### What this PR does / why we need it?
[CI] Upgrade CANN to 8.5.1
### Does this PR introduce _any_ user-facing change?
N/A
### How was this patch tested?
CI passed with existing test.
- vLLM version: v0.16.0
- vLLM main:
15d76f74e2
Signed-off-by: wxsIcey <1790571317@qq.com>
### What this PR does / why we need it?
Revert speedup image building and CI Installation related PRs
git revert 8835236181
git revert 64fba51275
git revert 263c2f8e8d
git revert 84b00695f8
### Does this PR introduce _any_ user-facing change?
### How was this patch tested?
- vLLM version: v0.16.0
- vLLM main:
15d76f74e2
---------
Signed-off-by: wjunLu <wjunlu217@gmail.com>
### What this PR does / why we need it?
1. Refactor image workflow using cache-from to speedup builds

Simultaneously refactored all Dockerfiles by placing layers that rarely
change before those that change frequently, improving build cache hit
rate.
2. Refactor E2E test using vllm-ascend container images, to skip C
compile while no C code are changed

In this case, the job will only replace the source code of vllm-ascend
and install `requirements-dev.txt`, saving about 10min before tests
### Does this PR introduce _any_ user-facing change?
### How was this patch tested?
- vLLM version: v0.15.0
- vLLM main:
9562912cea
Signed-off-by: wjunLu <wjunlu217@gmail.com>
### What this PR does / why we need it?
- This PR removes several self-hosted runner labels from the
`actionlint.yaml` configuration file. These runners are likely no longer
in use, so this change cleans up the configuration and ensures
`actionlint` has an accurate list of available runners.
- Move all Action dockerfiles to one folder
- remove useless `runner` input for e2e test.
- update workflow option version
### Does this PR introduce _any_ user-facing change?
No.
### How was this patch tested?
This is a configuration change for the CI linter. The correctness will
be verified by `actionlint` running in CI on subsequent pull requests.
- vLLM version: v0.15.0
- vLLM main:
d7e17aaacd
Signed-off-by: wangxiyuan <wangxiyuan1007@gmail.com>
### What this PR does / why we need it?
This PR updates the CI runner from `linux-aarch64-a2-*` to
`linux-aarch64-a2b3-*` in various test configuration files. This change
is necessary to adapt to updates in the CI infrastructure.
### Does this PR introduce _any_ user-facing change?
No.
### How was this patch tested?
The changes are configuration updates for CI tests. The correctness will
be verified by the CI pipeline.
Signed-off-by: hfadzxy <starmoon_zhang@163.com>
This PR add 310 e2e test back to ensure the related PR will be tested on
310.
1. for light e2e, we'll run 310p test if the changed files are located
in `vllm_ascend/_310p`
2. for full e2e, we'll always run 310p test
3. for main2main test, we'll stop run 310p test
- vLLM version: v0.13.0
- vLLM main:
2f4e6548ef
Signed-off-by: wangxiyuan <wangxiyuan1007@gmail.com>
1. Don't run lint and ut again once the PR is merged to save CI resource
2. Update codecov every 4 hour
3. rename `model_downloader` to suitable name
4. update schedule job to better time.
- vLLM version: v0.13.0
- vLLM main:
2f4e6548ef
Signed-off-by: wangxiyuan <wangxiyuan1007@gmail.com>