### What this PR does / why we need it?
1. Refactor ci to reuse base workflow and enable main 2 hours trigger
job:
- Extract e2e test in to _e2e_test.yaml
- Reuse _e2e_test in light / full job
- Enable main 2 hours trigger job
2. Rename e2e test to ascend test to make sure action display label
3. Re-enable ut coverage which was failed since
5bcb4c1528
and disable on
6d8bc38c7b
### Does this PR introduce _any_ user-facing change?
Only developer behavior changes:
- Every job trigger full test with vllm release and hash
- Run full job per 2 hours with vllm main
- e2e light test (30 mins): `lint` (6mins) ---> ut (10mins) --->
`v0.10.2 + main / 4 jobs` (15mins)
- e2e full test (1.5h): `ready label` ---> `v0.10.2 + main / 4 jobs`,
about 1.5h
- schedule test: 2hours ---> `v0.10.2 + main / 4 jobs`, about 1.5h
### How was this patch tested?
CI passed
- vLLM version: v0.10.2
- vLLM main:
c60e6137f0
Signed-off-by: Yikun Jiang <yikunkero@gmail.com>