Commit Graph

4 Commits

Author SHA1 Message Date
Yikun Jiang
c4a71fc6d5 Remove cancel for main to main check (#4685)
### What this PR does / why we need it?
Remove cancel for main to main check. Another choice we set timeout to
4h but I think 2h to get results is more important.

Related:

https://github.com/vllm-project/vllm-ascend/actions/workflows/vllm_ascend_test_full_vllm_main.yaml

### Does this PR introduce _any_ user-facing change?
No

### How was this patch tested?
Can be merged directly if lint passed
- vLLM version: v0.12.0
- vLLM main: https://github.com/vllm-project/vllm/commit/v0.12.0

Signed-off-by: Yikun Jiang <yikunkero@gmail.com>
2025-12-04 09:10:27 +08:00
SILONG ZENG
ab37a7d5ae [main]Upgrade cann to 8.3rc2 (#4350)
### What this PR does / why we need it?
Upgrade cann to 8.3rc2

### Does this PR introduce _any_ user-facing change?
Yes, docker image will use 8.3.RC2


- vLLM version: v0.11.2
- vLLM main: https://github.com/vllm-project/vllm/commit/v0.11.2

---------

Signed-off-by: MrZ20 <2609716663@qq.com>
2025-11-28 14:06:01 +08:00
wangxiyuan
cc2cd42ad3 Upgrade CANN to 8.3.rc1 (#3945)
### What this PR does / why we need it?
This PR upgrade CANN from 8.2rc1 to 8.3rc1 and remove the CANN version
check logic.

TODO: we notice that UT runs failed with CANN 8.3 image. So the base
image for UT is still 8.2. We'll fix it later.


- vLLM version: v0.11.0
- vLLM main:
83f478bb19

Signed-off-by: wangxiyuan <wangxiyuan1007@gmail.com>
2025-11-03 20:21:07 +08:00
Yikun Jiang
693f547ccf Refactor ci to reuse base workflow and re-enable ut coverage (#3064)
### What this PR does / why we need it?
1. Refactor ci to reuse base workflow and enable main 2 hours trigger
job:
- Extract e2e test in to _e2e_test.yaml
- Reuse _e2e_test in light / full job
- Enable main 2 hours trigger job

2. Rename e2e test to ascend test to make sure action display label 
3. Re-enable ut coverage which was failed since
5bcb4c1528
and disable on
6d8bc38c7b

### Does this PR introduce _any_ user-facing change?
Only developer behavior changes:
- Every job trigger full test with vllm release and hash
- Run full job per 2 hours with vllm main
- e2e light test (30 mins): `lint` (6mins) ---> ut (10mins) --->
`v0.10.2 + main / 4 jobs` (15mins)
- e2e full test (1.5h): `ready label` ---> `v0.10.2 + main / 4 jobs`,
about 1.5h
- schedule test: 2hours ---> `v0.10.2 + main / 4 jobs`, about 1.5h 

### How was this patch tested?
CI passed


- vLLM version: v0.10.2
- vLLM main:
c60e6137f0

Signed-off-by: Yikun Jiang <yikunkero@gmail.com>
2025-09-21 13:27:08 +08:00