### What this PR does / why we need it?
Use Base test and cleanup all manaul patch code
- Cleanup EPLB config to avoid tmp test file
- Use BaseTest with global cache
- Add license
- Add a doc to setup unit test in local env
### Does this PR introduce _any_ user-facing change?
No
### How was this patch tested?
CI passed
Signed-off-by: Yikun Jiang <yikunkero@gmail.com>
### What this PR does / why we need it?
1. drop some useless code for w8a8 fusedmoe
2. Add in8 kv cache check
3. Add more ut.
### Does this PR introduce _any_ user-facing change?
No
### How was this patch tested?
CI passed with new added test.
---------
Signed-off-by: zhuyilin <809721801@qq.com>
Signed-off-by: tianyitang <tangtianyi4@huawei.com>
Co-authored-by: tianyitang <tangtianyi4@huawei.com>