete slab","plan":"Sheet 9","location":"suite 101","category":"concrete","assignee":"Kim","start_date":"2026-05-04","end_date":"2026-05-07","manpower":"4","cost":"15000","items":["set forms","place rebar","order concrete","pour slab","screed and float","apply curing compound"]}
564put eddie on itedit_task{"assignee":"Eddie"}
565fix the hvac ductwork leak on structural s2 put hector on it low priority by end of next week 3 guys budget about 7000 checklist locate all leak points clean duct surface apply mastic sealant wrap with foil tape reinsulate if needededit_task{"title":"Fix HVAC ductwork leak","plan":"structural S2","assignee":"Hector","end_date":"2026-05-15","priority":"p3","manpower":"3","cost":"7000","items":["locate all leak points","clean duct surface","apply mastic sealant","wrap with foil tape","re-insulate if needed"]}
566priority needs to be criticaledit_task{"priority":"p1"}
567this is recessed lighting in break room floor 2 on p3 bump it to high priority due by end of day wednesdayedit_task{"title":"Install recessed lighting","plan":"P-3","location":"break room floor 2","end_date":"2026-05-06","priority":"p1"}
568ceiling tile system going in on a301 starts may 3 wraps up by end of day wednesday 6 workers on the crew cost around 5000edit_task{"title":"Install ceiling grid and tiles","plan":"A301","start_date":"2026-05-03","end_date":"2026-05-06","manpower":"6","cost":"5000"}
569there's a slow drip under the kitchen sink assign that to sal low priority end of next week is fineedit_task{"title":"Fix water leak under sink","assignee":"Sal","end_date":"2026-05-15","priority":"p3"}
570this falls under glazingedit_task{"category":"glazing"}
571this one is caulking around the windows on a301 mark it high priority gus handles it before the inspection budget around 2500 location penthouse level category waterproofingedit_task{"title":"Install exterior caulking","plan":"A301","location":"penthouse level","category":"waterproofing","assignee":"Gus","end_date":"2026-05-15","priority":"p1","cost":"2500"}
572we're fixing the electrical panel on structural s2 in the east lobby starting may 4 and wrapping may 9 team of 5 cost 800 category electrical danny is leading it checklist identify tripped breaker check load on circuit inspect wiring connections replace breaker if faulty test under load document findingsedit_task{"title":"Fix electrical panel issue","plan":"structural S2","location":"east lobby","category":"electrical","assignee":"Danny","start_date":"2026-05-04","end_date":"2026-05-09","manpower":"5","cost":"800","items":["identify tripped breaker","check load on circuit","inspect wiring connections","replace breaker if faulty","test under load","document findings"]}
573set start date to wednesday morning and due date to may 6edit_task{"start_date":"2026-05-06","end_date":"2026-05-06"}
574bill it at 4000edit_task{"cost":"4000"}
575we're insulating the attic on the roof level in suite 101 starting next tuesday and wrapping end of day wednesday crew of 7 cost 3500 category insulation reza is leading it checklist check existing r value seal air leaks install baffles at eaves blow insulation to target depth verify depth with ruler take documentation photosedit_task{"title":"Insulate attic space","plan":"roof level","location":"suite 101","category":"insulation","assignee":"Reza","start_date":"2026-05-12","end_date":"2026-05-13","manpower":"7","cost":"3500","items":["check existing R-value","seal air leaks","install baffles at eaves","blow insulation to target depth","verify depth with ruler","take documentation photos"]}
576it's waterproofingedit_task{"category":"waterproofing"}
577this goes on sheet 7edit_task{"plan":"Sheet 7"}
578we've got attic insulation in break room floor 2 put eddie on it have it wrapped by next tuesday make it medium priority checklist check existing r value seal air leaks install baffles at eaves blow insulation to target depth verify depth with ruler take a photo for the recordedit_task{"title":"Insulate attic space","location":"break room floor 2","assignee":"Eddie","end_date":"2026-05-12","priority":"p2","items":["check existing R-value","seal air leaks","install baffles at eaves","blow insulation to target depth","verify depth with ruler","take a photo for the record"]}
579we're looking at 1200 for thisedit_task{"cost":"1200"}
580move this to c1 and set the location to north corridoredit_task{"plan":"C-1","location":"north corridor"}
581close it out as needs reviewedit_task{"status":"needs review"}
5827 guys on this oneedit_task{"manpower":"7"}
583gotta get the roof membrane patched in the mechanical room by end of day wednesday make it low priorityedit_task{"title":"Repair roof membrane","location":"mechanical room","end_date":"2026-05-06","priority":"p3"}
584set cost to around 8000 manpower to team of 3 and category to framingedit_task{"category":"framing","manpower":"3","cost":"8000"}
585exhaust fan needs replacing in room 412 put kim on that make it urgent get it done by next fridayedit_task{"title":"Replace exhaust fan","location":"room 412","assignee":"Kim","end_date":"2026-05-15","priority":"p1"}
586this is a cracked concrete slab in the loading dock on fp3 mark it needs review ray is handling it due by may 5 checklist rout crack to proper width blow out dust apply bond breaker if needed documentedit_task{"title":"Repair cracked concrete","plan":"FP-3","location":"loading dock","assignee":"Ray","status":"needs review","end_date":"2026-05-05","items":["rout crack to proper width","blow out dust","apply bond breaker if needed","document"]}
587move to a202 location elevator shaft b and mark verifiededit_task{"plan":"A202","location":"elevator shaft B","status":"verified"}
588drawing e1 location east lobby category concrete and assign brendaedit_task{"plan":"E1","location":"east lobby","category":"concrete","assignee":"Brenda"}
589we're running rough in wiring on structural s2 steve is on this make it low priority by may 20edit_task{"title":"Run electrical rough-in","plan":"structural S2","assignee":"Steve","end_date":"2026-05-20","priority":"p3"}
590set start to may 5edit_task{"start_date":"2026-05-05"}
591new carpet is going into the office in break room floor 2 put tony on it make it high priority get it done before the owner reviewedit_task{"title":"Replace carpet in office","location":"break room floor 2","assignee":"Tony","end_date":"2026-05-15","priority":"p1"}
592we need new sprinkler heads run assign it to danny crew of 3 cost around 10000 start this monday and finish end of day wednesday checklist confirm pipe layout with plan drill ceiling openings install drops attach heads final walkthrough with the gcedit_task{"title":"Install sprinkler heads","assignee":"Danny","start_date":"2026-05-04","end_date":"2026-05-06","manpower":"3","cost":"10000","items":["confirm pipe layout with plan","drill ceiling openings","install drops","attach heads","final walkthrough with the GC"]}
593we've got a slab pour assign that to vic low priority end of next week is fineedit_task{"title":"Pour concrete slab","assignee":"Vic","end_date":"2026-05-15","priority":"p3"}
594carlos and his team of 9 are on the slab pour in the basement category concrete budget 800 need it by next friday checklist set forms place rebar order concrete pour slab document everythingedit_task{"title":"Pour concrete slab","location":"basement","category":"concrete","assignee":"Carlos","end_date":"2026-05-15","manpower":"9","cost":"800","items":["set forms","place rebar","order concrete","pour slab","document everything"]}
595send a team of 8 overedit_task{"manpower":"8"}
596bump it to high priority and push the deadline to thursdayedit_task{"end_date":"2026-05-07","priority":"p1"}
597replace the broken faucet on fp3 start may 5 wrap up by friday 6 workers on the crew cost about 7000edit_task{"title":"Replace broken plumbing fixture","plan":"FP-3","start_date":"2026-05-05","end_date":"2026-05-08","manpower":"6","cost":"7000"}
598mark it on holdedit_task{"status":"on hold"}
599gotta get the floor tile installed by thursday team of 10 should be enough make it top priority and assign mikeedit_task{"title":"Install tile flooring","assignee":"Mike","end_date":"2026-05-07","priority":"p1","manpower":"10"}
600budget is 8000 and category is sprinkleredit_task{"category":"sprinkler","cost":"8000"}
601carlos is taking the facade joint recaulk on m3 budget 10000 mark it openedit_task{"title":"Install exterior caulking","plan":"M-3","assignee":"Carlos","status":"open","cost":"10000"}
602new pull station install in the server room budget about 1200 assign patedit_task{"title":"Install fire alarm pull station","location":"server room","assignee":"Pat","cost":"1200"}
603we're installing sprinkler heads on the mezzanine in elevator shaft b starting next tuesday team of 3 on it cost around 15000 category sprinkler lena is leading it checklist confirm pipe layout with plan drill ceiling openings install drops attach heads pressure test inspector sign offedit_task{"title":"Install sprinkler heads","plan":"mezzanine","location":"elevator shaft B","category":"sprinkler","assignee":"Lena","start_date":"2026-05-12","manpower":"3","cost":"15000","items":["confirm pipe layout with plan","drill ceiling openings","install drops","attach heads","pressure test","inspector sign-off"]}
604move to p2 location exterior facade east and mark trackededit_task{"plan":"P-2","location":"exterior facade east","status":"tracked"}
605set cost to 15000 manpower to crew of 3 and category to tileedit_task{"category":"tile","manpower":"3","cost":"15000"}
606push the due date to next tuesdayedit_task{"end_date":"2026-05-12"}
607install fire alarm pull station on e1 put pat on it make it medium priority by end of month 4 workers budget about 3000 checklist shut off fire alarm circuit remove old device run new conduit if needed mount backbox wire new deviceedit_task{"title":"Install fire alarm pull station","plan":"E1","assignee":"Pat","end_date":"2026-05-29","priority":"p2","manpower":"4","cost":"3000","items":["shut off fire alarm circuit","remove old device","run new conduit if needed","mount backbox","wire new device"]}
608set priority top priority location boiler room cost about 20000edit_task{"location":"boiler room","priority":"p1","cost":"20000"}
609set cost to 1500 manpower to crew of 6 and category to plumbingedit_task{"category":"plumbing","manpower":"6","cost":"1500"}
610rename this to install tile flooringedit_task{"title":"install tile flooring"}
611sal is taking the partition wall demo on s1 budget about 10000 mark it in progressedit_task{"title":"Demolish interior partition","plan":"S-1","assignee":"Sal","status":"in progress","cost":"10000"}
612we need the broken glass panel replaced assign it to mike crew of 2 cost around 2000 start may 4 and finish end of month checklist measure opening order replacement glass remove broken pane clean frame final walkthrough with the gcedit_task{"title":"Replace broken window glazing","assignee":"Mike","start_date":"2026-05-04","end_date":"2026-05-29","manpower":"2","cost":"2000","items":["measure opening","order replacement glass","remove broken pane","clean frame","final walkthrough with the GC"]}
613we've got sprinkler heads to run assign that to brenda low priority end of next week is fineedit_task{"title":"Install sprinkler heads","assignee":"Brenda","end_date":"2026-05-15","priority":"p3"}
614gotta get the partition wall demo done before the owner review 2 workers should be enough make it high priority and assign kimedit_task{"title":"Demolish interior partition","assignee":"Kim","end_date":"2026-05-15","priority":"p1","manpower":"2"}
615we're insulating the attic on a201 in the server room starting tomorrow and wrapping next tuesday team of 5 cost 6000 category insulation steve is leading it checklist check existing r value seal air leaks install baffles at eaves blow insulation to target depth verify depth with ruler take documentation photosedit_task{"title":"Insulate attic space","plan":"A201","location":"server room","category":"insulation","assignee":"Steve","start_date":"2026-05-06","end_date":"2026-05-12","manpower":"5","cost":"6000","items":["check existing R-value","seal air leaks","install baffles at eaves","blow insulation to target depth","verify depth with ruler","take documentation photos"]}
616we're replacing the broken window glazing on p2 in bay 4 starting tomorrow and wrapping may 7 5 workers on it cost about 800 category glazing kim is leading it checklist measure opening order replacement glass remove broken pane clean frame install new glass apply glazing compoundedit_task{"title":"Replace broken window glazing","plan":"P-2","location":"bay 4","category":"glazing","assignee":"Kim","start_date":"2026-05-06","end_date":"2026-05-07","manpower":"5","cost":"800","items":["measure opening","order replacement glass","remove broken pane","clean frame","install new glass","apply glazing compound"]}
617fix electrical panel issue on a101 put danny on it low priority by end of next week 8 guys budget about 6000 checklist identify tripped breaker check load on circuit inspect wiring connections replace breaker if faulty test under loadedit_task{"title":"Fix electrical panel issue","plan":"A101","assignee":"Danny","end_date":"2026-05-15","priority":"p3","manpower":"8","cost":"6000","items":["identify tripped breaker","check load on circuit","inspect wiring connections","replace breaker if faulty","test under load"]}
618we're pouring the concrete slab on id101 in bay 4 starting wednesday morning and wrapping next friday 5 guys on it cost 2000 category concrete zack is leading it checklist set forms place rebar order concrete pour slab screed and float apply curing compoundedit_task{"title":"Pour concrete slab","plan":"ID-101","location":"bay 4","category":"concrete","assignee":"Zack","start_date":"2026-05-06","end_date":"2026-05-15","manpower":"5","cost":"2000","items":["set forms","place rebar","order concrete","pour slab","screed and float","apply curing compound"]}
619we're applying waterproofing membrane on a101 in the courtyard starting this monday and wrapping before the inspection team of 8 cost about 2500 category waterproofing omar is leading it checklist clean substrate apply primer coat let cure apply first membrane coat let cure apply second coatedit_task{"title":"Apply waterproofing membrane","plan":"A101","location":"courtyard","category":"waterproofing","assignee":"Omar","start_date":"2026-05-04","end_date":"2026-05-15","manpower":"8","cost":"2500","items":["clean substrate","apply primer coat","let cure","apply first membrane coat","let cure","apply second coat"]}
620we've got a foundation pour in the basement put omar on it make it medium priority have it wrapped by next friday checklist set forms place rebar order concrete pour slab screed and float take a photo for the recordedit_task{"title":"Pour concrete slab","location":"basement","assignee":"Omar","end_date":"2026-05-15","priority":"p2","items":["set forms","place rebar","order concrete","pour slab","screed and float","take a photo for the record"]}
621invoice will be about 10000edit_task{"cost":"10000"}
622we've got shower pan waterproofing in elevator shaft b put dave on it have it wrapped by friday make it low priority checklist clean substrate apply primer coat let cure apply first membrane coat let cure take a photo for the recordedit_task{"title":"Apply waterproofing membrane","location":"elevator shaft B","assignee":"Dave","end_date":"2026-05-08","priority":"p3","items":["clean substrate","apply primer coat","let cure","apply first membrane coat","let cure","take a photo for the record"]}
623trade is paintingedit_task{"category":"painting"}
624we've got a broken glass panel in stairwell b put nadia on it have it done by thursday make it urgent checklist measure opening order replacement glass remove broken pane clean frame install new glass take a photo for the recordedit_task{"title":"Replace broken window glazing","location":"stairwell B","assignee":"Nadia","end_date":"2026-05-07","priority":"p1","items":["measure opening","order replacement glass","remove broken pane","clean frame","install new glass","take a photo for the record"]}
625bump it to low priority and push the deadline to next tuesdayedit_task{"end_date":"2026-05-12","priority":"p3"}
626kick off this mondayedit_task{"start_date":"2026-05-04"}
627gotta get the attic insulation blown in by next tuesday team of 2 should be enough make it high priority and assign troyedit_task{"title":"Insulate attic space","assignee":"Troy","end_date":"2026-05-12","priority":"p1","manpower":"2"}
628we're installing the ceiling grid and tiles on structural s2 in parking garage level 1 starting this monday and wrapping next tuesday crew of 9 cost around 2500 category drywall steve is leading it checklist snap layout lines install wall angle hang main tees install cross tees cut perimeter tiles drop in field tilesedit_task{"title":"Install ceiling grid and tiles","plan":"structural S2","location":"parking garage level 1","category":"drywall","assignee":"Steve","start_date":"2026-05-04","end_date":"2026-05-12","manpower":"9","cost":"2500","items":["snap layout lines","install wall angle","hang main tees","install cross tees","cut perimeter tiles","drop in field tiles"]}
629we're installing tile flooring on m3 in bay 12 starting tomorrow and wrapping end of day wednesday team of 4 cost 3500 category tile sal is leading it checklist demo old flooring level subfloor apply thinset mortar lay tile to pattern cut edge tiles groutedit_task{"title":"Install tile flooring","plan":"M-3","location":"bay 12","category":"tile","assignee":"Sal","start_date":"2026-05-06","end_date":"2026-05-06","manpower":"4","cost":"3500","items":["demo old flooring","level subfloor","apply thinset mortar","lay tile to pattern","cut edge tiles","grout"]}
630put luis and 9 workers on the low voltage pull above the ceiling start wednesday morning and have it done by may 18edit_task{"title":"Install low voltage cabling","assignee":"Luis","start_date":"2026-05-06","end_date":"2026-05-18","manpower":"9"}
631we've got water leaking from the pipes under the sink in the loading dock on fp2 the gc wants it done by thursday put juan and a team of 1 on it budget about 7000 make it low priority category plumbingedit_task{"title":"Fix water leak under sink","plan":"FP-2","location":"loading dock","category":"plumbing","assignee":"Juan","end_date":"2026-05-07","priority":"p3","manpower":"1","cost":"7000"}
632maria and her team of 9 are on the exhaust fan swap in bay 12 category mechanical budget around 6000 need it by friday checklist shut off circuit at panel remove old fan install new housing wire new fan document everythingedit_task{"title":"Replace exhaust fan","location":"bay 12","category":"mechanical","assignee":"Maria","end_date":"2026-05-08","manpower":"9","cost":"6000","items":["shut off circuit at panel","remove old fan","install new housing","wire new fan","document everything"]}
633change category to tile and mark it in progressedit_task{"category":"tile","status":"in progress"}
634first day on this is next tuesdayedit_task{"start_date":"2026-05-12"}
635get it done by may 5edit_task{"end_date":"2026-05-05"}
636we've got the old partition demo in the pool deck put zack on it have it wrapped by end of month make it medium priority checklist verify no electrical or plumbing in wall shut off circuits remove door strip drywall cut studs take a photo for the recordedit_task{"title":"Demolish interior partition","location":"pool deck","assignee":"Zack","end_date":"2026-05-29","priority":"p2","items":["verify no electrical or plumbing in wall","shut off circuits","remove door","strip drywall","cut studs","take a photo for the record"]}
637dave is taking the water leak under the sink in the courtyard this is plumbing work medium priority done by end of day wednesday manpower crew of 7 budget 800 mark trackededit_task{"title":"Fix water leak under sink","location":"courtyard","category":"plumbing","assignee":"Dave","status":"tracked","end_date":"2026-05-06","priority":"p2","manpower":"7","cost":"800"}
638assign omar set priority to low and due by may 15edit_task{"assignee":"Omar","end_date":"2026-05-15","priority":"p3"}
639we're repairing cracked concrete on s2 in the cafeteria starting next tuesday and wrapping next friday team of 1 cost 4000 category concrete nadia is leading it checklist rout crack to proper width blow out dust apply bond breaker if needed fill with epoxy inject grind flush after cure apply surface sealeredit_task{"title":"Repair cracked concrete","plan":"S-2","location":"cafeteria","category":"concrete","assignee":"Nadia","start_date":"2026-05-12","end_date":"2026-05-15","manpower":"1","cost":"4000","items":["rout crack to proper width","blow out dust","apply bond breaker if needed","fill with epoxy inject","grind flush after cure","apply surface sealer"]}
640we've got a leak under the sink assign it to luis crew of 2 cost around 15000 start tomorrow and finish thursday checklist shut off water supply remove p trap inspect drain line replace gaskets final walkthrough with the gcedit_task{"title":"Fix water leak under sink","assignee":"Luis","start_date":"2026-05-06","end_date":"2026-05-07","manpower":"2","cost":"15000","items":["shut off water supply","remove p-trap","inspect drain line","replace gaskets","final walkthrough with the GC"]}
641category structural drawing a3 and set status to on holdedit_task{"plan":"A-3","category":"structural","status":"on hold"}
642need a new partition framed in penthouse level put tony on it should be done by may 7 cost around 2000edit_task{"title":"Frame new partition wall","location":"penthouse level","assignee":"Tony","end_date":"2026-05-07","cost":"2000"}
643put pat and a team of 7 on the busted fixture in the bathroom start next tuesday and finish end of day wednesdayedit_task{"title":"Replace broken plumbing fixture","location":"bathroom","assignee":"Pat","start_date":"2026-05-12","end_date":"2026-05-13","manpower":"7"}
644move to e4 location suite 3b and mark trackededit_task{"plan":"E4","location":"suite 3B","status":"tracked"}
645this is replacing the fire alarm pull station in the loading dock on p3 make it medium priority due before the owner reviewedit_task{"title":"Install fire alarm pull station","plan":"P-3","location":"loading dock","end_date":"2026-05-14","priority":"p2"}
646this is on civil sheet 3edit_task{"plan":"civil sheet 3"}
647this is a panel with a tripped breaker in the east wing on sheet 4 mark it closed maria is handling it due before the owner review checklist identify tripped breaker check load on circuit inspect wiring connections document findingsedit_task{"title":"Fix electrical panel issue","plan":"Sheet 4","location":"east wing","assignee":"Maria","status":"closed","end_date":"2026-05-09","items":["identify tripped breaker","check load on circuit","inspect wiring connections","document findings"]}
648change priority to urgentedit_task{"priority":"p1"}
649maria and her team of 6 are on the hvac unit replacement in the east wing category hvac budget 12000 need it by thursday checklist shut down power to unit remove old unit install new unit check refrigerant lines document everythingedit_task{"title":"Replace broken HVAC unit","location":"east wing","category":"HVAC","assignee":"Maria","end_date":"2026-05-07","manpower":"6","cost":"12000","items":["shut down power to unit","remove old unit","install new unit","check refrigerant lines","document everything"]}
650putting down tile floor on e2 starts may 4 wraps up by friday 9 workers on the crew cost 1200edit_task{"title":"Install tile flooring","plan":"E-2","start_date":"2026-05-04","end_date":"2026-05-08","manpower":"9","cost":"1200"}
651this is a hole in the drywall ceiling in parking garage level 1 on a201 mark it pending inspection hector is handling it due by thursday checklist cut out damaged section install backing hang new drywall take photoedit_task{"title":"Patch drywall ceiling","plan":"A201","location":"parking garage level 1","assignee":"Hector","status":"pending inspection","end_date":"2026-05-07","items":["cut out damaged section","install backing","hang new drywall","take photo"]}
652need electrical rough in in the boiler room put felix on it should be done by may 5 cost around 3000edit_task{"title":"Run electrical rough-in","location":"boiler room","assignee":"Felix","end_date":"2026-05-05","cost":"3000"}
653it's fire suppressionedit_task{"category":"fire suppression"}
654it belongs in level 2edit_task{"location":"level 2"}
655set priority priority one location room 201 cost about 20000edit_task{"location":"room 201","priority":"p1","cost":"20000"}
656we've got new sprinkler heads going in in unit 12 put dave on it have it wrapped before the owner review make it urgent checklist confirm pipe layout with plan drill ceiling openings install drops attach heads pressure test take a photo for the recordedit_task{"title":"Install sprinkler heads","location":"unit 12","assignee":"Dave","end_date":"2026-05-14","priority":"p1","items":["confirm pipe layout with plan","drill ceiling openings","install drops","attach heads","pressure test","take a photo for the record"]}
657this is a slow drip under the kitchen sink in the pool deck on e2 mark it verified mike is handling it due by may 6 checklist shut off water supply remove p trap inspect drain line take photoedit_task{"title":"Fix water leak under sink","plan":"E-2","location":"pool deck","assignee":"Mike","status":"verified","end_date":"2026-05-06","items":["shut off water supply","remove p-trap","inspect drain line","take photo"]}
658set start date to may 4 and due date to fridayedit_task{"start_date":"2026-05-04","end_date":"2026-05-08"}
659we need the roof membrane patched assign it to luis crew of 2 cost around 12000 start tomorrow and finish thursday checklist locate the breach clean and dry the area apply primer cut patch membrane final walkthrough with the gcedit_task{"title":"Repair roof membrane","assignee":"Luis","start_date":"2026-05-06","end_date":"2026-05-07","manpower":"2","cost":"12000","items":["locate the breach","clean and dry the area","apply primer","cut patch membrane","final walkthrough with the GC"]}
660we're replacing the broken window glazing on id101 in the main lobby starting may 4 and wrapping thursday team of 2 cost about 1500 category glazing pat is leading it checklist measure opening order replacement glass remove broken pane clean frame install new glass apply glazing compoundedit_task{"title":"Replace broken window glazing","plan":"ID-101","location":"main lobby","category":"glazing","assignee":"Pat","start_date":"2026-05-04","end_date":"2026-05-07","manpower":"2","cost":"1500","items":["measure opening","order replacement glass","remove broken pane","clean frame","install new glass","apply glazing compound"]}
661we've got a cracked concrete slab at grid line b2 put sarah on it have it wrapped by may 9 make it medium priority checklist rout crack to proper width blow out dust apply bond breaker if needed fill with epoxy inject grind flush after cure take a photo for the recordedit_task{"title":"Repair cracked concrete","location":"grid line B2","assignee":"Sarah","end_date":"2026-05-09","priority":"p2","items":["rout crack to proper width","blow out dust","apply bond breaker if needed","fill with epoxy inject","grind flush after cure","take a photo for the record"]}
662the roof membrane has a leak in the east wing budget about 15000 assign kimedit_task{"title":"Repair roof membrane","location":"east wing","assignee":"Kim","cost":"15000"}
663mark this pending inspection it's shower pan waterproofing on the ground flooredit_task{"title":"Apply waterproofing membrane","location":"ground floor","status":"pending inspection"}
664we're scheduling an hvac ductwork leak fix in unit 7 on e2 need 5 workers starting wednesday morning through before the gc walkthrough ballpark cost 1200edit_task{"title":"Fix HVAC ductwork leak","plan":"E-2","location":"unit 7","start_date":"2026-05-06","end_date":"2026-05-08","manpower":"5","cost":"1200"}
665mark this needs review it's a slab pour in level 3edit_task{"title":"Pour concrete slab","location":"level 3","status":"needs review"}
666belongs to mechanicaledit_task{"category":"mechanical"}
667update to in progress pleaseedit_task{"status":"in progress"}
668gotta get the electrical rough in done by friday team of 5 should be enough make it medium priority and assign daveedit_task{"title":"Run electrical rough-in","assignee":"Dave","end_date":"2026-05-08","priority":"p2","manpower":"5"}
669assign to sarah and set priority to mediumedit_task{"assignee":"Sarah","priority":"p2"}
670juan is taking the interior wall demo on m2 budget around 12000 mark it pending inspectionedit_task{"title":"Demolish interior partition","plan":"M2","assignee":"Juan","status":"pending inspection","cost":"12000"}
671assign pat set priority to can wait and due by end of day wednesdayedit_task{"assignee":"Pat","end_date":"2026-05-06","priority":"p3"}
672troy and his team of 3 are on attic insulation in bay 7 category insulation budget around 4000 need it by may 8 checklist check existing r value seal air leaks install baffles at eaves blow insulation to target depth document everythingedit_task{"title":"Insulate attic space","location":"bay 7","category":"insulation","assignee":"Troy","end_date":"2026-05-08","manpower":"3","cost":"4000","items":["check existing R-value","seal air leaks","install baffles at eaves","blow insulation to target depth","document everything"]}
673total cost is 2000edit_task{"cost":"2000"}
674there's a hole in the drywall ceiling in room 201 on sheet 4 the gc wants it done by thursday put danny and 3 guys on it budget about 2000 make it low priority this is drywalledit_task{"title":"Patch drywall ceiling","plan":"Sheet 4","location":"room 201","category":"drywall","assignee":"Danny","end_date":"2026-05-07","priority":"p3","manpower":"3","cost":"2000"}
675start this monday finish by next friday put eddie on itedit_task{"assignee":"Eddie","start_date":"2026-05-04","end_date":"2026-05-15"}
676it's in unit 23 and status is needs reviewedit_task{"location":"unit 23","status":"needs review"}
677sarah is leading the slab pour in stairwell b start may 6 finish next tuesday cost 10000 need 7 guys mark it openedit_task{"title":"Pour concrete slab","location":"stairwell B","assignee":"Sarah","status":"open","start_date":"2026-05-06","end_date":"2026-05-12","manpower":"7","cost":"10000"}
678lena is taking attic insulation over at p2 budget 2000 mark it trackededit_task{"title":"Insulate attic space","plan":"P-2","assignee":"Lena","status":"tracked","cost":"2000"}
679felix is taking the broken fire alarm pull station in level 5 this is fire alarm work urgent done by may 16 manpower team of 9 budget 800 mark needs reviewedit_task{"title":"Install fire alarm pull station","location":"level 5","category":"fire alarm","assignee":"Felix","status":"needs review","end_date":"2026-05-16","priority":"p1","manpower":"9","cost":"800"}
680need some recessed lighting put in in the main lobby put reza on it should be done by thursday cost around 5000edit_task{"title":"Install recessed lighting","location":"main lobby","assignee":"Reza","end_date":"2026-05-07","cost":"5000"}
681we're doing the exterior paint in the penthouse level put maria on it have it wrapped by next friday make it medium priority checklist pressure wash surface scrape loose paint apply primer caulk gaps and cracks roll first coat take a photo for the recordedit_task{"title":"Paint exterior facade","location":"penthouse level","assignee":"Maria","end_date":"2026-05-15","priority":"p2","items":["pressure wash surface","scrape loose paint","apply primer","caulk gaps and cracks","roll first coat","take a photo for the record"]}
682we're scheduling an electrical panel fix for room 201 on c1 need a team of 6 starting next tuesday through friday ballpark cost 7000edit_task{"title":"Fix electrical panel issue","plan":"C-1","location":"room 201","start_date":"2026-05-12","end_date":"2026-05-15","manpower":"6","cost":"7000"}
683this one is fire suppression heads on m2 bump it to high priority brenda handles it by end of day wednesday budget around 6000 location suite 3b category sprinkleredit_task{"title":"Install sprinkler heads","plan":"M2","location":"suite 3B","category":"sprinkler","assignee":"Brenda","end_date":"2026-05-06","priority":"p1","cost":"6000"}
684kick off wednesday morningedit_task{"start_date":"2026-05-06"}
685fix water leak under sink on e1 put ray on it make it high priority by may 16 crew of 9 budget about 15000 checklist shut off water supply remove p trap inspect drain line replace gaskets reinstall p trapedit_task{"title":"Fix water leak under sink","plan":"E1","assignee":"Ray","end_date":"2026-05-16","priority":"p1","manpower":"9","cost":"15000","items":["shut off water supply","remove p-trap","inspect drain line","replace gaskets","reinstall p-trap"]}
686we're pouring the slab in suite 3b put felix on it have it wrapped by may 19 make it medium priority checklist set forms place rebar order concrete pour slab screed and float take a photo for the recordedit_task{"title":"Pour concrete slab","location":"suite 3B","assignee":"Felix","end_date":"2026-05-19","priority":"p2","items":["set forms","place rebar","order concrete","pour slab","screed and float","take a photo for the record"]}
687category fire suppression drawing plumbing p4 and set status to verifiededit_task{"plan":"plumbing P4","category":"fire suppression","status":"verified"}
688assign gus priority medium cost 1200 and due by fridayedit_task{"assignee":"Gus","end_date":"2026-05-08","priority":"p2","cost":"1200"}
689done by may 19edit_task{"end_date":"2026-05-19"}
690set cost to 10000 manpower to 9 workers and category to low voltageedit_task{"category":"low voltage","manpower":"9","cost":"10000"}
691run electrical rough in on the ground floor put mike on it make it medium priority by end of next week 9 workers budget about 800 checklist pull permits mark box locations per plan drill studs pull wire stub out boxesedit_task{"title":"Run electrical rough-in","plan":"ground floor","assignee":"Mike","end_date":"2026-05-15","priority":"p2","manpower":"9","cost":"800","items":["pull permits","mark box locations per plan","drill studs","pull wire","stub out boxes"]}
692budget is 6000 and category is insulationedit_task{"category":"insulation","cost":"6000"}
693set priority asap assign eddie mark open and due by may 21edit_task{"assignee":"Eddie","status":"open","end_date":"2026-05-21","priority":"p1"}
694assign zack on it and get it done by thursdayedit_task{"assignee":"Zack","end_date":"2026-05-07"}
695change category to demolition and mark it openedit_task{"category":"demolition","status":"open"}
696maria is taking shower pan waterproofing in the penthouse level this is waterproofing work medium priority done by next friday manpower team of 6 budget 1200 mark completeedit_task{"title":"Apply waterproofing membrane","location":"penthouse level","category":"waterproofing","assignee":"Maria","status":"complete","end_date":"2026-05-15","priority":"p2","manpower":"6","cost":"1200"}
697tony is taking the breaker issue in the main lobby this is electrical work medium priority done by next tuesday manpower 8 workers budget 5000 mark completeedit_task{"title":"Fix electrical panel issue","location":"main lobby","category":"electrical","assignee":"Tony","status":"complete","end_date":"2026-05-12","priority":"p2","manpower":"8","cost":"5000"}
698this is a new wall that needs framing in parking garage level 1 on a101 mark it verified kim is handling it due by next tuesday checklist snap chalk lines lay bottom plate stand studs 16 oc rough inspectionedit_task{"title":"Frame new partition wall","plan":"A101","location":"parking garage level 1","assignee":"Kim","status":"verified","end_date":"2026-05-12","items":["snap chalk lines","lay bottom plate","stand studs 16 OC","rough inspection"]}
699cost 1200 crew of 9 category concrete due before the inspectionedit_task{"category":"concrete","end_date":"2026-05-14","manpower":"9","cost":"1200"}
700set priority critical location loading dock cost 8000edit_task{"location":"loading dock","priority":"p1","cost":"8000"}
701target completion may 17edit_task{"end_date":"2026-05-17"}
702reza is handling this oneedit_task{"assignee":"Reza"}
703the ac unit is shot in the pool deck on e2 the gc wants it done by end of day wednesday put eddie and 9 workers on it budget 6000 make it urgent this is hvacedit_task{"title":"Replace broken HVAC unit","plan":"E-2","location":"pool deck","category":"HVAC","assignee":"Eddie","end_date":"2026-05-06","priority":"p1","manpower":"9","cost":"6000"}
704gotta get the suspended ceiling grid installed in unit 7 by end of month make it medium priorityedit_task{"title":"Install ceiling grid and tiles","location":"unit 7","end_date":"2026-05-29","priority":"p2"}
705we've got a leak under the sink assign it to brenda crew of 2 cost around 4000 start this monday and finish may 9 checklist shut off water supply remove p trap inspect drain line replace gaskets final walkthrough with the gcedit_task{"title":"Fix water leak under sink","assignee":"Brenda","start_date":"2026-05-04","end_date":"2026-05-09","manpower":"2","cost":"4000","items":["shut off water supply","remove p-trap","inspect drain line","replace gaskets","final walkthrough with the GC"]}
706mobilize wednesday morningedit_task{"start_date":"2026-05-06"}
707floor tile installation in the boiler room budget about 10000 assign vicedit_task{"title":"Install tile flooring","location":"boiler room","assignee":"Vic","cost":"10000"}
708set start to may 4edit_task{"start_date":"2026-05-04"}
709this one is water leaking from the pipes under the sink on fp3 mark it medium pat handles it by end of day wednesday budget around 12000 location roof deck category plumbingedit_task{"title":"Fix water leak under sink","plan":"FP-3","location":"roof deck","category":"plumbing","assignee":"Pat","end_date":"2026-05-06","priority":"p2","cost":"12000"}
710mark it asapedit_task{"priority":"p1"}
711send a team of 10 overedit_task{"manpower":"10"}
712move it to the west wingedit_task{"location":"west wing"}
713this is recessed cans in bay 4 on civil sheet 3 mark it on hold brenda is handling it due by end of month checklist run romex to junction box mount the housing cans connect wiring take finished photoedit_task{"title":"Install recessed lighting","plan":"civil sheet 3","location":"bay 4","assignee":"Brenda","status":"on hold","end_date":"2026-05-29","items":["run romex to junction box","mount the housing cans","connect wiring","take finished photo"]}
714vic and his team of 2 are on crack repair on the parking deck in the mezzanine category concrete budget 800 need it by end of month checklist rout crack to proper width blow out dust apply bond breaker if needed fill with epoxy inject document everythingedit_task{"title":"Repair cracked concrete","location":"mezzanine","category":"concrete","assignee":"Vic","end_date":"2026-05-29","manpower":"2","cost":"800","items":["rout crack to proper width","blow out dust","apply bond breaker if needed","fill with epoxy inject","document everything"]}
715put troy and a team of 9 on floor tile installation start next tuesday and have it done by fridayedit_task{"title":"Install tile flooring","assignee":"Troy","start_date":"2026-05-12","end_date":"2026-05-15","manpower":"9"}
716we've got a broken glass panel replacement assign that to bobby low priority end of next week is fineedit_task{"title":"Replace broken window glazing","assignee":"Bobby","end_date":"2026-05-15","priority":"p3"}
717this falls under hvacedit_task{"category":"HVAC"}
718cost 2000 crew of 9 category plumbing due by thursdayedit_task{"category":"plumbing","end_date":"2026-05-07","manpower":"9","cost":"2000"}
719gus is leading the foundation pour in suite 101 start tomorrow finish may 21 cost 12000 need a team of 3 mark it closededit_task{"title":"Pour concrete slab","location":"suite 101","assignee":"Gus","status":"closed","start_date":"2026-05-06","end_date":"2026-05-21","manpower":"3","cost":"12000"}
720tag vic as assigneeedit_task{"assignee":"Vic"}
721put bobby and 8 workers on installing the suspended ceiling grid start next tuesday and have it done by fridayedit_task{"title":"Install ceiling grid and tiles","assignee":"Bobby","start_date":"2026-05-12","end_date":"2026-05-15","manpower":"8"}
722want it wrapped by next tuesdayedit_task{"end_date":"2026-05-12"}
723we're scheduling the concrete slab pour for grid line b2 on the ground floor need a crew of 10 starting may 3 through before the gc walkthrough ballpark cost 7000edit_task{"title":"Pour concrete slab","plan":"ground floor","location":"grid line B2","start_date":"2026-05-03","end_date":"2026-05-13","manpower":"10","cost":"7000"}
724task is in the courtyardedit_task{"location":"courtyard"}
725send a crew of 8 overedit_task{"manpower":"8"}
726gotta get the exterior paint job in level 4 done by may 20 make it medium priorityedit_task{"title":"Paint exterior facade","location":"level 4","end_date":"2026-05-20","priority":"p2"}
727push the due date to end of monthedit_task{"end_date":"2026-05-29"}
728we're installing the ceiling grid and tiles on p2 in room 201 starting this monday and wrapping may 5 2 workers on it cost about 8000 category drywall juan is leading it checklist snap layout lines install wall angle hang main tees install cross tees cut perimeter tiles drop in field tilesedit_task{"title":"Install ceiling grid and tiles","plan":"P-2","location":"room 201","category":"drywall","assignee":"Juan","start_date":"2026-05-04","end_date":"2026-05-05","manpower":"2","cost":"8000","items":["snap layout lines","install wall angle","hang main tees","install cross tees","cut perimeter tiles","drop in field tiles"]}
729name it fix electrical panel issueedit_task{"title":"Fix electrical panel issue"}
730category is insulationedit_task{"category":"insulation"}
731we've got the partition wall demo assign that to kim low priority end of next week is fineedit_task{"title":"Demolish interior partition","assignee":"Kim","end_date":"2026-05-15","priority":"p3"}
732need sprinkler heads run in the loading dock put pat on it should be done by end of month cost around 2500edit_task{"title":"Install sprinkler heads","location":"loading dock","assignee":"Pat","end_date":"2026-05-29","cost":"2500"}
733it belongs in the south corridoredit_task{"location":"south corridor"}
734deadline is end of monthedit_task{"end_date":"2026-05-29"}
735we're installing tile flooring on m3 in unit 7 starting may 2 and wrapping before the inspection crew of 9 cost 12000 category tile eddie is leading it checklist demo old flooring level subfloor apply thinset mortar lay tile to pattern cut edge tiles groutedit_task{"title":"Install tile flooring","plan":"M-3","location":"unit 7","category":"tile","assignee":"Eddie","start_date":"2026-05-02","end_date":"2026-05-15","manpower":"9","cost":"12000","items":["demo old flooring","level subfloor","apply thinset mortar","lay tile to pattern","cut edge tiles","grout"]}
736we're looking at 4000 for thisedit_task{"cost":"4000"}
737we're replacing the plumbing fixture on s1 in the main lobby starting may 2 and wrapping thursday 10 workers on it cost 15000 category plumbing kim is leading it checklist shut off water remove old fixture clean mounting surface install new fixture reconnect supply lines test for leaksedit_task{"title":"Replace broken plumbing fixture","plan":"S-1","location":"main lobby","category":"plumbing","assignee":"Kim","start_date":"2026-05-02","end_date":"2026-05-07","manpower":"10","cost":"15000","items":["shut off water","remove old fixture","clean mounting surface","install new fixture","reconnect supply lines","test for leaks"]}
738gus is leading the recessed can install in bay 12 start tomorrow finish end of month cost around 3500 need a team of 7 mark it openedit_task{"title":"Install recessed lighting","location":"bay 12","assignee":"Gus","status":"open","start_date":"2026-05-06","end_date":"2026-05-29","manpower":"7","cost":"3500"}
739begin this mondayedit_task{"start_date":"2026-05-04"}
740this is a duct leak in the plenum in the east lobby on a101 mark it closed hector is handling it due by next tuesday checklist locate all leak points clean duct surface apply mastic sealant document fixedit_task{"title":"Fix HVAC ductwork leak","plan":"A101","location":"east lobby","assignee":"Hector","status":"closed","end_date":"2026-05-12","items":["locate all leak points","clean duct surface","apply mastic sealant","document fix"]}
741this is demoing the interior wall in room 201 on structural s2 bump it to high priority due by fridayedit_task{"title":"Demolish interior partition","plan":"structural S2","location":"room 201","end_date":"2026-05-08","priority":"p1"}
742we've got a leak under the sink in unit 23 put hector on it have it wrapped by may 7 make it low priority checklist shut off water supply remove p trap inspect drain line replace gaskets reinstall p trap take a photo for the recordedit_task{"title":"Fix water leak under sink","location":"unit 23","assignee":"Hector","end_date":"2026-05-07","priority":"p3","items":["shut off water supply","remove p-trap","inspect drain line","replace gaskets","reinstall p-trap","take a photo for the record"]}
743we're scheduling recessed lighting in unit 12 on the roof level plan need 1 guy starting this monday through may 5 ballpark cost about 3500edit_task{"title":"Install recessed lighting","plan":"roof level","location":"unit 12","start_date":"2026-05-04","end_date":"2026-05-05","manpower":"1","cost":"3500"}
744we're scheduling ceiling grid and tile install for stairwell a on the roof level plan need 3 workers starting may 3 through may 7 ballpark cost around 15000edit_task{"title":"Install ceiling grid and tiles","plan":"roof level","location":"stairwell A","start_date":"2026-05-03","end_date":"2026-05-07","manpower":"3","cost":"15000"}
745put bobby and a team of 10 on the old hvac swap start tomorrow and have it done by may 16edit_task{"title":"Replace broken HVAC unit","assignee":"Bobby","start_date":"2026-05-06","end_date":"2026-05-16","manpower":"10"}
746set start date to next tuesday and due date to may 16edit_task{"start_date":"2026-05-12","end_date":"2026-05-16"}
747bump it to high priority and push the deadline to end of day wednesdayedit_task{"end_date":"2026-05-06","priority":"p1"}
748end date is before the owner reviewedit_task{"end_date":"2026-05-08"}
749we're scheduling partition demo for the server room on e1 need a team of 1 starting wednesday morning through friday ballpark cost about 4000edit_task{"title":"Demolish interior partition","plan":"E1","location":"server room","start_date":"2026-05-06","end_date":"2026-05-08","manpower":"1","cost":"4000"}
750we're scheduling sprinkler head install for grid line b2 on the ground floor need a team of 9 starting wednesday morning through next friday ballpark cost 1500edit_task{"title":"Install sprinkler heads","plan":"ground floor","location":"grid line B2","start_date":"2026-05-06","end_date":"2026-05-15","manpower":"9","cost":"1500"}
751sarah is leading the interior wall demo in elevator shaft b start tomorrow finish end of day wednesday cost about 4000 need a crew of 7 mark it openedit_task{"title":"Demolish interior partition","location":"elevator shaft B","assignee":"Sarah","status":"open","start_date":"2026-05-06","end_date":"2026-05-06","manpower":"7","cost":"4000"}
752set cost to 5000 and manpower to a team of 6edit_task{"manpower":"6","cost":"5000"}
753move this to a4 and set location to suite 3bedit_task{"plan":"A-4","location":"suite 3B"}
754start may 4 end may 6 manpower team of 6 and cost about 7000edit_task{"start_date":"2026-05-04","end_date":"2026-05-06","manpower":"6","cost":"7000"}
755we've got an hvac ductwork leak in suite 3b on the mezzanine plan the gc wants it done by end of month put troy and a team of 9 on it budget 3500 make it high priority category hvacedit_task{"title":"Fix HVAC ductwork leak","plan":"mezzanine","location":"suite 3B","category":"HVAC","assignee":"Troy","end_date":"2026-05-29","priority":"p1","manpower":"9","cost":"3500"}
756assign steve on it and get it done by may 19edit_task{"assignee":"Steve","end_date":"2026-05-19"}
757it's in suite 101 and status is openedit_task{"location":"suite 101","status":"open"}
758we've got drywall damage on the ceiling on e2 felix is on this make it low priority by end of monthedit_task{"title":"Patch drywall ceiling","plan":"E-2","assignee":"Felix","end_date":"2026-05-29","priority":"p3"}
759eddie and his crew of 2 are on the ac unit replacement in the north corridor category hvac budget 7000 need it by may 7 checklist shut down power to unit remove old unit install new unit check refrigerant lines document everythingedit_task{"title":"Replace broken HVAC unit","location":"north corridor","category":"HVAC","assignee":"Eddie","end_date":"2026-05-07","manpower":"2","cost":"7000","items":["shut down power to unit","remove old unit","install new unit","check refrigerant lines","document everything"]}
760we've got carpet replacement in suite 4b assign that to sal low priority end of next week is fineedit_task{"title":"Replace carpet in office","location":"suite 4B","assignee":"Sal","end_date":"2026-05-15","priority":"p3"}
761we've got water leaking from the pipes under the sink in bay 7 put tony on it have it wrapped by end of day wednesday make it high priority checklist shut off water supply remove p trap inspect drain line replace gaskets reinstall p trap take a photo for the recordedit_task{"title":"Fix water leak under sink","location":"bay 7","assignee":"Tony","end_date":"2026-05-06","priority":"p1","items":["shut off water supply","remove p-trap","inspect drain line","replace gaskets","reinstall p-trap","take a photo for the record"]}
762category carpentry drawing m3 and set status to completeedit_task{"plan":"M-3","category":"carpentry","status":"complete"}
763we need the fire suppression heads installed assign it to jake crew of 3 cost around 12000 start wednesday morning and finish end of day wednesday checklist confirm pipe layout with plan drill ceiling openings install drops attach heads final walkthrough with the gcedit_task{"title":"Install sprinkler heads","assignee":"Jake","start_date":"2026-05-06","end_date":"2026-05-06","manpower":"3","cost":"12000","items":["confirm pipe layout with plan","drill ceiling openings","install drops","attach heads","final walkthrough with the GC"]}
764start may 3 finish by friday put reza on itedit_task{"assignee":"Reza","start_date":"2026-05-03","end_date":"2026-05-08"}
765this one is new carpet going into the office on s1 mark it low priority omar handles it by may 21 budget around 7000 location mechanical roomedit_task{"title":"Replace carpet in office","plan":"S-1","location":"mechanical room","assignee":"Omar","end_date":"2026-05-21","priority":"p3","cost":"7000"}
766assign vic cost around 20000 and mark it medium priorityedit_task{"assignee":"Vic","priority":"p2","cost":"20000"}
767brenda and her 8 guys are on the electrical rough in in room 201 category electrical budget 3500 need it by next tuesday checklist pull permits mark box locations per plan drill studs pull wire document everythingedit_task{"title":"Run electrical rough-in","location":"room 201","category":"electrical","assignee":"Brenda","end_date":"2026-05-12","manpower":"8","cost":"3500","items":["pull permits","mark box locations per plan","drill studs","pull wire","document everything"]}
768status is closededit_task{"status":"closed"}
769staffing this with 9 workersedit_task{"manpower":"9"}
770assign hector high priority cost 12000 and due by end of day wednesdayedit_task{"assignee":"Hector","end_date":"2026-05-06","priority":"p1","cost":"12000"}
771gotta get a new partition framed in the data center floor by thursday make it high priorityedit_task{"title":"Frame new partition wall","location":"data center floor","end_date":"2026-05-07","priority":"p1"}
772assign mike make it medium priority and due by end of monthedit_task{"assignee":"Mike","end_date":"2026-05-29","priority":"p2"}
773fixing the cracks in the floor slab in the server room budget about 1200 assign troyedit_task{"title":"Repair cracked concrete","location":"server room","assignee":"Troy","cost":"1200"}
774gotta get the electrical rough in in level 4 done by next tuesday make it high priorityedit_task{"title":"Run electrical rough-in","location":"level 4","end_date":"2026-05-12","priority":"p1"}
775move this to a202 and set location to the courtyardedit_task{"plan":"A202","location":"courtyard"}
776category fire suppression drawing s1 and set status to closededit_task{"plan":"S-1","category":"fire suppression","status":"closed"}
777cost 15000 crew of 3 category glazing due by next tuesdayedit_task{"category":"glazing","end_date":"2026-05-12","manpower":"3","cost":"15000"}
778assign maria set priority to medium and due by may 6edit_task{"assignee":"Maria","end_date":"2026-05-06","priority":"p2"}
779set category to fire alarmedit_task{"category":"fire alarm"}
780we're scheduling low voltage cabling for stairwell a on s1 need a crew of 1 starting tomorrow through before the owner review ballpark cost around 1200edit_task{"title":"Install low voltage cabling","plan":"S-1","location":"stairwell A","start_date":"2026-05-06","end_date":"2026-05-09","manpower":"1","cost":"1200"}
781budget is 6000 and category is structuraledit_task{"category":"structural","cost":"6000"}
782we're demoing the partition on id101 in the east lobby starting wednesday morning and wrapping end of day wednesday 9 workers on it cost 10000 category demolition bobby is leading it checklist verify no electrical or plumbing in wall shut off circuits remove door strip drywall cut studs remove platesedit_task{"title":"Demolish interior partition","plan":"ID-101","location":"east lobby","category":"demolition","assignee":"Bobby","start_date":"2026-05-06","end_date":"2026-05-06","manpower":"9","cost":"10000","items":["verify no electrical or plumbing in wall","shut off circuits","remove door","strip drywall","cut studs","remove plates"]}
783this is recessed lighting in basement level 2 on plumbing p4 mark it needs review hector is handling it due before the gc walkthrough checklist run romex to junction box mount the housing cans connect wiring take finished photoedit_task{"title":"Install recessed lighting","plan":"plumbing P4","location":"basement level 2","assignee":"Hector","status":"needs review","end_date":"2026-05-14","items":["run romex to junction box","mount the housing cans","connect wiring","take finished photo"]}
784we need the interior wall demo assign it to danny crew of 3 cost around 4000 start this monday and finish friday checklist verify no electrical or plumbing in wall shut off circuits remove door strip drywall final walkthrough with the gcedit_task{"title":"Demolish interior partition","assignee":"Danny","start_date":"2026-05-04","end_date":"2026-05-08","manpower":"3","cost":"4000","items":["verify no electrical or plumbing in wall","shut off circuits","remove door","strip drywall","final walkthrough with the GC"]}
785gotta get the old carpet pulled up in suite 3b by next friday make it medium priorityedit_task{"title":"Replace carpet in office","location":"suite 3B","end_date":"2026-05-15","priority":"p2"}
786we're replacing the broken window glazing on a101 in the data center floor starting next tuesday and wrapping next friday team of 3 cost about 15000 category glazing troy is leading it checklist measure opening order replacement glass remove broken pane clean frame install new glass apply glazing compoundedit_task{"title":"Replace broken window glazing","plan":"A101","location":"data center floor","category":"glazing","assignee":"Troy","start_date":"2026-05-12","end_date":"2026-05-15","manpower":"3","cost":"15000","items":["measure opening","order replacement glass","remove broken pane","clean frame","install new glass","apply glazing compound"]}
787we've got attic insulation in stairwell a put reza on it have it wrapped by end of day wednesday make it low priority checklist check existing r value seal air leaks install baffles at eaves blow insulation to target depth verify depth with ruler take a photo for the recordedit_task{"title":"Insulate attic space","location":"stairwell A","assignee":"Reza","end_date":"2026-05-06","priority":"p3","items":["check existing R-value","seal air leaks","install baffles at eaves","blow insulation to target depth","verify depth with ruler","take a photo for the record"]}
788we've got a partition wall demo assign that to omar low priority end of next week is fineedit_task{"title":"Demolish interior partition","assignee":"Omar","end_date":"2026-05-15","priority":"p3"}
789install ceiling grid and tiles on c1 put kim on it low priority by end of month team of 4 budget about 1500 checklist snap layout lines install wall angle hang main tees install cross tees cut perimeter tilesedit_task{"title":"Install ceiling grid and tiles","plan":"C-1","assignee":"Kim","end_date":"2026-05-29","priority":"p3","manpower":"4","cost":"1500","items":["snap layout lines","install wall angle","hang main tees","install cross tees","cut perimeter tiles"]}
790we've got water getting through the roof membrane assign it to bobby crew of 2 cost around 1200 start may 5 and finish before the inspection checklist locate the breach clean and dry the area apply primer cut patch membrane final walkthrough with the gcedit_task{"title":"Repair roof membrane","assignee":"Bobby","start_date":"2026-05-05","end_date":"2026-05-15","manpower":"2","cost":"1200","items":["locate the breach","clean and dry the area","apply primer","cut patch membrane","final walkthrough with the GC"]}
791assign hector set priority to medium and due by thursdayedit_task{"assignee":"Hector","end_date":"2026-05-07","priority":"p2"}
792this one is floor tile installation on s1 bump it to high priority dave handles it by may 19 budget around 15000 location level 4 category tileedit_task{"title":"Install tile flooring","plan":"S-1","location":"level 4","category":"tile","assignee":"Dave","end_date":"2026-05-19","priority":"p1","cost":"15000"}
793we're painting the exterior facade on a301 bobby is on this make it low priority by may 16edit_task{"title":"Paint exterior facade","plan":"A301","assignee":"Bobby","end_date":"2026-05-16","priority":"p3"}
794we're fixing the hvac ductwork leak on p2 on the ground floor starting next tuesday team of 8 on it cost about 2000 category hvac pat is leading it checklist locate all leak points clean duct surface apply mastic sealant wrap with foil tape reinsulate if needed test system airflowedit_task{"title":"Fix HVAC ductwork leak","plan":"P-2","location":"ground floor","category":"HVAC","assignee":"Pat","start_date":"2026-05-12","manpower":"8","cost":"2000","items":["locate all leak points","clean duct surface","apply mastic sealant","wrap with foil tape","re-insulate if needed","test system airflow"]}
795move to e1 location unit 7 and mark trackededit_task{"plan":"E1","location":"unit 7","status":"tracked"}
796we've got a broken faucet replacement on the roof deck put danny on it have it wrapped by next friday make it medium priority checklist shut off water remove old fixture clean mounting surface install new fixture reconnect supply lines take a photo for the recordedit_task{"title":"Replace broken plumbing fixture","location":"roof deck","assignee":"Danny","end_date":"2026-05-15","priority":"p2","items":["shut off water","remove old fixture","clean mounting surface","install new fixture","reconnect supply lines","take a photo for the record"]}
797we've got a new partition wall going in on level 4 put reza on it have it wrapped by may 15 make it high priority checklist snap chalk lines lay bottom plate stand studs 16 oc install top plate frame door opening take a photo for the recordedit_task{"title":"Frame new partition wall","location":"level 4","assignee":"Reza","end_date":"2026-05-15","priority":"p1","items":["snap chalk lines","lay bottom plate","stand studs 16 OC","install top plate","frame door opening","take a photo for the record"]}
798update the name to replace broken hvac unitedit_task{"title":"replace broken hvac unit"}
799budget is around 3500 and category is low voltageedit_task{"category":"low voltage","cost":"3500"}
800assign to dave and set priority to p2edit_task{"assignee":"Dave","priority":"p2"}
801move to sheet 4 location parking garage level 1 and mark needs reviewedit_task{"plan":"Sheet 4","location":"parking garage level 1","status":"needs review"}
802this is a ductwork leak in level 3 on fp3 mark it complete hector is handling it due by may 5 checklist locate all leak points clean duct surface apply mastic sealant document fixedit_task{"title":"Fix HVAC ductwork leak","plan":"FP-3","location":"level 3","assignee":"Hector","status":"complete","end_date":"2026-05-05","items":["locate all leak points","clean duct surface","apply mastic sealant","document fix"]}
803juan is taking the electrical rough in on a202 budget around 2000 mark it in progressedit_task{"title":"Run electrical rough-in","plan":"A202","assignee":"Juan","status":"in progress","cost":"2000"}
804maria is leading a new wall framing job in the penthouse level start wednesday morning finish may 17 cost about 1200 need a team of 3 mark it openedit_task{"title":"Frame new partition wall","location":"penthouse level","assignee":"Maria","status":"open","start_date":"2026-05-06","end_date":"2026-05-17","manpower":"3","cost":"1200"}
805we're pouring the slab in bay 4 put eddie on it have it wrapped by friday make it medium priority checklist set forms place rebar order concrete pour slab screed and float take a photo for the recordedit_task{"title":"Pour concrete slab","location":"bay 4","assignee":"Eddie","end_date":"2026-05-08","priority":"p2","items":["set forms","place rebar","order concrete","pour slab","screed and float","take a photo for the record"]}
806assign sarah low priority cost roughly 1500 and due by may 8edit_task{"assignee":"Sarah","end_date":"2026-05-08","priority":"p3","cost":"1500"}
807change category to roofing and mark it needs reviewedit_task{"category":"roofing","status":"needs review"}
808assign reza cost about 1200 and mark it medium priorityedit_task{"assignee":"Reza","priority":"p2","cost":"1200"}
809move to fp2 location loading dock and mark on holdedit_task{"plan":"FP-2","location":"loading dock","status":"on hold"}
810we've got water leaking from the pipes under the sink assign it to omar crew of 2 cost around 8000 start next tuesday and finish may 21 checklist shut off water supply remove p trap inspect drain line replace gaskets final walkthrough with the gcedit_task{"title":"Fix water leak under sink","assignee":"Omar","start_date":"2026-05-12","end_date":"2026-05-21","manpower":"2","cost":"8000","items":["shut off water supply","remove p-trap","inspect drain line","replace gaskets","final walkthrough with the GC"]}
811category tile drawing sheet 7 and set status to openedit_task{"plan":"Sheet 7","category":"tile","status":"open"}
812move it to verifiededit_task{"status":"verified"}
813start wednesday morning end may 17 manpower team of 6 and cost around 10000edit_task{"start_date":"2026-05-06","end_date":"2026-05-17","manpower":"6","cost":"10000"}
814set start date to next tuesday and due date to end of monthedit_task{"start_date":"2026-05-12","end_date":"2026-05-29"}
815it's in the server room and status is pending inspectionedit_task{"location":"server room","status":"pending inspection"}
816assign to lena and set priority to not a rushedit_task{"assignee":"Lena","priority":"p3"}
817we're scheduling the hvac unit replacement for level 5 on the ground floor need 8 guys starting tomorrow through before the inspection ballpark cost 20000edit_task{"title":"Replace broken HVAC unit","plan":"ground floor","location":"level 5","start_date":"2026-05-06","end_date":"2026-05-14","manpower":"8","cost":"20000"}
818we've got a roof membrane leak on the ground floor put dave on it have it wrapped before the owner review make it high priority checklist locate the breach clean and dry the area apply primer cut patch membrane adhere patch take a photo for the recordedit_task{"title":"Repair roof membrane","location":"ground floor","assignee":"Dave","end_date":"2026-05-12","priority":"p1","items":["locate the breach","clean and dry the area","apply primer","cut patch membrane","adhere patch","take a photo for the record"]}
819call it paint exterior facadeedit_task{"title":"Paint exterior facade"}
820mark this verified it's replacing the broken faucet in the mezzanineedit_task{"title":"Replace broken plumbing fixture","location":"mezzanine","status":"verified"}
821new pull station install in bay 7 put juan on that make it medium priority get it done by may 11edit_task{"title":"Install fire alarm pull station","location":"bay 7","assignee":"Juan","end_date":"2026-05-11","priority":"p2"}
822steve and his team of 7 are on carpet replacement in suite 4b in bay 7 budget 2500 need it by may 15 checklist move furniture remove old carpet pull tack strips prep subfloor document everythingedit_task{"title":"Replace carpet in office","location":"suite 4B","assignee":"Steve","end_date":"2026-05-15","manpower":"7","cost":"2500","items":["move furniture","remove old carpet","pull tack strips","prep subfloor","document everything"]}
823set priority medium assign sarah mark complete and due by end of day wednesdayedit_task{"assignee":"Sarah","status":"complete","end_date":"2026-05-06","priority":"p2"}
824we're scheduling plumbing fixture replacement for unit 23 on s1 need a crew of 6 starting tomorrow through friday ballpark cost 10000edit_task{"title":"Replace broken plumbing fixture","plan":"S-1","location":"unit 23","start_date":"2026-05-06","end_date":"2026-05-08","manpower":"6","cost":"10000"}
825gotta get the recessed cans installed by friday team of 8 should be enough make it low priority and assign kimedit_task{"title":"Install recessed lighting","assignee":"Kim","end_date":"2026-05-08","priority":"p3","manpower":"8"}
826assign maria set priority to low and due by may 9edit_task{"assignee":"Maria","end_date":"2026-05-09","priority":"p3"}
827install ceiling grid and tiles on structural s2 put gus on it make it high priority by end of month 7 workers budget about 8000 checklist snap layout lines install wall angle hang main tees install cross tees cut perimeter tilesedit_task{"title":"Install ceiling grid and tiles","plan":"structural S2","assignee":"Gus","end_date":"2026-05-29","priority":"p1","manpower":"7","cost":"8000","items":["snap layout lines","install wall angle","hang main tees","install cross tees","cut perimeter tiles"]}
828window glazing is cracked on a301 start this monday wrap up before the owner review team of 10 cost around 7000edit_task{"title":"Replace broken window glazing","plan":"A301","start_date":"2026-05-04","end_date":"2026-05-12","manpower":"10","cost":"7000"}
829set priority to high assign nadia mark verified and due by end of monthedit_task{"assignee":"Nadia","status":"verified","end_date":"2026-05-29","priority":"p1"}
830need 3 guys for thisedit_task{"manpower":"3"}
831we're scheduling an electrical panel fix for the loading dock on m2 need a team of 4 starting tomorrow through may 8 ballpark cost 2000edit_task{"title":"Fix electrical panel issue","plan":"M2","location":"loading dock","start_date":"2026-05-06","end_date":"2026-05-08","manpower":"4","cost":"2000"}
832we're installing the fire suppression heads in the courtyard put luis on it have it wrapped by next friday make it high priority checklist confirm pipe layout with plan drill ceiling openings install drops attach heads pressure test take a photo for the recordedit_task{"title":"Install sprinkler heads","location":"courtyard","assignee":"Luis","end_date":"2026-05-15","priority":"p1","items":["confirm pipe layout with plan","drill ceiling openings","install drops","attach heads","pressure test","take a photo for the record"]}
833we're pouring the concrete slab on plumbing p4 at grid line b2 starting wednesday morning and wrapping may 6 team of 3 cost about 6000 category concrete mike is leading it checklist set forms place rebar order concrete pour slab screed and float apply curing compoundedit_task{"title":"Pour concrete slab","plan":"plumbing P4","location":"grid line B2","category":"concrete","assignee":"Mike","start_date":"2026-05-06","end_date":"2026-05-06","manpower":"3","cost":"6000","items":["set forms","place rebar","order concrete","pour slab","screed and float","apply curing compound"]}
834set cost to 12000 and manpower to 7 workersedit_task{"manpower":"7","cost":"12000"}
835we've got an ac unit shot that needs replacing assign that to maria low priority end of next week is fineedit_task{"title":"Replace broken HVAC unit","assignee":"Maria","end_date":"2026-05-15","priority":"p3"}
836we've got a duct leak in the plenum on a3 brenda is on this make it urgent by end of monthedit_task{"title":"Fix HVAC ductwork leak","plan":"A-3","assignee":"Brenda","end_date":"2026-05-29","priority":"p1"}
837this is sprinkler heads in the west wing on p2 mark it low priority due by may 19edit_task{"title":"Install sprinkler heads","plan":"P-2","location":"west wing","end_date":"2026-05-19","priority":"p3"}
838put troy and a team of 8 on attic insulation start may 6 and have it done by fridayedit_task{"title":"Insulate attic space","assignee":"Troy","start_date":"2026-05-06","end_date":"2026-05-08","manpower":"8"}
839we need new sprinkler heads on m3 kim is on this make it top priority by next fridayedit_task{"title":"Install sprinkler heads","plan":"M-3","assignee":"Kim","end_date":"2026-05-15","priority":"p1"}
840assign gus bump it to high priority and due by next tuesdayedit_task{"assignee":"Gus","end_date":"2026-05-12","priority":"p1"}
841assign brenda cost about 3000 and mark it low priorityedit_task{"assignee":"Brenda","priority":"p3","cost":"3000"}
842we've got an exhaust fan swap in elevator shaft b on a101 the gc wants it done by next tuesday put zack and a team of 7 on it budget 6000 make it medium priority category mechanicaledit_task{"title":"Replace exhaust fan","plan":"A101","location":"elevator shaft B","category":"mechanical","assignee":"Zack","end_date":"2026-05-12","priority":"p2","manpower":"7","cost":"6000"}
843budget is 5000 and category is fire suppressionedit_task{"category":"fire suppression","cost":"5000"}
844we've got fire suppression heads in the boiler room on m2 the gc wants it done by end of month put danny and a team of 1 on it budget 8000 make it low priority category sprinkleredit_task{"title":"Install sprinkler heads","plan":"M2","location":"boiler room","category":"sprinkler","assignee":"Danny","end_date":"2026-05-29","priority":"p3","manpower":"1","cost":"8000"}
845status update to needs reviewedit_task{"status":"needs review"}
846mark this complete it's running low voltage cable in stairwell bedit_task{"title":"Install low voltage cabling","location":"stairwell B","status":"complete"}
847file it under mechanicaledit_task{"category":"mechanical"}
848we're demoing the partition on fp3 in the main lobby starting may 4 and wrapping may 19 7 workers on it cost 3500 category demolition mike is leading it checklist verify no electrical or plumbing in wall shut off circuits remove door strip drywall cut studs remove platesedit_task{"title":"Demolish interior partition","plan":"FP-3","location":"main lobby","category":"demolition","assignee":"Mike","start_date":"2026-05-04","end_date":"2026-05-19","manpower":"7","cost":"3500","items":["verify no electrical or plumbing in wall","shut off circuits","remove door","strip drywall","cut studs","remove plates"]}
849change category to drywall and mark it pending inspectionedit_task{"category":"drywall","status":"pending inspection"}
850this is a roof membrane leak in the boiler room on e1 mark it needs review zack is handling it due by thursday checklist locate the breach clean and dry the area apply primer document repairedit_task{"title":"Repair roof membrane","plan":"E1","location":"boiler room","assignee":"Zack","status":"needs review","end_date":"2026-05-07","items":["locate the breach","clean and dry the area","apply primer","document repair"]}
851set priority to low location ground floor cost around 15000edit_task{"location":"ground floor","priority":"p3","cost":"15000"}
852set priority medium location level 4 cost 7000edit_task{"location":"level 4","priority":"p2","cost":"7000"}
853bump it to high priority and push the deadline to end of monthedit_task{"end_date":"2026-05-29","priority":"p1"}
854assign jake make it urgent and due by next fridayedit_task{"assignee":"Jake","end_date":"2026-05-15","priority":"p1"}
855drawing roof level location stairwell b category low voltage and assign rayedit_task{"plan":"roof level","location":"stairwell B","category":"low voltage","assignee":"Ray"}
856we need a new partition wall put up assign it to omar crew of 2 cost around 3000 start tomorrow and finish may 11 checklist snap chalk lines lay bottom plate stand studs 16 oc install top plate final walkthrough with the gcedit_task{"title":"Frame new partition wall","assignee":"Omar","start_date":"2026-05-06","end_date":"2026-05-11","manpower":"2","cost":"3000","items":["snap chalk lines","lay bottom plate","stand studs 16 OC","install top plate","final walkthrough with the GC"]}
857drawing fp3 location bay 4 category roofing and assign rayedit_task{"plan":"FP-3","location":"bay 4","category":"roofing","assignee":"Ray"}
858set priority urgent assign luis mark in progress and due by end of monthedit_task{"assignee":"Luis","status":"in progress","end_date":"2026-05-29","priority":"p1"}
859set priority medium location unit 7 cost roughly 1500edit_task{"location":"unit 7","priority":"p2","cost":"1500"}
860we've got a leak under the sink in bay 12 put bobby on it have it wrapped by next friday make it medium priority checklist shut off water supply remove p trap inspect drain line replace gaskets reinstall p trap take a photo for the recordedit_task{"title":"Fix water leak under sink","location":"bay 12","assignee":"Bobby","end_date":"2026-05-15","priority":"p2","items":["shut off water supply","remove p-trap","inspect drain line","replace gaskets","reinstall p-trap","take a photo for the record"]}
861move it to openedit_task{"status":"open"}
862gotta get attic insulation blown in at bay 12 by next friday make it urgentedit_task{"title":"Insulate attic space","location":"bay 12","end_date":"2026-05-15","priority":"p1"}
863update to needs review pleaseedit_task{"status":"needs review"}
864assign juan cost around 6000 and mark it asapedit_task{"assignee":"Juan","priority":"p1","cost":"6000"}
865budget is around 6000 and category is paintingedit_task{"category":"painting","cost":"6000"}
866pulling low voltage through the ceiling on the mezzanine starts this monday wraps up by may 4 just one guy on the crew cost 3500edit_task{"title":"Install low voltage cabling","plan":"mezzanine","start_date":"2026-05-04","end_date":"2026-05-04","manpower":"1","cost":"3500"}
867category sprinkler drawing sheet 7 and set status to on holdedit_task{"plan":"Sheet 7","category":"sprinkler","status":"on hold"}
868this one is at the lobbyedit_task{"location":"lobby"}
869set cost to around 20000 and manpower to 10 guysedit_task{"manpower":"10","cost":"20000"}
870assign steve cost about 3500 and mark it medium priorityedit_task{"assignee":"Steve","priority":"p2","cost":"3500"}
871assign sal on it and get it done by may 15edit_task{"assignee":"Sal","end_date":"2026-05-15"}
872manpower is 5 guysedit_task{"manpower":"5"}
873nadia is taking a drop ceiling install in room 305 this is drywall work high priority done by end of month manpower crew of 7 budget 7000 mark openedit_task{"title":"Install ceiling grid and tiles","location":"room 305","category":"drywall","assignee":"Nadia","status":"open","end_date":"2026-05-29","priority":"p1","manpower":"7","cost":"7000"}
874set cost to around 12000 and manpower to a team of 1edit_task{"manpower":"1","cost":"12000"}
875we've got water getting through the roof membrane in suite 3b on civil sheet 3 the gc wants it done by end of day wednesday put nadia and 2 guys on it budget 3000 make it low priority category roofingedit_task{"title":"Repair roof membrane","plan":"civil sheet 3","location":"suite 3B","category":"roofing","assignee":"Nadia","end_date":"2026-05-06","priority":"p3","manpower":"2","cost":"3000"}
876this needs a team of 8edit_task{"manpower":"8"}
877pat is leading the suspended ceiling grid install in the north corridor start tomorrow finish end of day wednesday cost 3500 and we need a team of 6 mark it on holdedit_task{"title":"Install ceiling grid and tiles","location":"north corridor","assignee":"Pat","status":"on hold","start_date":"2026-05-06","end_date":"2026-05-06","manpower":"6","cost":"3500"}
878materials came out to around 3500edit_task{"cost":"3500"}
879flag it as can waitedit_task{"priority":"p3"}
880update status to trackededit_task{"status":"tracked"}
881this one is floor tile installation on sheet 4 mark it low priority pat handles it by next tuesday budget around 4000 location room 201 category tileedit_task{"title":"Install tile flooring","plan":"Sheet 4","location":"room 201","category":"tile","assignee":"Pat","end_date":"2026-05-12","priority":"p3","cost":"4000"}
882set cost to 10000 manpower to a team of 1 and category to carpentryedit_task{"category":"carpentry","manpower":"1","cost":"10000"}
883this one is at the penthouse leveledit_task{"location":"penthouse level"}
884move it to e4edit_task{"plan":"E4"}
885assign to zack and set priority to mediumedit_task{"assignee":"Zack","priority":"p2"}
886bump it up on thisedit_task{"priority":"p1"}
887update to pending inspection pleaseedit_task{"status":"pending inspection"}
888set start date to may 4 and due date to next tuesdayedit_task{"start_date":"2026-05-04","end_date":"2026-05-12"}
889update location to unit 23edit_task{"location":"unit 23"}
890trade is mechanicaledit_task{"category":"mechanical"}
891we've got electrical rough in for the new space assign that to tony low priority end of next week is fineedit_task{"title":"Run electrical rough-in","assignee":"Tony","end_date":"2026-05-15","priority":"p3"}
892start wednesday morning finish by may 8 put dave on itedit_task{"assignee":"Dave","start_date":"2026-05-06","end_date":"2026-05-08"}
893assign zack cost 2000 and mark it mediumedit_task{"assignee":"Zack","priority":"p2","cost":"2000"}
894install recessed lighting on a202 put eddie on it low priority by end of month 10 workers budget about 1200 checklist run romex to junction box mount the housing cans connect wiring install trim rings test all fixturesedit_task{"title":"Install recessed lighting","plan":"A202","assignee":"Eddie","end_date":"2026-05-29","priority":"p3","manpower":"10","cost":"1200","items":["run romex to junction box","mount the housing cans","connect wiring","install trim rings","test all fixtures"]}
895we've got an hvac unit replacement in unit 12 put carlos on it have it wrapped by may 6 make it medium priority checklist shut down power to unit remove old unit install new unit check refrigerant lines test thermostat take a photo for the recordedit_task{"title":"Replace broken HVAC unit","location":"unit 12","assignee":"Carlos","end_date":"2026-05-06","priority":"p2","items":["shut down power to unit","remove old unit","install new unit","check refrigerant lines","test thermostat","take a photo for the record"]}
896cost 1200 crew of 1 category low voltage due by next tuesdayedit_task{"category":"low voltage","end_date":"2026-05-12","manpower":"1","cost":"1200"}
897set cost to around 12000 manpower to a team of 6 and category to carpentryedit_task{"category":"carpentry","manpower":"6","cost":"12000"}
898this one should be medium priorityedit_task{"priority":"p2"}
899opening day is may 6edit_task{"start_date":"2026-05-06"}
900start may 2 end may 4 manpower team of 5 and cost about 3500edit_task{"start_date":"2026-05-02","end_date":"2026-05-04","manpower":"5","cost":"3500"}
901set category to low voltageedit_task{"category":"low voltage"}
902budget is about 3000 and category is roofingedit_task{"category":"roofing","cost":"3000"}
903connect to drawing e4edit_task{"plan":"E4"}
904start may 3 finish before the owner review put carlos on itedit_task{"assignee":"Carlos","start_date":"2026-05-03","end_date":"2026-05-15"}
905work is in the courtyardedit_task{"location":"courtyard"}
906this is water leaking from the pipes under the sink in the west wing on civil sheet 3 mark it closed jake is handling it due by friday checklist shut off water supply remove p trap inspect drain line take photoedit_task{"title":"Fix water leak under sink","plan":"civil sheet 3","location":"west wing","assignee":"Jake","status":"closed","end_date":"2026-05-08","items":["shut off water supply","remove p-trap","inspect drain line","take photo"]}
907we're replacing the hvac unit on e1 in the cafeteria starting may 4 and wrapping may 15 crew of 1 cost about 5000 category hvac pat is leading it checklist shut down power to unit remove old unit install new unit check refrigerant lines test thermostat verify airflowedit_task{"title":"Replace broken HVAC unit","plan":"E1","location":"cafeteria","category":"HVAC","assignee":"Pat","start_date":"2026-05-04","end_date":"2026-05-15","manpower":"1","cost":"5000","items":["shut down power to unit","remove old unit","install new unit","check refrigerant lines","test thermostat","verify airflow"]}
908we've got new sprinkler heads to install assign that to maria low priority end of next week is fineedit_task{"title":"Install sprinkler heads","assignee":"Maria","end_date":"2026-05-15","priority":"p3"}
909assign pat high priority cost 12000 and due before the owner reviewedit_task{"assignee":"Pat","end_date":"2026-05-14","priority":"p1","cost":"12000"}
910bump this to high priorityedit_task{"priority":"p1"}
911it's in the east wing and status is openedit_task{"location":"east wing","status":"open"}
912hand it off to brendaedit_task{"assignee":"Brenda"}
913belongs on sheet 9edit_task{"plan":"Sheet 9"}
914set due date to before the owner reviewedit_task{"end_date":"2026-05-08"}
915set plan to p3edit_task{"plan":"P-3"}
916we're scheduling sprinkler head install for the east lobby on a101 need a team of 10 starting wednesday morning through end of month ballpark cost 8000edit_task{"title":"Install sprinkler heads","plan":"A101","location":"east lobby","start_date":"2026-05-06","end_date":"2026-05-29","manpower":"10","cost":"8000"}
917allocate a crew of 7 to thisedit_task{"manpower":"7"}
918labor and materials around 6000edit_task{"cost":"6000"}
919flip it to pending inspectionedit_task{"status":"pending inspection"}
920we'll have a team of 4 on siteedit_task{"manpower":"4"}
921assign jake low priority cost 10000 and due by end of day wednesdayedit_task{"assignee":"Jake","end_date":"2026-05-06","priority":"p3","cost":"10000"}
922set cost to around 1500 manpower to a team of 9 and category to fire suppressionedit_task{"category":"fire suppression","manpower":"9","cost":"1500"}
923complete this before the inspectionedit_task{"end_date":"2026-05-09"}
924it's fire alarmedit_task{"category":"fire alarm"}
925set cost to 15000 manpower to a team of 1 and category to low voltageedit_task{"category":"low voltage","manpower":"1","cost":"15000"}
926set it to pending inspectionedit_task{"status":"pending inspection"}
927start no later than may 6edit_task{"start_date":"2026-05-06"}
928assign nadia cost about 6000 and mark it urgentedit_task{"assignee":"Nadia","priority":"p1","cost":"6000"}
929we're doing the exterior paint in stairwell a put gus on it have it wrapped by may 8 make it medium priority checklist pressure wash surface scrape loose paint apply primer caulk gaps and cracks roll first coat take a photo for the recordedit_task{"title":"Paint exterior facade","location":"stairwell A","assignee":"Gus","end_date":"2026-05-08","priority":"p2","items":["pressure wash surface","scrape loose paint","apply primer","caulk gaps and cracks","roll first coat","take a photo for the record"]}
930team of 10 on this oneedit_task{"manpower":"10"}
931want it wrapped by end of monthedit_task{"end_date":"2026-05-29"}
932set priority asap location east wing cost 4000edit_task{"location":"east wing","priority":"p1","cost":"4000"}
933set priority to low assign danny mark open and due by next tuesdayedit_task{"assignee":"Danny","status":"open","end_date":"2026-05-12","priority":"p3"}
934set cost to around 12000 manpower to a team of 1 and category to hvacedit_task{"category":"HVAC","manpower":"1","cost":"12000"}
935priority two on thisedit_task{"priority":"p2"}
936assign to hector and set priority to mediumedit_task{"assignee":"Hector","priority":"p2"}
937this one is a new partition wall on a4 mark it medium priority ray handles it by friday budget around 5000 location mechanical room category framingedit_task{"title":"Frame new partition wall","plan":"A-4","location":"mechanical room","category":"framing","assignee":"Ray","end_date":"2026-05-08","priority":"p2","cost":"5000"}
938connect to drawing a101edit_task{"plan":"A101"}
939we're installing low voltage cabling on m2 in stairwell c starting wednesday morning and wrapping may 6 9 guys on it cost 10000 category low voltage bobby is leading it checklist pull permits if required route cable path drill penetrations pull cable terminate at patch panel test all runsedit_task{"title":"Install low voltage cabling","plan":"M2","location":"stairwell C","category":"low voltage","assignee":"Bobby","start_date":"2026-05-06","end_date":"2026-05-06","manpower":"9","cost":"10000","items":["pull permits if required","route cable path","drill penetrations","pull cable","terminate at patch panel","test all runs"]}
940move to a3 and make it high priorityedit_task{"plan":"A-3","priority":"p1"}
941assign troy on it and get it done by may 8edit_task{"assignee":"Troy","end_date":"2026-05-08"}
942move it to a301edit_task{"plan":"A301"}
943set priority p2 location stairwell b cost about 7000edit_task{"location":"stairwell B","priority":"p2","cost":"7000"}
944category sprinkler drawing fp2 and set status to verifiededit_task{"plan":"FP-2","category":"sprinkler","status":"verified"}
945set start date to may 2 and due date to thursdayedit_task{"start_date":"2026-05-02","end_date":"2026-05-07"}
946that's on tonyedit_task{"assignee":"Tony"}
947materials came out to about 3500edit_task{"cost":"3500"}
948juan should own thisedit_task{"assignee":"Juan"}
949flag it as urgentedit_task{"priority":"p1"}
950hand it off to omaredit_task{"assignee":"Omar"}
951assign brenda medium priority cost about 2500 and due by next tuesdayedit_task{"assignee":"Brenda","end_date":"2026-05-12","priority":"p2","cost":"2500"}
952put cost down as 20000edit_task{"cost":"20000"}
953estimate is 2000edit_task{"cost":"2000"}
954labor and materials around 8000edit_task{"cost":"8000"}
955status update to in progressedit_task{"status":"in_progress"}
956pulling low voltage through the ceiling in the mechanical room budget about 3000 assign bobbyedit_task{"title":"Install low voltage cabling","location":"mechanical room","assignee":"Bobby","cost":"3000"}
957felix is taking the new pull station install on the ground floor this is fire alarm work low priority done by may 8 manpower team of 3 budget 20000 mark trackededit_task{"title":"Install fire alarm pull station","location":"ground floor","category":"fire alarm","assignee":"Felix","status":"tracked","end_date":"2026-05-08","priority":"p3","manpower":"3","cost":"20000"}
958assign to omar and set priority to priority twoedit_task{"assignee":"Omar","priority":"p2"}
959move it to completeedit_task{"status":"complete"}
960connect to drawing sheet 7edit_task{"plan":"Sheet 7"}
961tag it to id101edit_task{"plan":"ID-101"}
962assign to sarah and set priority to can waitedit_task{"assignee":"Sarah","priority":"p3"}
963assign luis cost 15000 and mark it not criticaledit_task{"assignee":"Luis","priority":"p3","cost":"15000"}
964update plan to e2edit_task{"plan":"E-2"}
965opening day is may 4edit_task{"start_date":"2026-05-04"}
966set start date to wednesday morning and due date to may 7edit_task{"start_date":"2026-05-06","end_date":"2026-05-07"}
967set start date to may 3 and due date to end of monthedit_task{"start_date":"2026-05-03","end_date":"2026-05-29"}
968change category to glazing and mark it completeedit_task{"category":"glazing","status":"complete"}
969assign ray high priority cost 800 and due by may 6edit_task{"assignee":"Ray","end_date":"2026-05-06","priority":"p1","cost":"800"}
970move this to a3 and set location to mezzanineedit_task{"plan":"A-3","location":"mezzanine"}
971move to fp2 location level 5 and mark pending inspectionedit_task{"plan":"FP-2","location":"level 5","status":"pending inspection"}
972pass it to vicedit_task{"assignee":"Vic"}
973set priority high priority location grid line b2 cost about 2000edit_task{"location":"grid line B2","priority":"p1","cost":"2000"}
974set priority to p1 location boiler room cost 8000edit_task{"location":"boiler room","priority":"p1","cost":"8000"}
975move to fp3 location room 201 and mark closededit_task{"plan":"FP-3","location":"room 201","status":"closed"}
976assign dave cost 2500 and mark it not a rushedit_task{"assignee":"Dave","priority":"p3","cost":"2500"}
977set start date to next tuesday and due date to next tuesdayedit_task{"start_date":"2026-05-12","end_date":"2026-05-12"}
978start may 4 finish by friday put danny on itedit_task{"assignee":"Danny","start_date":"2026-05-04","end_date":"2026-05-08"}
979bump it to medium and push deadline to may 21edit_task{"end_date":"2026-05-21","priority":"p2"}
980expected finish may 16edit_task{"end_date":"2026-05-16"}
981set priority to p1 location parking garage level 1 cost about 20000edit_task{"location":"parking garage level 1","priority":"p1","cost":"20000"}
982assign nadia cost 12000 and mark it medium priorityedit_task{"assignee":"Nadia","priority":"p2","cost":"12000"}
983set location to mechanical roomedit_task{"location":"mechanical room"}
984budget is around 8000 and category is sprinkleredit_task{"category":"sprinkler","cost":"8000"}
985tag mike as assigneeedit_task{"assignee":"Mike"}
986budget is 15000edit_task{"cost":"15000"}
987category insulation drawing mep1 and set status to in progressedit_task{"plan":"MEP-1","category":"insulation","status":"in progress"}
988set start to next tuesdayedit_task{"start_date":"2026-05-12"}
989move to e2 location break room floor 2 and mark verifiededit_task{"plan":"E-2","location":"break room floor 2","status":"verified"}
990set priority to lowedit_task{"priority":"p3"}
991assign juan set priority to top priority and due by fridayedit_task{"assignee":"Juan","end_date":"2026-05-08","priority":"p1"}
992update location to mechanical roomedit_task{"location":"mechanical room"}
993put it at south corridoredit_task{"location":"south corridor"}
994assign bobby cost 8000 and mark it low priorityedit_task{"assignee":"Bobby","priority":"p3","cost":"8000"}
995pass it to nadiaedit_task{"assignee":"Nadia"}
996status is in progressedit_task{"status":"in progress"}
997bump it to p1 assign omar mark open and due by next tuesdayedit_task{"assignee":"Omar","status":"open","end_date":"2026-05-12","priority":"p1"}
998move to a301 and make it lowedit_task{"plan":"A301","priority":"p3"}
999start wednesday morning finish before the gc walkthrough put pat on itedit_task{"assignee":"Pat","start_date":"2026-05-06","end_date":"2026-05-15"}
1000set cost to 2500 and manpower to a crew of 5edit_task{"manpower":"5","cost":"2500"}
1001change title to steel staircase handrail installedit_task{"title":"steel staircase handrail install"}
1002change title to foundation waterproofing phase 1edit_task{"title":"foundation waterproofing phase 1"}
1003change title to lobby tile replacementedit_task{"title":"lobby tile replacement"}
1004change title to rooftop equipment pad pouredit_task{"title":"rooftop equipment pad pour"}
1005change title to exterior window caulking east walledit_task{"title":"exterior window caulking east wall"}
1006change title to bathroom exhaust fan replacement and assign to hectoredit_task{"title":"bathroom exhaust fan replacement","assignee":"Hector"}
1007change title to sprinkler main drain test and mark it p1edit_task{"title":"sprinkler main drain test","priority":"p1"}
1008change title to concrete crack repair suite 110edit_task{"title":"concrete crack repair suite 110"}
1009change title to generator transfer switch installedit_task{"title":"generator transfer switch install"}
1010change title to drywall fire stop above t bar ceilingedit_task{"title":"drywall fire stop above T-bar ceiling"}
1011rename to roof drain cleaning level 3edit_task{"title":"roof drain cleaning level 3"}
1012rename to curtain wall panel replacement grid c4edit_task{"title":"curtain wall panel replacement grid C4"}
1013rename to electrical panel upgrade building bedit_task{"title":"electrical panel upgrade building B"}
1014rename to fire door hardware repair stairwell 2edit_task{"title":"fire door hardware repair stairwell 2"}
1015rename to sump pump replacement basement level 2edit_task{"title":"sump pump replacement basement level 2"}
1016rename to west wing carpet removal and set priority to p2edit_task{"title":"west wing carpet removal","priority":"p2"}
1017rename to loading dock overhead door service and assign to rayedit_task{"title":"loading dock overhead door service","assignee":"Ray"}
1018rename to mechanical room pipe insulation wrapedit_task{"title":"mechanical room pipe insulation wrap"}
1019rename to penthouse terrace membrane patchedit_task{"title":"penthouse terrace membrane patch"}
1020rename to elevator pit waterproofingedit_task{"title":"elevator pit waterproofing"}
1021rename this to kitchen hood duct cleaningedit_task{"title":"kitchen hood duct cleaning"}
1022rename this to glass handrail panel replacement lobbyedit_task{"title":"glass handrail panel replacement lobby"}
1023rename this to fire suppression pipe flush zone 4edit_task{"title":"fire suppression pipe flush zone 4"}
1024rename this to structural steel touch up coatedit_task{"title":"structural steel touch-up coat"}
1025rename this to emergency exit light replacement stair bedit_task{"title":"emergency exit light replacement stair B"}
1026rename this to boiler flue inspection and set end date to may 20edit_task{"title":"boiler flue inspection","end_date":"2026-05-20"}
1027rename this to perimeter fence repair south lot and assign to felixedit_task{"title":"perimeter fence repair south lot","assignee":"Felix"}
1028rename this to loading dock concrete apron repairedit_task{"title":"loading dock concrete apron repair"}
1029rename this to data closet cable tray install floor 4edit_task{"title":"data closet cable tray install floor 4"}
1030rename this to cooling tower chemical treatmentedit_task{"title":"cooling tower chemical treatment"}
1031set title to plumbing rough in unit 4bedit_task{"title":"plumbing rough-in unit 4B"}
1032set title to parking garage line striping phase 2edit_task{"title":"parking garage line striping phase 2"}
1033set title to ahu filter replacement rooftop unit 1edit_task{"title":"AHU filter replacement rooftop unit 1"}
1034set title to window sill repair south elevationedit_task{"title":"window sill repair south elevation"}
1035set title to fire rated ceiling patch room 305edit_task{"title":"fire rated ceiling patch room 305"}
1036set title to compressed air line install shop floor and set manpower to 3edit_task{"title":"compressed air line install shop floor","manpower":"3"}
1037set title to expansion joint replacement deck level 2 and mark completeedit_task{"title":"expansion joint replacement deck level 2","status":"complete"}
1038set title to grease trap cleaning cafeteriaedit_task{"title":"grease trap cleaning cafeteria"}
1039set title to stair nosing repair east stairwelledit_task{"title":"stair nosing repair east stairwell"}
1040set title to rebar placement footing f7edit_task{"title":"rebar placement footing F7"}
1041update the name to plywood subfloor installation zone cedit_task{"title":"plywood subfloor installation zone C"}
1042update the name to chilled water pipe insulation level 5edit_task{"title":"chilled water pipe insulation level 5"}
1043update the name to skylight leak repair grid j9edit_task{"title":"skylight leak repair grid J9"}
1044update the name to seismic brace install mechanical roomedit_task{"title":"seismic brace install mechanical room"}
1045update the name to exterior stucco patch west walledit_task{"title":"exterior stucco patch west wall"}
1046update the name to high bay light fixture swap and assign to tonyedit_task{"title":"high bay light fixture swap","assignee":"Tony"}
1047update the name to overhead door spring replacement bay 3 and set cost to 750edit_task{"title":"overhead door spring replacement bay 3","cost":"750"}
1048update the name to balcony railing weld repair unit 7edit_task{"title":"balcony railing weld repair unit 7"}
1049update the name to crawl space vapor barrier installedit_task{"title":"crawl space vapor barrier install"}
1050update the name to framing inspection punch listedit_task{"title":"framing inspection punch list"}
1051call it sidewalk saw cut and patch front entryedit_task{"title":"sidewalk saw cut and patch front entry"}
1052call it retaining wall crack injection and set priority to p2edit_task{"title":"retaining wall crack injection","priority":"p2"}
1053call it vestibule door closer replacementedit_task{"title":"vestibule door closer replacement"}
1054label it transformer pad grading and drainageedit_task{"title":"transformer pad grading and drainage"}
1055label it hvac vibration isolator replacement rooftop and assign to saledit_task{"title":"HVAC vibration isolator replacement rooftop","assignee":"Sal"}
1056label it masonry tuck pointing south facadeedit_task{"title":"masonry tuck-pointing south facade"}
1057name it conduit stub up for panel lp2edit_task{"title":"conduit stub-up for panel LP-2"}
1058name it structural column base plate inspection and mark on holdedit_task{"title":"structural column base plate inspection","status":"on hold"}
1059name it fire caulk penetration seal third floor and assign to daveedit_task{"title":"fire caulk penetration seal third floor","assignee":"Dave"}
1060name it air barrier tape sealing north walledit_task{"title":"air barrier tape sealing north wall"}
1061assign this to mike and set priority to highedit_task{"assignee":"Mike","priority":"p1"}
1062change the due date to next fridayedit_task{"end_date":"2026-05-15"}
1063set status to completeedit_task{"status":"complete"}
1064reassign to sarah and move deadline to may 20edit_task{"assignee":"Sarah","end_date":"2026-05-20"}
1065this is an electrical job in the basementedit_task{"category":"electrical","location":"basement"}
1066tag this as urgent and safetyedit_task{"tags":["urgent","safety"]}
1067add a note that we need to order more conduit before startingedit_task{"comments":"we need to order more conduit before starting"}
1068set manpower to 4edit_task{"manpower":"4"}
1069cost is 2500edit_task{"cost":"2500"}
1070start date is monday and due date is wednesdayedit_task{"start_date":"2026-05-11","end_date":"2026-05-13"}
1071change title to hvac install level 3edit_task{"title":"HVAC install level 3"}
1072mark as verifiededit_task{"status":"verified"}
1073move this to the lobby area and assign to carlosedit_task{"location":"lobby","assignee":"Carlos"}
1074this is plumbing work on drawing b2edit_task{"category":"plumbing","plan":"B2"}
1075add checklist items install pipes test pressure seal jointsedit_task{"items":["install pipes","test pressure","seal joints"]}
1076change status to in reviewedit_task{"status":"in review"}
10773 workers needed for this oneedit_task{"manpower":"3"}
1078due tomorrowedit_task{"end_date":"2026-05-06"}
1079assign to the electrical crew and tag it as inspectionedit_task{"assignee":"electrical crew","tags":["inspection"]}
1080this job is on plan a3 room 101edit_task{"plan":"A3","location":"room 101"}
1081set cost to 800 and manpower to 2edit_task{"cost":"800","manpower":"2"}
1082mark as trackededit_task{"status":"tracked"}
1083framing work starts next mondayedit_task{"category":"framing","start_date":"2026-05-11"}
1084add note waiting on permit approvaledit_task{"comments":"waiting on permit approval"}
1085change assignee to tom priority is p2edit_task{"assignee":"Tom","priority":"p2"}
1086location is 2nd floor east wingedit_task{"location":"2nd floor east wing"}
1087tag urgentedit_task{"tags":["urgent"]}
1088title should be roof membrane repairedit_task{"title":"Roof membrane repair"}
1089set end date to end of monthedit_task{"end_date":"2026-05-29"}
1090hvac work on level 4 assign to daveedit_task{"category":"HVAC","location":"level 4","assignee":"Dave"}
1091checklist demo old tiles prep surface install new tiles groutedit_task{"items":["demo old tiles","prep surface","install new tiles","grout"]}
1092cost 1200 bucksedit_task{"cost":"1200"}
1093change priority to mediumedit_task{"priority":"p2"}
1094start this on the 10th finish by the 15thedit_task{"start_date":"2026-05-10","end_date":"2026-05-15"}
1095it's a plumbing issue in room 209 mark it openedit_task{"category":"plumbing","location":"room 209","status":"open"}
1096add comment inspector coming thursday need this done by wednesdayedit_task{"comments":"inspector coming Thursday need this done by Wednesday"}
1097reassign from mike to jakeedit_task{"assignee":"Jake"}
1098tag this fire safety and blockededit_task{"tags":["fire safety","blocked"]}
1099this is on drawing c5edit_task{"plan":"C5"}
1100set to complete 5 guys on this job cost was 3400edit_task{"status":"complete","manpower":"5","cost":"3400"}
1101electrical in the server room priority highedit_task{"category":"electrical","location":"server room","priority":"p1"}
1102move deadline to next weekedit_task{"end_date":"2026-05-12"}
1103assign to maria add note she needs badge accessedit_task{"assignee":"Maria","comments":"she needs badge access"}
1104start date todayedit_task{"start_date":"2026-05-05"}
1105change title to fire suppression inspection and set priority p1edit_task{"title":"Fire suppression inspection","priority":"p1"}
11062 workers cost 600edit_task{"manpower":"2","cost":"600"}
1107mark verified location is stairwell bedit_task{"status":"verified","location":"stairwell B"}
1108it's on plan d1 level 1 assign to night crewedit_task{"plan":"D1","location":"level 1","assignee":"night crew"}
1109leave a note that the concrete needs to cure for 48 hours before loadingedit_task{"comments":"concrete needs to cure for 48 hours before loading"}
1110add a comment gc requested this be done before the owner walkthroughedit_task{"comments":"GC requested this be done before the owner walkthrough"}
1111note that we're waiting on the permit to come throughedit_task{"comments":"waiting on permit to come through"}
1112add note ceiling height in this area is 9 feet not 10edit_task{"comments":"ceiling height in this area is 9 feet not 10"}
1113put a note that the material is already on siteedit_task{"comments":"material is already on site"}
1114add a comment that the adjacent unit is occupied so keep noise down after 6pmedit_task{"comments":"adjacent unit is occupied so keep noise down after 6pm"}
1115note asbestos survey required before demoedit_task{"comments":"asbestos survey required before demo"}
1116add comment the owner wants daily progress photosedit_task{"comments":"owner wants daily progress photos"}
1117leave a note that access requires escort from building securityedit_task{"comments":"access requires escort from building security"}
1118add a note the existing conduit is undersized might need upsizingedit_task{"comments":"existing conduit is undersized might need upsizing"}
1119note that the inspector is coming friday morningedit_task{"comments":"inspector is coming Friday morning"}
1120add comment coordinate with the plumber before roughing inedit_task{"comments":"coordinate with the plumber before roughing in"}
1121put a note that this is a warranty repair not new workedit_task{"comments":"this is a warranty repair not new work"}
1122add note we need to order the glass panel it's not in stockedit_task{"comments":"we need to order the glass panel it's not in stock"}
1123leave a comment that the water shutoff is in the basement mechanical roomedit_task{"comments":"water shutoff is in the basement mechanical room"}
1124note that the gc wants a 2 hour notice before we start demoedit_task{"comments":"GC wants a 2 hour notice before we start demo"}
1125add a note match existing paint color exactly sample on siteedit_task{"comments":"match existing paint color exactly sample on site"}
1126comment that this task is blocked waiting on structural engineer sign offedit_task{"comments":"this task is blocked waiting on structural engineer sign off"}
1127assign to jake and add a note he needs a scissor lift for this oneedit_task{"assignee":"Jake","comments":"he needs a scissor lift for this one"}
1128mark it p1 and note that the tenant is complaining every dayedit_task{"priority":"p1","comments":"tenant is complaining every day"}
1129set status to on hold and add note waiting on material deliveryedit_task{"status":"on hold","comments":"waiting on material delivery"}
1130due by friday and leave a note that overtime is approved for this oneedit_task{"end_date":"2026-05-08","comments":"overtime is approved for this one"}
1131bump to p1 and note roof leak is getting worse with the rainedit_task{"priority":"p1","comments":"roof leak is getting worse with the rain"}
1132set cost to 4500 and add a comment this includes labor and materialsedit_task{"cost":"4500","comments":"this includes labor and materials"}
1133assign to carlos note he needs badge access to get into the server roomedit_task{"assignee":"Carlos","comments":"he needs badge access to get into the server room"}
1134mark it verified and note the inspector signed off this morningedit_task{"status":"verified","comments":"the inspector signed off this morning"}
1135set manpower to 3 and add note the fourth guy called in sickedit_task{"manpower":"3","comments":"the fourth guy called in sick"}
1136location is suite 204 and note the elevator is out use the freight entranceedit_task{"location":"suite 204","comments":"the elevator is out use the freight entrance"}
1137set priority p2 and add a comment this can wait until after the inspection mondayedit_task{"priority":"p2","comments":"this can wait until after the inspection Monday"}
1138push deadline to end of month and note we're waiting on back ordered partsedit_task{"end_date":"2026-05-29","comments":"we're waiting on back ordered parts"}