Commit Graph

2 Commits

Author SHA1 Message Date
Mengqing Cao
edf1f600ad [CI] Remove compatibility maintenance for vllm v0.10.1 and v0.10.1.1 (#2840)
### What this PR does / why we need it?
Remove compatibility maintenance for vllm v0.10.1 and v0.10.1.1

### Does this PR introduce _any_ user-facing change?
branch main of vllm-ascend will not be compatible with vllm v0.10.1 and
v0.10.1.1

### How was this patch tested?
CI passed with existing test.

- vLLM version: v0.10.1.1
- vLLM main:
6fb2788163

---------

Signed-off-by: MengqingCao <cmq0113@163.com>
2025-09-10 08:43:10 +08:00
wangxiyuan
5bcb4c1528 [CI] Reduce CI time (#2801)
1. Only run light e2e test before the PR is `ready` to reduce CI time.
2. Run full test once the PR is labled `ready` and `ready for test`
3. Run lint job on self host CPU container to avoid waiting much.


- vLLM version: v0.10.1.1
- vLLM main:
6910b56da2

Signed-off-by: wangxiyuan <wangxiyuan1007@gmail.com>
2025-09-09 10:52:14 +08:00